X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-139-20765"

m
m
Line 1: Line 1:
__TOC__
+
__TOC__
 
== Well Details ==
 
== Well Details ==
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-139-20765
 
| Well ID: 34-139-20765
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.58148036, -82.46922172 | width=100% | height=100% }}  
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.581420586, -82.46933465 | width=100% | height=100% }}
 
|-
 
|-
| County: [[Richland County, Ohio|Richland]]
+
| Country: United States
 
|-
 
|-
| Municipality:  
+
| State: Ohio
 +
|-
 +
| County: [[Richland_County,_Ohio|Richland]]
 +
|-
 +
| Municipality: [[Jefferson_Township,_Richland_County,_Ohio|Jefferson Township]]
 
|-
 
|-
 
| Operator Name: [[BI JOE DEVELOPMENT INC]]
 
| Operator Name: [[BI JOE DEVELOPMENT INC]]
Line 13: Line 17:
 
| Well Pad ID:  
 
| Well Pad ID:  
 
|-
 
|-
| Farm/Lease Name:  
+
| Farm/Lease Name: BLUE WING
 
|-
 
|-
| First Permit Date:  
+
| License Status: Producing
 
|-
 
|-
| Last Permit Date:  
+
| License Date: 2014-06-02
 
|-
 
|-
 
| Spud Date: 2014-07-24
 
| Spud Date: 2014-07-24
 
|-
 
|-
| Unconventional: No
+
| Spud Drilling Contractor: [[MARIC DRILLING CO.]]
 +
|-
 +
| Final Drill Date: 2014-08-02
 +
|-
 +
| Well Total Depth: 4615 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Well Status: Producing
+
| Latitude: 40.581420586
 +
|-
 +
| Longitude: -82.46933465
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Well Status
 +
!scope="col" style="width: 15%;text-align: center"| Well Status Date
 +
!scope="col" style="text-align: center"| Comment
 +
|-
 +
| APP
 +
| 2014-06-02
 +
| Proposed Formations:TRENTON THRU TREMPEALEAU, Issued Date:6/2/2014, Expired Date:6/1/2016 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
 +
|-
 +
| Reached Total Depth
 +
| 2014-08-02
 +
|
 +
|-
 +
| Completion Report Received
 +
| 2014-09-03
 +
|
 +
|-
 +
| Construction Permit Expires
 +
| 2016-06-01
 +
|
 +
|-
 +
| Record Last Modified
 +
| 2017-10-24
 +
|
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Well and WellHistry Tables
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Perforation Treatments ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Perforation Date
 +
!scope="col" style="text-align: center"| Interval Top (ft)
 +
!scope="col" style="text-align: center"| Interval Base (ft)
 +
!scope="col" style="text-align: center"| Number of Shots
 +
|-
 +
| 2014-09-04
 +
| style="text-align: right;" | 4476
 +
| style="text-align: right;" | 4494
 +
| style="text-align: right;" | 19
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Perfs Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Job Start Date
 +
!scope="col" style="text-align: center"| Job End Date
 +
!scope="col" style="text-align: center"| True Vertical Depth (ft)
 +
!scope="col" style="text-align: center"| Total Water Volume (gal)
 +
!scope="col" style="text-align: center"| Total Non-Water Volume (gal)
 
|-
 
|-
| Violations: 0
+
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" style="width: 100%"
 +
!scope="col" style="text-align: center"| Job Number
 +
!scope="col" style="text-align: center"| Trade Name
 +
!scope="col" style="text-align: center"| Supplier
 +
!scope="col" style="text-align: center"| Purpose
 +
!scope="col" style="text-align: center"| Ingredient Name
 +
!scope="col" style="white-space: nowrap;text-align: center"| CAS Number
 +
!scope="col" style="text-align: center"| Additive Percentage by Mass
 +
!scope="col" style="text-align: center"| Job Percentage by Mass
 +
!scope="col" style="text-align: center"| Mass Used (lb)
 
