X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-063-36968"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-063-36968
 
| Well ID: 37-063-36968
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.446575, -79.130194 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.446575, -79.130194 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 12/08/2010
+
| Spud Date: 2010-12-08
 
|-
 
|-
| Permit Date: 10/28/2010
+
| Permit Date: 2010-10-28
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 74: Line 99:
 
| style="text-align: right;" | 184
 
| style="text-align: right;" | 184
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 83: Line 108:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 119: Line 144:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 128: Line 153:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 137: Line 162:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 156: Line 181:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 240.00 Bbl
 
| style="text-align: right;" | 240.00 Bbl
Line 162: Line 187:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 675.00 Bbl
 
| style="text-align: right;" | 675.00 Bbl
Line 168: Line 193:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2013-0
+
| 2013-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 385.00 Bbl
 
| style="text-align: right;" | 385.00 Bbl
Line 174: Line 199:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2014-0
+
| 2014-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 190.00 Bbl
 
| style="text-align: right;" | 190.00 Bbl
Line 180: Line 205:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2014-0
+
| 2014-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 155.00 Bbl
 
| style="text-align: right;" | 155.00 Bbl
Line 186: Line 211:
 
|  
 
|  
 
|-
 
|-
| 2016-0
+
| 2016-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 70.00 Bbl
 
| style="text-align: right;" | 70.00 Bbl
Line 192: Line 217:
 
|  
 
|  
 
|-
 
|-
| 2018-0
+
| 2018-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
Line 217: Line 242:
 
| 1920376
 
| 1920376
 
| Primary Facility
 
| Primary Facility
| 10/18/2010
+
| 2010-10-18
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| In Compliance with Policy
 
| In Compliance with Policy
Line 224: Line 249:
 
| 1933030
 
| 1933030
 
| Primary Facility
 
| Primary Facility
| 12/09/2010
+
| 2010-12-09
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 231: Line 256:
 
| 1934189
 
| 1934189
 
| Primary Facility
 
| Primary Facility
| 12/14/2010
+
| 2010-12-14
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 238: Line 263:
 
| 1939897
 
| 1939897
 
| Primary Facility
 
| Primary Facility
| 12/20/2010
+
| 2010-12-20
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 245: Line 270:
 
| 1955571
 
| 1955571
 
| Primary Facility
 
| Primary Facility
| 03/08/2011
+
| 2011-03-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 252: Line 277:
 
| 2026132
 
| 2026132
 
| Primary Facility
 
| Primary Facility
| 12/13/2011
+
| 2011-12-13
 
| Site Restoration
 
| Site Restoration
 
| No Violations Noted
 
| No Violations Noted
Line 259: Line 284:
 
| 2041480
 
| 2041480
 
| Primary Facility
 
| Primary Facility
| 02/07/2012
+
| 2012-02-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 266: Line 291:
 
| 2256953
 
| 2256953
 
| Primary Facility
 
| Primary Facility
| 03/21/2014
+
| 2014-03-21
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 322: Line 347:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 03:32, 1 August 2019

Well Details

Well ID: 37-063-36968
Loading map...
Country: United States
State: Pennsylvania
County: Indiana
Municipality: West Wheatfield Township
Operator Name: PENN VIEW EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: ALLEN LIVING TRUST 1
License Status: Active
Spud Date: 2010-12-08
Permit Date: 2010-10-28
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.446575
Longitude: -79.130194

