If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: 2002- | + | | License Date: 2002-04-15 |
|- | |- | ||
| Spud Date: 2002-06-27 | | Spud Date: 2002-06-27 |
Well ID: 34-099-22922 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.069256669,"lon":-80.68527193,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Youngstown | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: IDORA PARK UNIT | |
License Status: Producing | |
License Date: 2002-04-15 | |
Spud Date: 2002-06-27 | |
Spud Drilling Contractor: ROSE RUN DRILLING | |
Final Drill Date: 2002-07-04 | |
Well Total Depth: 5905 ft | |
Configuration: Directional | |
Latitude: 41.069256669 | |
Longitude: -80.68527193 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2002-04-15 | Proposed Formations:CLINTON, Issued Date:4/15/2002, Expired Date:4/15/2003 6:00:00 AM, Drilling unit acres:40.81, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2002-06-27 | RBDMS Rec |
Completed | 2002-07-04 | RBDMS Rec |
Reached Total Depth | 2002-07-04 | RBDMS Rec |
Completion Report Received | 2002-07-29 | RBDMS Rec |
Correction to Well | 2002-08-30 | CORRECTION TO TARGET INFORMATION: 2348'SL & 8815'WL OF TWP.; X= 2,501,995; Y= 515,554 (AS DRILLED SURVEY). |
Construction Permit Expires | 2003-04-15 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2002-08-23 | 5590 | 5664 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 2911 Bbl | 100000 | 1000 GALLONS HCL ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | EVERFLOW EASTERN PTNS L P | 1673 | 0 | 60 |
2003 | EVERFLOW EASTERN PTNS L P | 46856 | 0 | 365 |
2004 | EVERFLOW EASTERN PTNS L P | 19266 | 0 | 365 |
2005 | EVERFLOW EASTERN PTNS L P | 19317 | 0 | 365 |
2006 | EVERFLOW EASTERN PTNS L P | 16606 | 0 | 365 |
2007 | EVERFLOW EASTERN PTNS L P | 9354 | 0 | 365 |
2008 | EVERFLOW EASTERN PTNS L P | 13307 | 0 | 365 |
2009 | EVERFLOW EASTERN PTNS L P | 9100 | 0 | 365 |
2010 | EVERFLOW EASTERN PTNS L P | 11380 | 0 | 365 |
2011 | EVERFLOW EASTERN PTNS L P | 10639 | 0 | 365 |
2012 | EVERFLOW EASTERN PTNS L P | 8543 | 0 | 366 |
2013 | EVERFLOW EASTERN PTNS L P | 11900 | 0 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | 6364 | 0 | 275 |
2015 | EVERFLOW EASTERN PTNS L P | 6916 | 0 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | 1162 | 0 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | 4654 | 0 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | 3245 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2002 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 60 |
2003 | EVERFLOW EASTERN PTNS L P | Brine | 27 | 365 |
2004 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2005 | EVERFLOW EASTERN PTNS L P | Brine | 42 | 365 |
2006 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2007 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2008 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2009 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2010 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2011 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2012 | EVERFLOW EASTERN PTNS L P | Brine | 6 | 366 |
2013 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 275 |
2015 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000000682 | 2002-07-10 | Production Wells | No Violations | Pits are holding their contents. Drilling rig moved off. |
001216i976 | 2002-10-18 | Preliminary Restoration | No Violations | The well site is graded but no vegetation is established as yet. |
0067877480 | 2002-06-28 | Drill / Deepen / Reopen | No Violations | Set surface casing. See cement ticket for details. |
0089477683 | 2002-08-29 | Preliminary Restoration | No Violations | Pits are now closed. |
0165161468 | 2009-09-22 | Production Wells | No Violations | I walked around the tank battery and the wellhead and found that there were no violations at this time. |
1779298223 | 2003-06-04 | Preliminary Restoration | No Violations | Meets requirements for preliminary restoation. There is a dike. |
For data sources see[9]