X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-31161"

m
 
m
Line 1: Line 1:
 +
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable" width="95%"
 
{| class="wikitable" width="95%"
Line 23: Line 24:
 
|-
 
|-
 
|}
 
|}
__TOC__
 
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"

Revision as of 19:04, 17 June 2014

Well Details

Well ID: 37-005-31161
Loading map...
Operator Name: BAKER GAS INC
First Permit Date: 2013-08-21
Last Permit Date: 2013-08-21
Spud Date: 2013-11-07
Unconventional: No
Horizontal: No
Violations: None
Latitude: 40.655794
Longitude: -79.503861

Production Data

PERIOD GAS QUANTITY GAS PRODUCTION DAYS CONDENSATE QUANTITY CONDENSATE PRODUCTION DAYS OIL QUANTITY OIL PRODUCTION DAYS
2013-0 0.0 0.0 0.0 0.0 0.0 0.0

Waste Data

PERIOD TYPE QUANTITY UNITS DISPOSAL METHOD WASTE FACILITY PERMIT ID WASTE FACILITY NAME FACILITY CITY FACILITY STATE
2013-0 DRILLING FLUID WASTE 250.0 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443 CREEKSIDE TREATMENT FACILITY CREEKSIDE PA

Inspection Data

INSPECTION ID DATE DESCRIPTION COMMENT VIOLATION ID
2219492 2013-11-06 Armstrong Parks Twp No Violations Noted
2222007 2013-11-06 Armstrong Parks Twp No Violations Noted
2225962 2013-12-03 Armstrong Parks Twp No Violations Noted
2235749 2014-01-13 No Violations Noted Well appeared to be equipped for production. Site had been effectively regraded and temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that the culvert in place to convey water from above the well pad, and off the recently instaled pipeline, to below the well pad required maintenance at both the culvert inlet and outlet after recent precipitation events. If the pipeline is left without temporary stabilization and the culvert inlet and outlet are not addressed there is a potential for an erosion issue to develop with this specific area.

References