X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-36529"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-36529
 
| Well ID: 37-063-36529
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.499068, -79.336099 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.499068, -79.336099 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 13: Line 13:
 
| Municipality: [[Conemaugh Township,_Indiana_County,_Pennsylvania|Conemaugh Township]]
 
| Municipality: [[Conemaugh Township,_Indiana_County,_Pennsylvania|Conemaugh Township]]
 
|-
 
|-
| Operator Name: [[ALLIANCE PETROLEUM CO LLC]]
+
| Operator Name: [[ALLIANCE PETRO CO LLC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 08/25/2009
+
| Spud Date: 2009-08-25
 
|-
 
|-
| Permit Date: 4/24/2009
+
| Permit Date: 2009-04-24
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 74: Line 99:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 92: Line 117:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 119: Line 144:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 128: Line 153:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 137: Line 162:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 146: Line 171:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 165: Line 190:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2009-0
+
| 2009-A00
 
| Brine
 
| Brine
 
| style="text-align: right;" | 145.00 Bbl
 
| style="text-align: right;" | 145.00 Bbl
Line 171: Line 196:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2009-0
+
| 2009-A00
 
| Drilling
 
| Drilling
 
| style="text-align: right;" | 300.00 Bbl
 
| style="text-align: right;" | 300.00 Bbl
Line 177: Line 202:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2009-0
+
| 2009-A00
 
| Drilling
 
| Drilling
 
| style="text-align: right;" | 700.00 Bbl
 
| style="text-align: right;" | 700.00 Bbl
Line 183: Line 208:
 
| 37-063-36676
 
| 37-063-36676
 
|-
 
|-
| 2009-0
+
| 2009-A00
 
| Fracking Fluid
 
| Fracking Fluid
 
| style="text-align: right;" | 880.00 Bbl
 
| style="text-align: right;" | 880.00 Bbl
Line 189: Line 214:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2009-0
+
| 2009-A00
 
| Fracking Fluid
 
| Fracking Fluid
 
| style="text-align: right;" | 500.00 Bbl
 
| style="text-align: right;" | 500.00 Bbl
Line 195: Line 220:
 
| PA0095443
 
| PA0095443
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
Line 201: Line 226:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 75.00 Bbl
 
| style="text-align: right;" | 75.00 Bbl
Line 207: Line 232:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 32.00 Bbl
 
| style="text-align: right;" | 32.00 Bbl
Line 213: Line 238:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 4.45 Bbl
 
| style="text-align: right;" | 4.45 Bbl
Line 219: Line 244:
 
| 34-007-22038
 
| 34-007-22038
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 42.70 Bbl
 
| style="text-align: right;" | 42.70 Bbl
Line 225: Line 250:
 
| 34-013-20609
 
| 34-013-20609
 
|-
 
|-
| 2014-0
+
| 2014-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 33.09 Bbl
 
| style="text-align: right;" | 33.09 Bbl
Line 250: Line 275:
 
| 1822400
 
| 1822400
 
| Primary Facility
 
| Primary Facility
| 08/20/2009
+
| 2009-08-20
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 257: Line 282:
 
| 1824637
 
| 1824637
 
| Primary Facility
 
| Primary Facility
| 08/27/2009
+
| 2009-08-27
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 264: Line 289:
 
| 1824652
 
| 1824652
 
| Primary Facility
 
| Primary Facility
| 08/19/2009
+
| 2009-08-19
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 271: Line 296:
 
| 1833239
 
| 1833239
 
| Primary Facility
 
| Primary Facility
| 09/30/2009
+
| 2009-09-30
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 278: Line 303:
 
| 1925531
 
| 1925531
 
| Primary Facility
 
| Primary Facility
| 11/03/2010
+
| 2010-11-03
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 313: Line 338:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 02:58, 1 August 2019

Well Details

Well ID: 37-063-36529
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: Conemaugh Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: J S MARSHALL 6
License Status: Active
Spud Date: 2009-08-25
Permit Date: 2009-04-24
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.499068
Longitude: -79.336099

