If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: | + | | License Date: 2010-04-23 |
|- | |- | ||
| Spud Date: 2010-12-10 | | Spud Date: 2010-12-10 |
Well ID: 34-099-23096 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.044871668,"lon":-80.67066896,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Boardman Township | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: MILL CREEK CEMETERY UNIT | |
License Status: Producing | |
License Date: 2010-04-23 | |
Spud Date: 2010-12-10 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2010-12-18 | |
Well Total Depth: 6025 ft | |
Configuration: Directional | |
Latitude: 41.044871668 | |
Longitude: -80.67066896 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-08-08 | 84 EVERFLOW EASTERN PTNS L P Proposed Formation CLINTON Issued Date 8/8/2008 Expired Date 8/8/2009 6:00:00 AM |
APP | 2009-08-26 | Proposed Formations:CLINTON, Issued Date:8/26/2009, Expired Date:8/26/2010 6:00:00 AM, Drilling unit acres:40.69, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2010-04-23 | Proposed Formations:CLINTON, Issued Date:4/23/2010, Expired Date:4/23/2011 6:00:00 AM, Drilling unit acres:40.69, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2010-12-18 | |
Completion Report Received | 2011-01-18 | |
Correction to Well | 2011-02-07 | CORRECTION TO TARGET INFORMATION (FROM AS DRILLED SURVEY); FOOTAGE= 930'SL & 910'WL OF LOT 3, DIVISION 3 (N); X= 2,504, 940 AND Y= 508, 900. |
Construction Permit Expires | 2011-04-23 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-03-04 | 5646 | 5726 | 106 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2010-12-29 | H2O | 15 | 2926 Bbl | 80000 | Universal Well Services Inc. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | EVERFLOW EASTERN PTNS L P | 16786 | 0 | 197 |
2012 | EVERFLOW EASTERN PTNS L P | 25630 | 0 | 366 |
2013 | EVERFLOW EASTERN PTNS L P | 10396 | 5 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | 8457 | 5 | 245 |
2015 | EVERFLOW EASTERN PTNS L P | 741 | 0 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | 295 | 0 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | 3384 | 0 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | 6804 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | EVERFLOW EASTERN PTNS L P | Brine | 81 | 197 |
2012 | EVERFLOW EASTERN PTNS L P | Brine | 3 | 366 |
2013 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | Brine | 4 | 245 |
2015 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | Brine | 2 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0038618300 | 2011-01-28 | UrbanPreliminary Restoration | No Violations | The chain link fence is around the wellhead with an ID sign posted. The existing tank battery is already fenced with a ID sign posted. There were no violations at this time. |
0363140289 | 2011-03-29 | UrbanPreliminary Restoration | No Violations | I met with George Strawn(Everflow Eastern), SeanSean McGuire-Urban Conservationist Mahoning SWCD,Anna Mamone (Boardman Zoning Inspector) . Also present was the supervisor of the Mill Creek Commentary and inspector Chris Grimm. We all were in agreement to take some of the dirt on the west side of the drilling location and bank the side so that the dirt erosion would be minimal. George will start on this work tomorrow, 3/30/33. This complaint continues. |
0671217824 | 2010-12-17 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Wildcat rig #1. The drilling depth was 5140. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
0709331937 | 2010-12-16 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Wildcat rig #1. The drilling depth was 4330. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
0726896761 | 2011-01-05 | UrbanPreliminary Restoration | No Violations | The drilling pits are closed. The frac tanks gone. The top soil is spread in a rough grade. There were no violations at this time. |
0750621489 | 2010-12-14 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Wildcat rig #1. The depth was 3137 and on air. Heavy snow. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