|-
 
|-
| Latitude: 40.58148036
+
|}-->
 +
== Stimulations Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Stimulation Date
 +
!scope="col" style="text-align: center"| Chemical Agent
 +
!scope="col" style="text-align: center"| Chemical Agent Concentration (%)
 +
!scope="col" style="text-align: center"| Fracking Fluid Volume
 +
!scope="col" style="text-align: center"| Mass of Proppant Used (lb)
 +
!scope="col" style="text-align: center"| Fracking Company
 +
!scope="col" style="text-align: center"| Comments
 
|-
 
|-
| Longitude: -82.46922172
+
| 2014-08-13
 +
| ACID
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 4852 Gal
 +
| style="text-align: right;" | 0
 +
| [[Producers Service Corporation]]
 +
| The operator acidized the well with Hydrochloric acid.  No issues were noted.  The well was flowed back following the job.
 
|-
 
|-
 
|}
 
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - tblStimulation Table
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | PERIOD
+
!scope="col" style="text-align: center"| Period
!scope="col" | GAS QUANTITY
+
!scope="col" style="text-align: center"| Operator Name
!scope="col" | GAS PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Gas Quantity (mcf)
!scope="col" | CONDENSATE QUANTITY
+
!scope="col" style="text-align: center"| Oil Quantity (bbl)
!scope="col" | CONDENSATE PRODUCTION DAYS
+
!scope="col" style="text-align: center"| Production Days
!scope="col" | OIL QUANTITY
 
!scope="col" | OIL PRODUCTION DAYS
 
 
|-
 
|-
| 2014-0
 
| style="text-align:right;" | 456.0
 
| style="text-align:right;" | 125.0
 
 
|  
 
|  
 
|  
 
|  
| style="text-align:right;" | 1027.0
+
| style="text-align: right;" | 0
| style="text-align:right;" | 125.0
+
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2014
 +
| [[BI JOE DEVELOPMENT INC]]
 +
| style="text-align: right;" | 456
 +
| style="text-align: right;" | 1027
 +
| style="text-align: right;" | 125
 +
|-
 +
| 2015
 +
| [[BI JOE DEVELOPMENT INC]]
 +
| style="text-align: right;" | 1345
 +
| style="text-align: right;" | 1575
 +
| style="text-align: right;" | 125
 +
|-
 +
| 2016
 +
| [[BI JOE DEVELOPMENT INC]]
 +
| style="text-align: right;" | 1033
 +
| style="text-align: right;" | 1193
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2017
 +
| [[BI JOE DEVELOPMENT INC]]
 +
| style="text-align: right;" | 808
 +
| style="text-align: right;" | 1007
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[BI JOE DEVELOPMENT INC]]
 +
| style="text-align: right;" | 711
 +
| style="text-align: right;" | 981
 +
| style="text-align: right;" | 365
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Risk Based Data Management System - Production Table - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date =  2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Oil and Gas Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
| date = 2019-05-07
 +
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable"
 +
!scope="col" style="text-align: center"| Period
 +
!scope="col" style="text-align: center"| Operator Name
 +
!scope="col" style="text-align: center"| Waste Type
 +
!scope="col" style="text-align: center"| Quantity (bbl)
 +
!scope="col" style="text-align: center"| Production Days
 +
|-
 +
| 2014
 +
| [[BI JOE DEVELOPMENT INC]]
 +
| Brine
 +
| style="text-align: right;" | 145
 +
| style="text-align: right;" | 125
 +
|-
 +
| 2015
 +
| [[BI JOE DEVELOPMENT INC]]
 +
| Brine
 +
| style="text-align: right;" | 385
 +
| style="text-align: right;" | 125
 +
|-
 +
| 2016
 +
| [[BI JOE DEVELOPMENT INC]]
 +
| Brine
 +
| style="text-align: right;" | 296
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2017
 +
| [[BI JOE DEVELOPMENT INC]]
 +
| Brine
 +
| style="text-align: right;" | 245
 +
| style="text-align: right;" | 365
 +
|-
 +
| 2018
 +
| [[BI JOE DEVELOPMENT INC]]
 +
| Brine
 +
| style="text-align: right;" | 130
 +
| style="text-align: right;" | 365
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - Production Table - Brine Data
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
|publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date =  2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Production
+
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
| accessdate = 2019-05-21 }}</ref>
 +
<ref>{{cite web
 +
| title = Combined Production - Brine Data
 +
|publisher = [[Ohio Department of Natural Resources]]
 +
  | date = 2019-05-07
 +
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 +
  | accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 +
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | INSPECTION ID
+
!scope="col" style="text-align: center"| Inspection ID
!scope="col" | DATE
+
!scope="col" style="text-align: center"| Inspection Date
!scope="col" | DESCRIPTION
+
!scope="col" style="text-align: center"| Inspection Type
!scope="col" | COMMENT
+
!scope="col" style="text-align: center"| Inspection Result
!scope="col" | VIOLATION ID
+
!scope="col" style="text-align: center"| Inspection Comments
!scope="col" | VIOLATION CODE
+
|-
!scope="col" | VIOLATION COMMENT
+
| 0464673372
 +
| 2016-05-02
 +
| Production Wells
 +
| No Violations
 +
| The well is equipped with a pump jack, rods and tubing and is in production.  There are 2-200 barrel tanks and a separator in the tank battery.  Identification is posted at the tanks.
 +
|-
 +
| 0569776170
 +
| 2018-03-01
 +
| Production Wells
 +
| No Violations
 +
| The well is equipped with a pump jack, rods and tubing and is in production.  There are 2-200 barrel tanks and a separator in the tank battery.  ID is posted at the tanks.
 
