If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: 1993-07- | + | | License Date: 1993-07-23 |
|- | |- | ||
| Spud Date: 1993-08-03 | | Spud Date: 1993-08-03 |
Well ID: 34-099-22585 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.001494983,"lon":-80.67851961,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Boardman Township | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: BROWN EARL | |
License Status: Producing | |
License Date: 1993-07-23 | |
Spud Date: 1993-08-03 | |
Spud Drilling Contractor: J & J DIRECTIONAL SERVICE | |
Final Drill Date: 1993-08-11 | |
Well Total Depth: 5897 ft | |
Configuration: Directional | |
Latitude: 41.001494983 | |
Longitude: -80.67851961 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1993-07-23 | 84 EVERFLOW EASTERN PTNS L P GeoDate 7/23/93 |
Oil and Gas | 1993-07-23 | Issued Date 7/24/93 Expired Date 7/24/94 Acres 0040020 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05897 Proposed Drill Depth 05897 |
Original Spud | 1993-08-03 | CORR FTG 9-17-94 |
Completed | 1993-08-11 | CORR FTG 9-17-94 |
Reached Total Depth | 1993-08-11 | CORR FTG 9-17-94 |
Completion Report Received | 1993-08-25 | CORR FTG 9-17-94 |
Construction Permit Expires | 1994-07-24 | CORR FTG 9-17-94 |
Record Last Modified | 2017-02-15 | CORR FTG 9-17-94 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5613 | 5738 | 0 |
2006-09-11 | 5624 | 5694 | 66 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 120650 Gal | 80000 | 120,650 GAL H20 & 80M# SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0437355049 | 2009-06-17 | Production Wells | No Violations | I walked around the tank battery and the wellhead and found that there were no violations at this time. |
2124266031 | 2004-05-26 | Production Wells | No Violations | The tank battery is shared with permits: 2548 and 2845 and consists of 1-100 bbl storage tank, 1-50 bbl salt water tank, 3-separators a dike and a fence. |
iDIAN00212 | 1999-10-19 | Preliminary Restoration | No Violations |
For data sources see[9]