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 0.00 0 0.00 0 0.00 0
2011 PENN VIEW EXPLORATION CORP 2,928.43 184 0.00 0 0.00 0
2012 PENN VIEW EXPLORATION CORP 8,543.00 365 0.00 0 0.00 0
2013 PENN VIEW EXPLORATION CORP 5,315.00 365 0.00 0 0.00 0
2014 PENN VIEW EXPLORATION CORP 3,680.00 365 0.00 0 0.00 0
2015 PENN VIEW EXPLORATION CORP 2,748.00 365 0.00 0 0.00 0
2016 PENN VIEW EXPLORATION CORP 2,049.00 365 0.00 0 0.00 0
2017 PENN VIEW EXPLORATION CORP 2,208.00 365 0.00 0 0.00 0
2018 PENN VIEW EXPLORATION CORP 1,641.00 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-A00 Produced Fluid (in Barrels) 240.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2012-A00 Produced Fluid (in Barrels) 675.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2013-A00 Produced Fluid (in Barrels) 385.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2014-A00 Produced Fluid (in Barrels) 190.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2014-A00 Produced Fluid (in Barrels) 155.00 Bbl ROAD SPREADING
2016-A00 Produced Fluid (in Barrels) RWC 802 70.00 Bbl ROAD SPREADING
2018-A00 Produced Fluid (in Barrels) RWC 802 100.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1920376 Primary Facility 2010-10-18 Routine/Complete Inspection In Compliance with Policy This inspection is in response to an OG -57 waiver submitted by the operator to construct a well <200ft from a stream, wetland, and/or body of water. Reviewed ES Plan. Well staked and approximately 147¿ from closest point of intermittent stream (UNT to Conemaugh River). Operator should implement and maintain all bmps to ensure protection of the stream and associated lands. It was also noted in plan that operator had plans to encapsulate drill cuttings, but under 78.62(a)(7) in order to encapsulate the pit must be >200ft from a stream, body of water, or wetland. An alternate method of disposal is recommended, but in order to encapsulate pit must be >200ft away from closest point of stream. Operator is also investigating the solidification process. Possible relocation of access road was also discussed in order to limit the amount of disturbance and to relocate the access road further from stream; operator must first discuss with surface owner and then notify dept of final decision. Waiver approved with above comments
1933030 Primary Facility 2010-12-09 Drilling/Alteration No Violations Noted According to records, permit granted 10/12/10. Currently, PC Rig #3 contracted by Penn View. Filter fence located topographically down gradient of site pad. Pit was covered with 20 ml plastic. Permit present. No freeboard issues. Conductor pipe (13 3/8¿) set to 40 ft (sanded). Due to elevated water issues, PC going to set 9 5/8¿ pipe at 252 ft. Current depth was 250 ft.. Stratigraphy consisted of shale, sandstone, and limestone. Water recorded at 190 ft. During site inspection, no E&S or IW issues at the site.
1934189 Primary Facility 2010-12-14 Drilling/Alteration No Violations Noted At the time of inspection, no E&S and IW issues. PNG contracted Union to complete storage well. Inspected site. Union set 20¿ conductor to 42 ft. and 13 3/8¿ pipe to 144 ft. 9 5/8¿ pipe surface casing was set at 1960 ft. Current depth was at 7988 ft (located in the chert zone). PNG revised TD to 8200 ft. Filter fence was installed. Pit covered with 20 mil plastic with discharge line from rig to pit secured with cement blocks. No freeboard issues
1939897 Primary Facility 2010-12-20 Routine/Complete Inspection No Violations Noted At the time of this inspection, site properly signed with ES plan. Waiver on distance to a stream was granted, with conditions on 10/18/10. Well drilled, but not equipped for production. Access road stable and moved according from original plans with dept approval. Bmp¿s installed and functioning according to plan. Recommend operator continue to routinely monitor and maintain through spring thaw and until final restoration activities are completed. One below grade pit onsite, lined with adequate freeboard. Awaiting operator response on final disposal method chosen for pit contents. Accompanied by WQS Marc Maestra.
1955571 Primary Facility 2011-03-08 Routine/Complete Inspection No Violations Noted *Waiver Site*- At the time of inspection, well drill in production. Well tag present. Brine tank ok. Temporary bmp¿s installed and functioning according to plan. Site has not yet been seeded/mulched, but pit(s) have been reclaimed as dept recommended that pits were reclaimed as soon as possible due to proximity to the stream. Minor ES issues were noted with access road. It is recommended that the operator add additional rock to ensure stability of roadway, as well as to crown roadway to ensure water from culvert pipe flows along rocked culvert, which may need additional rock to prevent a possible pollution event to the nearby stream and springs. No accelerated erosion or sedimentation issues were noted on site. Now IW issues. Operator should continue to closely monitor and maintain all bmp¿s until final restoration is completed (within 9 months of drilling completion).
2026132 Primary Facility 2011-12-13 Site Restoration No Violations Noted *Waiver Site* Well spudded 12/08/10. Drilling completed 12/14/10. Well drilled, equipped, and in production. Well tag present. Brine tank appears structurally sound. Access road stable. Temporary bmp's in place, maintained, and functioning as outlined in ES plan. No accelerated erosion or sedimentation issues noted. Approximately 70% vegetative covered observed in previously disturbed areas; therefore, well site appears restored. Department recommends operator seed and mulch in the spring to ensure uniform vegetative cover is maintained, especially along cut slope. No violations noted at the time of this inspection.
2041480 Primary Facility 2012-02-07 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was in production.
2256953 Primary Facility 2014-03-21 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was in production
2493018 Primary Facility 2016-06-14 Routine/Complete Inspection No Violations Noted no issues. system running
2512610 Primary Facility 2016-08-16 Routine/Complete Inspection No Violations Noted system running. no issues
2556965 Primary Facility 2017-01-24 Routine/Complete Inspection No Violations Noted no issues. system running

For data sources see[6]

References