X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-103-25045"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-103-25045
 
| Well ID: 34-103-25045
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.03044686, -81.87220856 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.030391866, -81.87234818 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Medina County, Ohio|Medina]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 
|-
 
|-
| Operator Name: [[BLEACH TECH LLC]]
+
| County: [[Medina_County,_Ohio|Medina]]
 +
|-
 +
| Municipality: [[Guilford_Township,_Medina_County,_Ohio|Guilford Township]]
 +
|-
 +
| Operator Name: [[BLEACHTECH LLC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: BLEACHTECH (SMP #2)
 
|-
 
|-
| First Permit Date:  
+
| License Status: Active Injection
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2014-01-28
 
|-
 
|-
 
| Spud Date: 2014-03-17
 
| Spud Date: 2014-03-17
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[POULSON DRILLING]]
 
|-
 
|-
| Configuration: Vertical
+
| Final Drill Date:  
 
|-
 
|-
| Well Status: Active Injection
+
| Well Total Depth: 2630 ft
 
|-
 
|-
| Violations: 0
+
| Configuration: Vertical
|-
 
| Latitude: 41.03044686
 
 
|-
 
|-
| Longitude: -81.87220856
+
| Latitude: 41.030391866
 
|-
 
|-
 +
| Longitude: -81.87234818
 
|}
 
|}
== Inspection Data ==
+
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Well Status
!scope="col" | DATE
+
!scope="col" style="width: 15%;text-align: center"| Well Status Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Comment
!scope="col" | COMMENT
+
|-
!scope="col" | VIOLATION ID
+
| APP
!scope="col" | VIOLATION CODE
+
| 2014-01-28
!scope="col" | VIOLATION COMMENT
+
| Proposed Formations:SALINA F1 SALT, Issued Date:1/28/2014, Expired Date:1/28/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
 
|-
 
|-
| 1074224962
+
| Last Compliance Report
| 2014-03-06
+
| 2014-04-16
 
|  
 
|  
| Visited location on 03/06/2014 for conductor casing cement job.  The rig drilled a 20 hole to 197', and ran 16, 65# conductor casing to 178'.  Rigged up Petroset to cement casing to surface.  Cement job went well; 15 bbls good cement returns to surface.
+
|-
 +
| Completion Report Received
 +
| 2014-04-23
 
|  
 
|  
 +
|-
 +
| Construction Permit Expires
 +
| 2016-01-28
 
|  
 
|  
 +
|-
 +
| Record Last Modified
 +
| 2018-11-30
 
|  
 
|  
 
|-
 
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
|}-->
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 
|-
 
|-
| -1143384001
+
|}-->
| 2014-03-24
+
<!--==== Fluid Composition Data ====
|  
+
{| class="wikitable sortable" style="width: 100%"
| Visited location on 03/24/2014 to witness the production casing cement job for the Bleachtech #11 well.  An 11 hole was drilled to 2,440', and 8 5/8, 32#, New casing was run to 2,397'.  Well was cemented to surface using 650 sxs of Class A cement with 2% gel and 6# gilsonite by Petroset Cementing Services.  Cement job went well, and circulation was maintained throughout the job.  28 bbls of good cement returns were seen at surface.  MIT Test was performed on the production casing.  500# was added to well after landing the plug and held for 15 minutes; no noticeable pressure was lost during test, so MIT test passed.  Plan forward is to wait on cement, then drill out to TD.
+
!scope="col" style="text-align: center"| Job Number
|  
+
!scope="col" style="text-align: center"| Trade Name
|  
+
!scope="col" style="text-align: center"| Supplier
|  
+
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 
|-
 
|-
 +
|}-->
 +
<!--== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
| -2088289401
+
|}-->
| 2014-03-17
+
<!--== Production Data ==
|  
+
{| class="wikitable sortable" width="95%"
| Visited location on 03/17/2014 to witness the conductor casing cement job for the Bleachtech #11 well.  A 20 hole was drilled to 180', and 16, 65#, New conductor casing was run to 168'.  The well was cemented to surface with 200 sxs of Class A cement with 3% CaCl by Petroset Cementing Services.  The cement job went well and good circulation was maintained throughout the job.  15 bbls of good cement returns were seen at surface.  Plan forward is to wait on cement, then drill out the surface hole.
+
!scope="col" style="text-align: center"| Period
|  
+
!scope="col" style="text-align: center"| Operator Name
|  
+
!scope="col" style="text-align: center"| Gas Quantity (mcf)
|  
+
!scope="col" style="text-align: center"| Oil Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
 +
|}-->
 +
<!--== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 
|-
 