|-
 
|-
 
| 1074242046
 
| 1074242046
 
| 2014-07-23
 
| 2014-07-23
|  
+
| Surface Facility Construction
 +
| No Violations
 
| Maric Drilling and R&B Enterprises are building the pad and pits in preparation for drilling.  The well location is staked.  Coordinates will be taken when the rig starts drilling.
 
| Maric Drilling and R&B Enterprises are building the pad and pits in preparation for drilling.  The well location is staked.  Coordinates will be taken when the rig starts drilling.
|
 
|
 
|
 
 
|-
 
|-
|-
+
| 1083129471
| -1083129471
 
 
| 2014-08-18
 
| 2014-08-18
|  
+
| Preliminary Restoration
 +
| No Violations
 
| The pits have been closed and a pump jack is installed on the well.  The operator has constructed the tank battery.  Restoration of the location will be done following flow line installation.
 
| The pits have been closed and a pump jack is installed on the well.  The operator has constructed the tank battery.  Restoration of the location will be done following flow line installation.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1234170912
 
| 1234170912
 
| 2014-08-08
 
| 2014-08-08
|  
+
| Preliminary Restoration
 +
| No Violations
 
| The operator requested inspection to witness pit closure.  R&B enterprises closed pits and was grading the location.  Fluid was hauled out.  The pits were not solidified due to their location in the woods.
 
| The operator requested inspection to witness pit closure.  R&B enterprises closed pits and was grading the location.  Fluid was hauled out.  The pits were not solidified due to their location in the woods.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1283453550
 
| 1283453550
 
| 2015-04-01
 
| 2015-04-01
|  
+
| Production Wells
 +
| No Violations
 
| The well is equipped with a pump jack, rods and tubing and is in production.  There are 2-200 Bbl tanks in the tank battery and a separator.  The location is vegetated and stable.  Preliminary restoration is approved.  The stuffing box leaked oil and paraffin and has been repaired.  The operator has absorbent pads at the wellhead which need to be removed.  There is a sump around the well head that has contained the fluid.  Water in the sump registered below detectable limits for chloride on a Quantab test strip.  ID posted at the tanks.
 