0825757090 | 2012-01-27 | UrbanProduction Wells | No Violations | I conducted a status check on this site and found that the well head was fenced with chain link and it is equipped with a plunger lift system. The tank battery consists of one 100 barrel stock tank and six separators. There was no brine storage tank. The thief hatch was closed and there was a bull plug installed in the draw valve. The tank battery was fenced with chain link and the dike was free of vegetation and debris. The tank battery is shared with permits 2619, 2742, 2200, 2777, 2536 and 2666. Proper identification was posted. I found no leaks or spills at the well head or the tank battery. I took new GPS coordinates of the well head and tank battery. No violations at this time. |
1172289659 | 2010-12-15 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Wildcat rig #1. The drilling depth was 3714. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
1225276271 | 2010-12-29 | UrbanPreliminary Restoration | No Violations | I witnessed the fracing of the Clinton zone. Universal preformed the frac with Tom Wood as the Everflow Eastern representative. The Clinton zone broke down at 1465psi. The average rate was 46 BPM with the average pressure of 2200psi. The ISIP was 953psi. The 5 minute reading was 884psi. There were no violations at this time. |
1292270568 | 2010-12-13 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Wildcat rig 1. The rig crew had the drill pipe out of the hole and ready to make a motor run for the directional start. Heavy snow. The drilling depth was 1996 on air. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
1292850324 | 2010-12-19 | Drill / Deepen / Reopen | No Violations | I witnessed the cementing of the 4 1/2 casing. Full circulation throughout the cement job. There were no violations at this time. |
1293728562 | 2010-12-30 | UrbanPreliminary Restoration | No Violations | I partially witnessed Everflow solidify the drilling pits. There were no violations at this time. |
1301423849 | 2011-03-24 | UrbanPreliminary Restoration | No Violations | I received a phone call from Sean McGuire-Urban Conservationist Mahoning SWCD (330) 740-7995 about some dirt that is close to a creek. The top soil was spread last December around the drilling location. I told Sean that I would call George Strawn from Everflow Eastern about getting the creek area cleaned up. I would meet him next week. I was on vacation. I called George Strawn(330-727-1614) about this matter. He went out to inspect the area and called me back. The dirt had not ran into the creek. I asked George if we could meet next Tuesday, 3/29/11. I emailed Sean about this meeting. He will bring Anna Mamone (Boardman Zoning Inspector) to the meeting on Tuesday. This complaint continues. |
1392598558 | 2011-08-04 | Preliminary Restoration | No Violations | Chain link fencing installed around well head and tank battery. ID sign posted. Top soil graded out, vegetation well established. All drilling equipment removed from site. This well site satisfies ORC 1509.072. Preliminary restoration passed. No violations at this time. |
1772578005 | 2011-04-28 | UrbanPreliminary Restoration | No Violations | Vegetation growth is on the drilling location area. The pits are closed. The debris is hauled off. This well PASSES PRELIMINARY RESTORATION. |
1800321125 | 2010-12-20 | UrbanPreliminary Restoration | No Violations | Part of the drilling rig is still on the drilling location. The fluid level in the drilling pits are down 3 feet. There were no violations at this time. |
1834035707 | 2010-12-19 | Drill / Deepen / Reopen | No Violations | I performed a rig inspection on Wildcat rig #1. MTD was 6025. The crew were finishing running into the hole with the 4 1/2 casing. This inspection satisfies 1501:9-9-03. There were no violations at this time. |
1885441797 | 2011-04-04 | UrbanPreliminary Restoration | No Violations | I inspected the drilling location area and found the area seeded, strawed and a silt fence placed on the northwest to the north side of the drilling location. This complaint is resolved. |
2001153478 | 2011-03-30 | UrbanPreliminary Restoration | No Violations | I inspected the progress on the area. Dans Excavation Service were taking out the tree stumps and dirt from the creek bank. The dirt will be sloped so there will be no debris going into the creek. This complaint continues. |
2041612697 | 2011-03-31 | UrbanPreliminary Restoration | No Violations | Everflow Eastern have spread grass seed and were in the process of spreading straw on the drilling location area. This complaint continues. |
For data sources see[9]