|-
| -230676482
+
|}-->
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Inspection Date
 +
!scope="col" style="text-align: center"| Inspection Type
 +
!scope="col" style="text-align: center"| Inspection Result
 +
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| 0230676482
 
| 2014-04-02
 
| 2014-04-02
|  
+
| Drill / Deepen /  Reopen
| Visited location on 04/02/2014 to top off wells with a mixture of mortar, quick-crete, and Portland cement.  Cement had fallen approximately 4' - 8' on all casing strings.  Mixture was hand-mixed on location and dumped down the annulus and filled up to surface.
+
| No Violations
|
+
| Visited location on 04/02/2014 to top off wells with a mixture of mortar, quick-crete, and Portland cement.  Cement had fallen approximately 4 - 8 on all casing strings.  Mixture was hand-mixed on location and dumped down the annulus and filled up to surface.
|
 
|
 
|-
 
 
|-
 
|-
| -424819458
+
| 0424819458
 
| 2014-10-23
 
| 2014-10-23
|  
+
| Preliminary Restoration
 +
| No Violations
 
| Visited location on 10/23/2014 to check on the restoration status of the well.  The well is equipped for production; well identification is clearly displayed next to the wellhead.  All pits have been closed and drilling equipment removed.  Preliminary Restoration passes.
 
| Visited location on 10/23/2014 to check on the restoration status of the well.  The well is equipped for production; well identification is clearly displayed next to the wellhead.  All pits have been closed and drilling equipment removed.  Preliminary Restoration passes.
|
 
|
 
|
 
|-
 
 
|-
 
|-
| 486588604
+
| 0486588604
 
| 2014-03-19
 
| 2014-03-19
|  
+
| Drill / Deepen /  Reopen
| Visited location on 03/19/2014 to witness the surface casing cement job for the Bleachtech #11 well.  An 11 3/4 hole was drilled to 660', and 11 3/4, 32#, New surface casing was run to 630'.  Well was cemented to surface using 360 sxs of Class A cement with 3% CaCl by Petroset Cementing Services.  The cement job went well, and circulation was maintained throughout the job.  15 bbls of good cement returns were seen at surface.  Plan forward is to wait on cement, then drill out production hole.
+
| No Violations
|
+
| Visited location on 03/19/2014 to witness the surface casing cement job for the Bleachtech #11 well.  An 11 3/4 hole was drilled to 660, and 11 3/4, 32#, New surface casing was run to 630.  Well was cemented to surface using 360 sxs of Class A cement with 3% CaCl by Petroset Cementing Services.  The cement job went well, and circulation was maintained throughout the job.  15 bbls of good cement returns were seen at surface.  Plan forward is to wait on cement, then drill out production hole.
|
 
|
 
 
|-
 
|-
 +
| 0534980249
 +
| 2017-05-18
 +
| Solution Mining Project
 +
| No Violations
 +
| Inspected well on 05/18/2017 with Inspector Steve Ochs at the request of Andrew Adgate to confirm the well status.  The well has been placed into production, and well identification is clearly displayed.  The well status (AI) is correct.  No problems were noted at the time of the inspection.
 
|-
 
|-
| 603571178
+
| 0603571178
 
| 2014-04-03
 
| 2014-04-03
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Visited location on 04/03/2014 to witness logging job on the Bleachtech #11 well.  The hole was loaded on 04/02/2014 with pit water (note:  drilling operations had been completed the previous week, so solids in pit had settled out and water was taken from top of pit).  Appalachian Well Services rigged up and logged the well.  The logging tool was run without centralizers, as they were damaged on the previous run.  This caused the collar locating tool to not work properly, but the VDL tool was not effected.  The cement bond on the 8 5/8 casing looked excellent throughout the entire length of the string.
 