| The well is equipped with a pump jack, rods and tubing and is in production.  There are 2-200 Bbl tanks in the tank battery and a separator.  The location is vegetated and stable.  Preliminary restoration is approved.  The stuffing box leaked oil and paraffin and has been repaired.  The operator has absorbent pads at the wellhead which need to be removed.  There is a sump around the well head that has contained the fluid.  Water in the sump registered below detectable limits for chloride on a Quantab test strip.  ID posted at the tanks.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1396666451
 
| 1396666451
 
| 2014-08-25
 
| 2014-08-25
|  
+
| Preliminary Restoration
 +
| No Violations
 
| The operator needs to complete finish grading and vegetation of the well site.  Tanks have been painted and ID is posted.  Pits are closed and the location is rough graded.  There is a pump jack on the well.
 
| The operator needs to complete finish grading and vegetation of the well site.  Tanks have been painted and ID is posted.  Pits are closed and the location is rough graded.  There is a pump jack on the well.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1406551931
 
| 1406551931
 
| 2014-07-25
 
| 2014-07-25
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Maric Drilling requested an inspection to witness surface casing cement.  See the casing ticket for details.
 
| Maric Drilling requested an inspection to witness surface casing cement.  See the casing ticket for details.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1407170247
 
| 1407170247
 
| 2014-08-04
 
| 2014-08-04
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Drilling was completed on Saturday, 8/2/14.  The production casing was cemented by Universal Well Services.  The job was not witnessed.  Maric Drilling is moving to the next location.
 
| Drilling was completed on Saturday, 8/2/14.  The production casing was cemented by Universal Well Services.  The job was not witnessed.  Maric Drilling is moving to the next location.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1409930820
 
| 1409930820
 
| 2014-09-05
 
| 2014-09-05
|  
+
| Preliminary Restoration
 +
| No Violations
 
| The site is finish graded, seeded and mulched.  Vegetation is establishing on the disturbed area.  The preliminary restoration is approved.
 
| The site is finish graded, seeded and mulched.  Vegetation is establishing on the disturbed area.  The preliminary restoration is approved.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1895148500
 
| 1895148500
 
| 2014-08-13
 
| 2014-08-13
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| The operator conducted an acidization of the well.  See the stimulation report for details.
 
| The operator conducted an acidization of the well.  See the stimulation report for details.
|
 
|
 
|
 
|-
 
 
|-
 
|-
 
| 1996703426
 
| 1996703426
 
| 2014-07-29
 
| 2014-07-29
|  
+
| Drill / Deepen /  Reopen
 +
| No Violations
 
| Maric Drilling is drilling on fluid at 3000 ft.
 
| Maric Drilling is drilling on fluid at 3000 ft.
|
 
|
 
|
 
 
|-
 
|-
 
|}
 
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" style="text-align: center"| Inspection ID
 +
!scope="col" style="text-align: center"| Violation ID
 +
!scope="col" style="text-align: center"| Violation Date
 +
!scope="col" style="text-align: center"| Violation Code
 +
!scope="col" style="text-align: center"| Violation Comments
 +
|-
 +
|}-->
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title = Ohio Department of Natural Resources RBDMS
+
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
  | publisher = [http://oilandgas.ohiodnr.gov/]
+
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2015-06-19
+
  | date = 2019-05-07
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources#Inspection
+
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2015-06-20 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
== References ==
+
==References==
{{reflist}}
+
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Wells]]
+
[[Category:Ohio Wells]]

Revision as of 06:01, 31 July 2019

Well Details

Well ID: 34-139-20765
Loading map...
Country: United States
State: Ohio
County: Richland
Municipality: Jefferson Township
Operator Name: BI JOE DEVELOPMENT INC
Well Pad ID:
Farm/Lease Name: BLUE WING
License Status: Producing
License Date: 2014-06-02
Spud Date: 2014-07-24
Spud Drilling Contractor: MARIC DRILLING CO.
Final Drill Date: 2014-08-02
Well Total Depth: 4615 ft
Configuration: Vertical
Latitude: 40.581420586
Longitude: -82.46933465

