If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-063-36529 | | Well ID: 37-063-36529 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.499068, -79.336099 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 13: | Line 13: | ||
| Municipality: [[Conemaugh Township,_Indiana_County,_Pennsylvania|Conemaugh Township]] | | Municipality: [[Conemaugh Township,_Indiana_County,_Pennsylvania|Conemaugh Township]] | ||
|- | |- | ||
− | | Operator Name: [[ALLIANCE | + | | Operator Name: [[ALLIANCE PETRO CO LLC]] |
|- | |- | ||
| Well Pad ID: | | Well Pad ID: | ||
Line 21: | Line 21: | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
− | | Spud Date: 08 | + | | Spud Date: 2009-08-25 |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2009-04-24 |
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
Line 49: | Line 49: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 65: | Line 90: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2010 | | 2010 | ||
Line 74: | Line 99: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2011 | | 2011 | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2012 | | 2012 | ||
Line 92: | Line 117: | ||
| style="text-align: right;" | 366 | | style="text-align: right;" | 366 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2013 | | 2013 | ||
Line 101: | Line 126: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2014 | | 2014 | ||
Line 110: | Line 135: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2015 | | 2015 | ||
Line 119: | Line 144: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2016 | | 2016 | ||
Line 128: | Line 153: | ||
| style="text-align: right;" | 366 | | style="text-align: right;" | 366 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2017 | | 2017 | ||
Line 137: | Line 162: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2018 | | 2018 | ||
Line 146: | Line 171: | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
|} | |} | ||
Line 165: | Line 190: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2009- | + | | 2009-A00 |
| Brine | | Brine | ||
| style="text-align: right;" | 145.00 Bbl | | style="text-align: right;" | 145.00 Bbl | ||
Line 171: | Line 196: | ||
| PA0091472 | | PA0091472 | ||
|- | |- | ||
− | | 2009- | + | | 2009-A00 |
| Drilling | | Drilling | ||
| style="text-align: right;" | 300.00 Bbl | | style="text-align: right;" | 300.00 Bbl | ||
Line 177: | Line 202: | ||
| PA0091472 | | PA0091472 | ||
|- | |- | ||
− | | 2009- | + | | 2009-A00 |
| Drilling | | Drilling | ||
| style="text-align: right;" | 700.00 Bbl | | style="text-align: right;" | 700.00 Bbl | ||
Line 183: | Line 208: | ||
| 37-063-36676 | | 37-063-36676 | ||
|- | |- | ||
− | | 2009- | + | | 2009-A00 |
| Fracking Fluid | | Fracking Fluid | ||
| style="text-align: right;" | 880.00 Bbl | | style="text-align: right;" | 880.00 Bbl | ||
Line 189: | Line 214: | ||
| PA0091472 | | PA0091472 | ||
|- | |- | ||
− | | 2009- | + | | 2009-A00 |
| Fracking Fluid | | Fracking Fluid | ||
| style="text-align: right;" | 500.00 Bbl | | style="text-align: right;" | 500.00 Bbl | ||
Line 195: | Line 220: | ||
| PA0095443 | | PA0095443 | ||
|- | |- | ||
− | | 2010- | + | | 2010-A00 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 80.00 Bbl | | style="text-align: right;" | 80.00 Bbl | ||
Line 201: | Line 226: | ||
| PA0091472 | | PA0091472 | ||
|- | |- | ||
− | | 2010- | + | | 2010-A00 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 75.00 Bbl | | style="text-align: right;" | 75.00 Bbl | ||
Line 207: | Line 232: | ||
| PA0095273 | | PA0095273 | ||
|- | |- | ||
− | | 2011- | + | | 2011-A00 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 32.00 Bbl | | style="text-align: right;" | 32.00 Bbl | ||
Line 213: | Line 238: | ||
| PA0095273 | | PA0095273 | ||
|- | |- | ||
− | | 2012- | + | | 2012-A00 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 4.45 Bbl | | style="text-align: right;" | 4.45 Bbl | ||
Line 219: | Line 244: | ||
| 34-007-22038 | | 34-007-22038 | ||
|- | |- | ||
− | | 2012- | + | | 2012-A00 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 42.70 Bbl | | style="text-align: right;" | 42.70 Bbl | ||
Line 225: | Line 250: | ||
| 34-013-20609 | | 34-013-20609 | ||
|- | |- | ||
− | | 2014- | + | | 2014-A00 |
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 33.09 Bbl | | style="text-align: right;" | 33.09 Bbl | ||
Line 250: | Line 275: | ||
| 1822400 | | 1822400 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2009-08-20 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 257: | Line 282: | ||
| 1824637 | | 1824637 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2009-08-27 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
Line 264: | Line 289: | ||
| 1824652 | | 1824652 | ||
| Primary Facility | | Primary Facility | ||
− | | 08 | + | | 2009-08-19 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 271: | Line 296: | ||
| 1833239 | | 1833239 | ||
| Primary Facility | | Primary Facility | ||
− | | 09 | + | | 2009-09-30 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 278: | Line 303: | ||
