If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: | + | | License Date: 2008-11-10 |
|- | |- | ||
| Spud Date: 2008-11-24 | | Spud Date: 2008-11-24 |
Well ID: 34-007-24501 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.887358674,"lon":-80.71478782,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashtabula | |
Municipality: Ashtabula | |
Operator Name: RMI TITANIUM COMPANY | |
Well Pad ID: | |
Farm/Lease Name: WHITE | |
License Status: Producing | |
License Date: 2008-11-10 | |
Spud Date: 2008-11-24 | |
Spud Drilling Contractor: H A D INC | |
Final Drill Date: 2008-12-02 | |
Well Total Depth: 3063 ft | |
Configuration: Vertical | |
Latitude: 41.887358674 | |
Longitude: -80.71478782 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-11-10 | Proposed Formations:CLINTON/MEDINA, Issued Date:11/10/2008, Expired Date:11/10/2009 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-12-02 | |
Completion Report Received | 2009-08-03 | |
Construction Permit Expires | 2009-11-10 | |
Correction to Well | 2009-11-13 | CORRECTION TO FOOTAGE, SHOULD BE "3080'SL & 430'EL OF LOT 25, CONNECTICUT WESTERN RESERVE LOTS". |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-10-15 | 2827 | 2917 | 18 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 54774 Gal | 30000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | RMI TITANIUM COMPANY | 301 | 0 | 29 |
2010 | RMI TITANIUM COMPANY | 6191 | 116 | 365 |
2011 | RMI TITANIUM COMPANY | 2539 | 119 | 0 |
2013 | RMI TITANIUM COMPANY | 2305 | 81 | 365 |
2014 | RMI TITANIUM COMPANY | 2548 | 48 | 365 |
2015 | RMI TITANIUM COMPANY | 2370 | 98 | 365 |
2016 | RMI TITANIUM COMPANY | 1991 | 106 | 365 |
2017 | RMI TITANIUM COMPANY | 2126 | 72 | 365 |
2018 | RMI TITANIUM COMPANY | 1958 | 30 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2009 | RMI TITANIUM COMPANY | Brine | 0 | 29 |
2010 | RMI TITANIUM COMPANY | Brine | 1395 | 365 |
2011 | RMI TITANIUM COMPANY | Brine | 820 | |
2013 | RMI TITANIUM COMPANY | Brine | 670 | 365 |
2014 | RMI TITANIUM COMPANY | Brine | 408 | 365 |
2015 | RMI TITANIUM COMPANY | Brine | 376 | 365 |
2016 | RMI TITANIUM COMPANY | Brine | 288 | 365 |
2017 | RMI TITANIUM COMPANY | Brine | 372 | 365 |
2018 | RMI TITANIUM COMPANY | Brine | 215 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1399937758 | 2009-10-26 | Preliminary Restoration | No Violations | no violations . |
For data sources see[9]