| Visited location on 04/03/2014 to witness logging job on the Bleachtech #11 well.  The hole was loaded on 04/02/2014 with pit water (note:  drilling operations had been completed the previous week, so solids in pit had settled out and water was taken from top of pit).  Appalachian Well Services rigged up and logged the well.  The logging tool was run without centralizers, as they were damaged on the previous run.  This caused the collar locating tool to not work properly, but the VDL tool was not effected.  The cement bond on the 8 5/8 casing looked excellent throughout the entire length of the string.
|  
+
|-
|  
+
| 1074224962
|  
+
| 2014-03-06
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Visited location on 03/06/2014 for conductor casing cement job.  The rig drilled a 20 hole to 197, and ran 16, 65# conductor casing to 178.  Rigged up Petroset to cement casing to surface.  Cement job went well; 15 bbls good cement returns to surface.
 +
|-
 +
| 1143384001
 +
| 2014-03-24
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Visited location on 03/24/2014 to witness the production casing cement job for the Bleachtech #11 well.  An 11 hole was drilled to 2,440, and 8 5/8, 32#, New casing was run to 2,397.  Well was cemented to surface using 650 sxs of Class A cement with 2% gel and 6# gilsonite by Petroset Cementing Services.  Cement job went well, and circulation was maintained throughout the job.  28 bbls of good cement returns were seen at surface.  MIT Test was performed on the production casing.  500# was added to well after landing the plug and held for 15 minutes; no noticeable pressure was lost during test, so MIT test passed.  Plan forward is to wait on cement, then drill out to TD.
 +
|-
 +
| 1192843155
 +
| 2017-12-01
 +
| Solution Mining Project
 +
| No Violations
 +
| I found the injection well in operation on the day of my inspection.  There is an identification sign displayed on a steel post next to the well.  There are no problems noted at this time.
 +
|-
 +
| 1363272517
 +
| 2018-03-30
 +
| Solution Mining Project
 +
| No Violations
 +
| I found the injection well in operation on the day of my inspection.  There is calcification build-up on the injection line fittings.  I observed no leaks or spills around the well.  There is an identification sign displayed on a steel post next to the well.  There are no problems noted at this time.
 +
|-
 +
| 1543584386
 +
| 2018-11-29
 +
| Solution Mining Project
 +
| No Violations
 +
| I was on location to witness a Mechanical Integrity Test (MIT).  After eight (8) hours the average test well pressure was 215.227 psi and the average reference well pressure was 23.046 with a difference of 192.181 psi.  The calculated net pressure change resulted in 0.001 psi/hr., which is well below the maximum net pressure change of 0.05 psi/hr.  MIT passed.
 +
|-
 +
| 2088289401
 +
| 2014-03-17
 +
| Drill / Deepen /  Reopen
 +
| No Violations
 +
| Visited location on 03/17/2014 to witness the conductor casing cement job for the Bleachtech #11 well.  A 20 hole was drilled to 180, and 16, 65#, New conductor casing was run to 168.  The well was cemented to surface with 200 sxs of Class A cement with 3% CaCl by Petroset Cementing Services.  The cement job went well and good circulation was maintained throughout the job.  15 bbls of good cement returns were seen at surface.  Plan forward is to wait on cement, then drill out the surface hole.
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 18:03, 30 July 2019

Well Details

Well ID: 34-103-25045
Loading map...
Country: United States
State: Ohio
County: Medina
Municipality: Guilford Township
Operator Name: BLEACHTECH LLC
Well Pad ID:
Farm/Lease Name: BLEACHTECH (SMP #2)
License Status: Active Injection
License Date: 2014-01-28
Spud Date: 2014-03-17
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date:
Well Total Depth: 2630 ft
Configuration: Vertical
Latitude: 41.030391866
Longitude: -81.87234818

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-01-28 Proposed Formations:SALINA F1 SALT, Issued Date:1/28/2014, Expired Date:1/28/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
Last Compliance Report 2014-04-16
Completion Report Received 2014-04-23
Construction Permit Expires 2016-01-28
Record Last Modified 2018-11-30