| 1925531 | | 1925531 | ||
| Primary Facility | | Primary Facility | ||
− | | 11 | + | | 2010-11-03 |
| Site Restoration | | Site Restoration | ||
| No Violations Noted | | No Violations Noted | ||
Line 313: | Line 338: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-063-36529 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.499068,"lon":-79.336099,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Indiana | |
Municipality: Conemaugh Township | |
Operator Name: ALLIANCE PETRO CO LLC | |
Well Pad ID: | |
Farm/Lease Name: J S MARSHALL 6 | |
License Status: Active | |
Spud Date: 2009-08-25 | |
Permit Date: 2009-04-24 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 40.499068 | |
Longitude: -79.336099 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | DOMINION EXPLORATION & PROD INC | 6,173.20 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | CONSOL GAS CO | 15,042.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | |
2012 | CNX GAS CO LLC | 8,419.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2013 | CNX GAS CO LLC | 7,366.63 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | CNX GAS CO LLC | 5,506.72 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | CNX GAS CO LLC | 5,523.98 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | CNX GAS CO LLC | 5,416.35 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CNX GAS CO LLC | 3,947.15 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CNX GAS CO LLC | 3,752.46 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2009-A00 | Brine | 145.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009-A00 | Drilling | 300.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009-A00 | Drilling | 700.00 Bbl | Other | 37-063-36676 |
2009-A00 | Fracking Fluid | 880.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0091472 |
2009-A00 | Fracking Fluid | 500.00 Bbl | Brine or Industrial Waste Treatment Plt | PA0095443 |
2010-A00 | Produced Fluid (in Barrels) | 80.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2010-A00 | Produced Fluid (in Barrels) | 75.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2011-A00 | Produced Fluid (in Barrels) | 32.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2012-A00 | Produced Fluid (in Barrels) | 4.45 Bbl | INJECTION DISPOSAL WELL | 34-007-22038 |
2012-A00 | Produced Fluid (in Barrels) | 42.70 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2014-A00 | Produced Fluid (in Barrels) | 33.09 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1822400 | Primary Facility | 2009-08-20 | Routine/Complete Inspection | No Violations Noted | The silt fence located beside the access road has been overtopped with stone. The fence should be addressed to reduce the risk of off-site transportation of sediment. Well is in pre-drill phase. The operator should also place some silt fence around the top soil stockpile or temporarily seed and mulch it. The operator should continue to monito the access road and well site for erosion and sedimentation until final restoration activities are completed. |
1824637 | Primary Facility | 2009-08-27 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S or IW issues at the site. Pit aligned with 20 mil plastic and no freeboard issues. Falcon drilling currently at 2850¿. Falcon set 13¿ conductor pipe at 43¿ and 7¿ at 1231¿and used 160 sks class A cement. Water noted at 395¿. TD expected at 3675¿. Well sign and E&S plan located at the entrance way of site. |
1824652 | Primary Facility | 2009-08-19 | Routine/Complete Inspection | No Violations Noted | Well pad was currently being constructed. Well site marked with a stake. E&S issues constructed. Pit aligned with 20 mil plastic. Called the DEP WQ personnel for assistances at the site. Water not draining from the access road. No drainage area along the road and entrance way had not collection are or drainage area. Water lying in front of access road and mud on the road coming from this well site. |
1833239 | Primary Facility | 2009-09-30 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, the well was drilled. The brine tank was in sound condition, surrounded by a dike. Pits were in good condition with fluids removed; plans are to solidify pit upon approval. Access road was in stable condition with functioning BMP¿s (ie. filter fence). No accelerated erosion or sedimentation was observed in relation to the site or access road. Noted a 6 inch field ditch with pipe was being installed to the left hand side of the access road. |
1925531 | Primary Facility | 2010-11-03 | Site Restoration | No Violations Noted | At the time of inspection, well drilled and in production. Site adequately and uniformly restored with >70% vegetative growth, site had been regraded to preexisting contours and land uses. No accelerated erosion or sedimentations issues were noted. Acces road stable. Brine tank sound surrounded by dike. Observed a large pile of rock onsite in front of well, appears operator may use in roadway ditches. |
For data sources see[6]