If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: | + | | License Date: 2012-07-25 |
|- | |- | ||
| Spud Date: 2012-11-26 | | Spud Date: 2012-11-26 |
Well ID: 34-031-27196 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.188550322,"lon":-82.14980173,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Coshocton | |
Municipality: Pike Township | |
Operator Name: MACKENCO INC | |
Well Pad ID: | |
Farm/Lease Name: HARRIS | |
License Status: Producing | |
License Date: 2012-07-25 | |
Spud Date: 2012-11-26 | |
Spud Drilling Contractor: WHEELER MICHAEL D | |
Final Drill Date: 2013-02-05 | |
Well Total Depth: 3262 ft | |
Configuration: Vertical | |
Latitude: 40.188550322 | |
Longitude: -82.14980173 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-07-25 | Proposed Formations:CLINTON, Issued Date:7/25/2012, Expired Date:7/25/2014 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2013-02-05 | |
Completion Report Received | 2013-06-05 | |
Correction to Well | 2013-07-26 | UNIT SIZE CHANGED TO 53.17 ACRES. |
Construction Permit Expires | 2014-07-25 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-05-13 | H2O | 0 | 60263 Gal | 30000 | Producers Service Corporation | No acid used. |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | MACKENCO INC | 0 | 686 | 180 |
2014 | MACKENCO INC | 0 | 784 | 365 |
2015 | MACKENCO INC | 0 | 461 | 365 |
2016 | MACKENCO INC | 0 | 231 | 365 |
2017 | MACKENCO INC | 0 | 232 | 365 |
2018 | MACKENCO INC | 0 | 27 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | MACKENCO INC | Brine | 390 | 180 |
2014 | MACKENCO INC | Brine | 110 | 365 |
2015 | MACKENCO INC | Brine | 76 | 365 |
2016 | MACKENCO INC | Brine | 27 | 365 |
2017 | MACKENCO INC | Brine | 26 | 365 |
2018 | MACKENCO INC | Brine | 27 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0239794866 | 2012-11-14 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Wheeler Drilling was rigged up and not drilling. The well was not spudded. The crew was making repairs to the drilling rig. No violations at this time. |
0487300464 | 2013-08-19 | Preliminary Restoration | No Violations | On the day of my inspection I found that the location was graded and planted with well established grassland vegetation. All drilling equipment and debris had been removed from the site. The well head was equipped with a pumping unit. There were no leaks or spills and there were no signs of erosion. This site passes preliminary restoration. |
0744429904 | 2013-02-04 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Wheeler Drilling was attempting to drill out the cement plug in the 5 casing. It was reported that the casing was cemented at 3208 with 30 sacks of class A cement. The permit was on location, the pit liner was in good shape and there were no leaks or spills. No violations at this time. |
0797786359 | 2013-01-08 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Wheeler Drilling was drilling with a 6.5 bit at a depth of 2310. The permit was on location,, the pit liner was in good shape and there were no leaks or spills. No violations at this time. |
1182381250 | 2012-12-03 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I found that Wheeler Drilling had set 36 of 10.75 drive pipe. They were drilling with a 10 bit at a depth of 200. The permit was displayed on the drilling rig, there were no sags or tears in the pit liner and there were no leaks or spills. No violations at this time. |
1355245287 | 2012-12-10 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Wheeler Drilling set the 8.625 casing at 558. Cemenco pumped 500 lbs gel, 100 lbs cotton seed hulls, and 110 sacks of class A cement. The cement was circulated to surface. The permit was on location and there were no leaks or spills. |
1355937018 | 2012-12-19 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Wheeler Drilling was drilling with a 6.5 bit at a depth of 1410. The permit was on location and there were no leaks or spills. No violations at this time. |
1357232295 | 2012-12-31 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Wheeler Drilling was not drilling. The drilling crew was not on location. There were no leaks or spills and there were no sags or tears in the pit liner. |
1358437286 | 2013-01-17 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Wheeler Drilling was drilling with a 6.5 bit at a depth of 2850. The permit was on location,, the pit liner was in good shape and there were no leaks or spills. No violations at this time. |
1368554778 | 2013-05-13 | Completion Testing | No Violations | On the day of my inspection Producers was hydraulically fracturing the well. There were no leaks or spills. See stimulation report for further detail. |
1778230459 | 2012-11-27 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Wheeler Drilling was in the process of landing their 10.75 drive pipe and spudding the well. The permit was displayed at the drilling rig, there were no leaks or spills and the pit liners were in good shape. No violations at this time. |
For data sources see[8]