If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: 2005-09 | + | | License Date: 2005-02-09 |
|- | |- | ||
| Spud Date: 2005-03-03 | | Spud Date: 2005-03-03 |
Well ID: 34-031-26965 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.23873758,"lon":-81.67833133,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Coshocton | |
Municipality: Oxford Township | |
Operator Name: MFC DRILLING INC | |
Well Pad ID: | |
Farm/Lease Name: CAPSTONE | |
License Status: Producing | |
License Date: 2005-02-09 | |
Spud Date: 2005-03-03 | |
Spud Drilling Contractor: MARIC DRILLING CO. | |
Final Drill Date: 2005-03-09 | |
Well Total Depth: 4628 ft | |
Configuration: Vertical | |
Latitude: 40.238737580 | |
Longitude: -81.67833133 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-02-09 | Proposed Formations:CLINTON, Issued Date:2/9/2005, Expired Date:2/9/2006 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2005-03-03 | RBDMS Rec |
Completed | 2005-03-09 | RBDMS Rec |
Reached Total Depth | 2005-03-09 | RBDMS Rec |
Completion Report Received | 2005-06-29 | RBDMS Rec |
Construction Permit Expires | 2006-02-09 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2005-09-07 | 4457 | 4488 | 32 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 118500 Gal | 50000 | 500 GALLONS HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | MFC DRILLING INC | 7601 | 172 | 365 |
2006 | MFC DRILLING INC | 9896 | 223 | 365 |
2007 | MFC DRILLING INC | 4972 | 107 | 365 |
2008 | MFC DRILLING INC | 2712 | 0 | 365 |
2009 | MFC DRILLING INC | 1644 | 63 | 365 |
2010 | MFC DRILLING INC | 864 | 74 | 365 |
2011 | MFC DRILLING INC | 872 | 0 | 365 |
2012 | MFC DRILLING INC | 1123 | 67 | 366 |
2013 | MFC DRILLING INC | 1827 | 69 | 365 |
2014 | MFC DRILLING INC | 1749 | 51 | 365 |
2015 | MFC DRILLING INC | 1186 | 0 | 365 |
2016 | MFC DRILLING INC | 1154 | 63 | 365 |
2017 | MFC DRILLING INC | 1419 | 0 | 365 |
2018 | MFC DRILLING INC | 998 | 41 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2005 | MFC DRILLING INC | Brine | 227 | 365 |
2006 | MFC DRILLING INC | Brine | 56 | 365 |
2007 | MFC DRILLING INC | Brine | 0 | 365 |
2008 | MFC DRILLING INC | Brine | 36 | 365 |
2009 | MFC DRILLING INC | Brine | 0 | 365 |
2010 | MFC DRILLING INC | Brine | 0 | 365 |
2011 | MFC DRILLING INC | Brine | 0 | 365 |
2012 | MFC DRILLING INC | Brine | 9 | 366 |
2013 | MFC DRILLING INC | Brine | 0 | 365 |
2014 | MFC DRILLING INC | Brine | 0 | 365 |
2015 | MFC DRILLING INC | Brine | 9 | 365 |
2016 | MFC DRILLING INC | Brine | 0 | 365 |
2017 | MFC DRILLING INC | Brine | 0 | 365 |
2018 | MFC DRILLING INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0308930974 | 2012-11-01 | Production Wells | No Violations | On the day of my inspection I found that the well head was equipped with a plunger lift system and connected to a tank battery that consisted of two 100 barrel stock tanks, one separator and an earthen dike. Proper identification was posted and there were no leaks or spills at the well head or tank battery. No violations at this time. |
0639715598 | 2005-10-17 | Preliminary Restoration | No Violations | Restoration completed . |
1526224933 | 2010-10-06 | Production Wells | No Violations | Well capable of production. |
1591108115 | 2012-01-26 | Production Wells | No Violations | Inspection completed this date. The well is capable of production and equipped as a gas well, 2-100 barrel storage tanks and a separator. |
For data sources see[9]