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 DOMINION EXPLORATION & PROD INC 6,173.20 365 0.00 0 0.00 0
2010 CONSOL GAS CO 15,042.00 365 0.00 0 0.00 0
2011 0.00 0 0.00 0 0.00 0
2012 CNX GAS CO LLC 8,419.00 366 0.00 0 0.00 0
2013 CNX GAS CO LLC 7,366.63 365 0.00 0 0.00 0
2014 CNX GAS CO LLC 5,506.72 365 0.00 0 0.00 0
2015 CNX GAS CO LLC 5,523.98 365 0.00 0 0.00 0
2016 CNX GAS CO LLC 5,416.35 366 0.00 0 0.00 0
2017 CNX GAS CO LLC 3,947.15 365 0.00 0 0.00 0
2018 CNX GAS CO LLC 3,752.46 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2009-A00 Brine 145.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009-A00 Drilling 300.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009-A00 Drilling 700.00 Bbl Other 37-063-36676
2009-A00 Fracking Fluid 880.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2009-A00 Fracking Fluid 500.00 Bbl Brine or Industrial Waste Treatment Plt PA0095443
2010-A00 Produced Fluid (in Barrels) 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-A00 Produced Fluid (in Barrels) 75.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011-A00 Produced Fluid (in Barrels) 32.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012-A00 Produced Fluid (in Barrels) 4.45 Bbl INJECTION DISPOSAL WELL 34-007-22038
2012-A00 Produced Fluid (in Barrels) 42.70 Bbl INJECTION DISPOSAL WELL 34-013-20609
2014-A00 Produced Fluid (in Barrels) 33.09 Bbl INJECTION DISPOSAL WELL 34-013-20609

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1822400 Primary Facility 2009-08-20 Routine/Complete Inspection No Violations Noted The silt fence located beside the access road has been overtopped with stone. The fence should be addressed to reduce the risk of off-site transportation of sediment. Well is in pre-drill phase. The operator should also place some silt fence around the top soil stockpile or temporarily seed and mulch it. The operator should continue to monito the access road and well site for erosion and sedimentation until final restoration activities are completed.
1824637 Primary Facility 2009-08-27 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW issues at the site. Pit aligned with 20 mil plastic and no freeboard issues. Falcon drilling currently at 2850¿. Falcon set 13¿ conductor pipe at 43¿ and 7¿ at 1231¿and used 160 sks class A cement. Water noted at 395¿. TD expected at 3675¿. Well sign and E&S plan located at the entrance way of site.
1824652 Primary Facility 2009-08-19 Routine/Complete Inspection No Violations Noted Well pad was currently being constructed. Well site marked with a stake. E&S issues constructed. Pit aligned with 20 mil plastic. Called the DEP WQ personnel for assistances at the site. Water not draining from the access road. No drainage area along the road and entrance way had not collection are or drainage area. Water lying in front of access road and mud on the road coming from this well site.
1833239 Primary Facility 2009-09-30 Routine/Complete Inspection No Violations Noted At the time of inspection, the well was drilled. The brine tank was in sound condition, surrounded by a dike. Pits were in good condition with fluids removed; plans are to solidify pit upon approval. Access road was in stable condition with functioning BMP¿s (ie. filter fence). No accelerated erosion or sedimentation was observed in relation to the site or access road. Noted a 6 inch field ditch with pipe was being installed to the left hand side of the access road.
1925531 Primary Facility 2010-11-03 Site Restoration No Violations Noted At the time of inspection, well drilled and in production. Site adequately and uniformly restored with >70% vegetative growth, site had been regraded to preexisting contours and land uses. No accelerated erosion or sedimentations issues were noted. Acces road stable. Brine tank sound surrounded by dike. Observed a large pile of rock onsite in front of well, appears operator may use in roadway ditches.

For data sources see[6]

References