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0230676482 2014-04-02 Drill / Deepen / Reopen No Violations Visited location on 04/02/2014 to top off wells with a mixture of mortar, quick-crete, and Portland cement. Cement had fallen approximately 4 - 8 on all casing strings. Mixture was hand-mixed on location and dumped down the annulus and filled up to surface.
0424819458 2014-10-23 Preliminary Restoration No Violations Visited location on 10/23/2014 to check on the restoration status of the well. The well is equipped for production; well identification is clearly displayed next to the wellhead. All pits have been closed and drilling equipment removed. Preliminary Restoration passes.
0486588604 2014-03-19 Drill / Deepen / Reopen No Violations Visited location on 03/19/2014 to witness the surface casing cement job for the Bleachtech #11 well. An 11 3/4 hole was drilled to 660, and 11 3/4, 32#, New surface casing was run to 630. Well was cemented to surface using 360 sxs of Class A cement with 3% CaCl by Petroset Cementing Services. The cement job went well, and circulation was maintained throughout the job. 15 bbls of good cement returns were seen at surface. Plan forward is to wait on cement, then drill out production hole.
0534980249 2017-05-18 Solution Mining Project No Violations Inspected well on 05/18/2017 with Inspector Steve Ochs at the request of Andrew Adgate to confirm the well status. The well has been placed into production, and well identification is clearly displayed. The well status (AI) is correct. No problems were noted at the time of the inspection.
0603571178 2014-04-03 Drill / Deepen / Reopen No Violations Visited location on 04/03/2014 to witness logging job on the Bleachtech #11 well. The hole was loaded on 04/02/2014 with pit water (note: drilling operations had been completed the previous week, so solids in pit had settled out and water was taken from top of pit). Appalachian Well Services rigged up and logged the well. The logging tool was run without centralizers, as they were damaged on the previous run. This caused the collar locating tool to not work properly, but the VDL tool was not effected. The cement bond on the 8 5/8 casing looked excellent throughout the entire length of the string.
1074224962 2014-03-06 Drill / Deepen / Reopen No Violations Visited location on 03/06/2014 for conductor casing cement job. The rig drilled a 20 hole to 197, and ran 16, 65# conductor casing to 178. Rigged up Petroset to cement casing to surface. Cement job went well; 15 bbls good cement returns to surface.
1143384001 2014-03-24 Drill / Deepen / Reopen No Violations Visited location on 03/24/2014 to witness the production casing cement job for the Bleachtech #11 well. An 11 hole was drilled to 2,440, and 8 5/8, 32#, New casing was run to 2,397. Well was cemented to surface using 650 sxs of Class A cement with 2% gel and 6# gilsonite by Petroset Cementing Services. Cement job went well, and circulation was maintained throughout the job. 28 bbls of good cement returns were seen at surface. MIT Test was performed on the production casing. 500# was added to well after landing the plug and held for 15 minutes; no noticeable pressure was lost during test, so MIT test passed. Plan forward is to wait on cement, then drill out to TD.
1192843155 2017-12-01 Solution Mining Project No Violations I found the injection well in operation on the day of my inspection. There is an identification sign displayed on a steel post next to the well. There are no problems noted at this time.
1363272517 2018-03-30 Solution Mining Project No Violations I found the injection well in operation on the day of my inspection. There is calcification build-up on the injection line fittings. I observed no leaks or spills around the well. There is an identification sign displayed on a steel post next to the well. There are no problems noted at this time.
1543584386 2018-11-29 Solution Mining Project No Violations I was on location to witness a Mechanical Integrity Test (MIT). After eight (8) hours the average test well pressure was 215.227 psi and the average reference well pressure was 23.046 with a difference of 192.181 psi. The calculated net pressure change resulted in 0.001 psi/hr., which is well below the maximum net pressure change of 0.05 psi/hr. MIT passed.
2088289401 2014-03-17 Drill / Deepen / Reopen No Violations Visited location on 03/17/2014 to witness the conductor casing cement job for the Bleachtech #11 well. A 20 hole was drilled to 180, and 16, 65#, New conductor casing was run to 168. The well was cemented to surface with 200 sxs of Class A cement with 3% CaCl by Petroset Cementing Services. The cement job went well and good circulation was maintained throughout the job. 15 bbls of good cement returns were seen at surface. Plan forward is to wait on cement, then drill out the surface hole.

For data sources see[3]

References