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-06-02 Proposed Formations:TRENTON THRU TREMPEALEAU, Issued Date:6/2/2014, Expired Date:6/1/2016 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-08-02
Completion Report Received 2014-09-03
Construction Permit Expires 2016-06-01
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2014-09-04 4476 4494 19

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-08-13 ACID 0 4852 Gal 0 Producers Service Corporation The operator acidized the well with Hydrochloric acid. No issues were noted. The well was flowed back following the job.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
0 0 0
2014 BI JOE DEVELOPMENT INC 456 1027 125
2015 BI JOE DEVELOPMENT INC 1345 1575 125
2016 BI JOE DEVELOPMENT INC 1033 1193 365
2017 BI JOE DEVELOPMENT INC 808 1007 365
2018 BI JOE DEVELOPMENT INC 711 981 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 BI JOE DEVELOPMENT INC Brine 145 125
2015 BI JOE DEVELOPMENT INC Brine 385 125
2016 BI JOE DEVELOPMENT INC Brine 296 365
2017 BI JOE DEVELOPMENT INC Brine 245 365
2018 BI JOE DEVELOPMENT INC Brine 130 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0464673372 2016-05-02 Production Wells No Violations The well is equipped with a pump jack, rods and tubing and is in production. There are 2-200 barrel tanks and a separator in the tank battery. Identification is posted at the tanks.
0569776170 2018-03-01 Production Wells No Violations The well is equipped with a pump jack, rods and tubing and is in production. There are 2-200 barrel tanks and a separator in the tank battery. ID is posted at the tanks.
1074242046 2014-07-23 Surface Facility Construction No Violations Maric Drilling and R&B Enterprises are building the pad and pits in preparation for drilling. The well location is staked. Coordinates will be taken when the rig starts drilling.
1083129471 2014-08-18 Preliminary Restoration No Violations The pits have been closed and a pump jack is installed on the well. The operator has constructed the tank battery. Restoration of the location will be done following flow line installation.
1234170912 2014-08-08 Preliminary Restoration No Violations The operator requested inspection to witness pit closure. R&B enterprises closed pits and was grading the location. Fluid was hauled out. The pits were not solidified due to their location in the woods.
1283453550 2015-04-01 Production Wells No Violations The well is equipped with a pump jack, rods and tubing and is in production. There are 2-200 Bbl tanks in the tank battery and a separator. The location is vegetated and stable. Preliminary restoration is approved. The stuffing box leaked oil and paraffin and has been repaired. The operator has absorbent pads at the wellhead which need to be removed. There is a sump around the well head that has contained the fluid. Water in the sump registered below detectable limits for chloride on a Quantab test strip. ID posted at the tanks.
1396666451 2014-08-25 Preliminary Restoration No Violations The operator needs to complete finish grading and vegetation of the well site. Tanks have been painted and ID is posted. Pits are closed and the location is rough graded. There is a pump jack on the well.
1406551931 2014-07-25 Drill / Deepen / Reopen No Violations Maric Drilling requested an inspection to witness surface casing cement. See the casing ticket for details.
1407170247 2014-08-04 Drill / Deepen / Reopen No Violations Drilling was completed on Saturday, 8/2/14. The production casing was cemented by Universal Well Services. The job was not witnessed. Maric Drilling is moving to the next location.
1409930820 2014-09-05 Preliminary Restoration No Violations The site is finish graded, seeded and mulched. Vegetation is establishing on the disturbed area. The preliminary restoration is approved.
1895148500 2014-08-13 Drill / Deepen / Reopen No Violations The operator conducted an acidization of the well. See the stimulation report for details.
1996703426 2014-07-29 Drill / Deepen / Reopen No Violations Maric Drilling is drilling on fluid at 3000 ft.

For data sources see[9]

References