X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-24837"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-24837
 
| Well ID: 37-129-24837
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.456127, -79.412888 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.456127, -79.412888 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 13: Line 13:
 
| Municipality: [[Loyalhanna Township,_Westmoreland_County,_Pennsylvania|Loyalhanna Township]]
 
| Municipality: [[Loyalhanna Township,_Westmoreland_County,_Pennsylvania|Loyalhanna Township]]
 
|-
 
|-
| Operator Name: [[ALLIANCE PETROLEUM CO LLC]]
+
| Operator Name: [[ALLIANCE PETRO CO LLC]]
 
|-
 
|-
 
| Well Pad ID:  
 
| Well Pad ID:  
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 10/04/2002
+
| Spud Date: 2002-10-04
 
|-
 
|-
| Permit Date: 9/5/2002
+
| Permit Date: 2002-09-05
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2003
 
| 2003
Line 76: Line 101:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
Line 83: Line 108:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 110: Line 135:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 121: Line 146:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 128: Line 153:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 146: Line 171:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 155: Line 180:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 164: Line 189:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 173: Line 198:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 182: Line 207:
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 191: Line 216:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 200: Line 225:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 298: Line 323:
 
| 1174441
 
| 1174441
 
| Primary Facility
 
| Primary Facility
| 10/08/2002
+
| 2002-10-08
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 410: Line 435:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 06:51, 1 August 2019

Well Details

Well ID: 37-129-24837
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Loyalhanna Township
Operator Name: ALLIANCE PETRO CO LLC
Well Pad ID:
Farm/Lease Name: A STINE 7
License Status: Active
Spud Date: 2002-10-04
Permit Date: 2002-09-05
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.456127
Longitude: -79.412888

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2002 DOMINION EXPLORATION & PROD INC 6,722.00 365 0.00 0 0.00 0
2003 DOMINION EXPLORATION & PROD INC 28,582.00 365 178.20 365 0.00 0
2005 DOMINION EXPLORATION & PROD INC 8,984.00 365 0.00 0 0.00 0
2006 DOMINION EXPLORATION & PROD INC 7,844.00 365 0.00 0 0.00 0
2007 DOMINION EXPLORATION & PROD INC 7,083.00 365 0.00 0 0.00 0
2008 DOMINION EXPLORATION & PROD INC 6,581.00 365 0.00 0 0.00 0
2009 DOMINION EXPLORATION & PROD INC 6,102.00 365 30.26 365 0.00 0
2010 CONSOL GAS CO 5,434.00 365 0.00 0 0.00 0
2011 0.00 0 0.00 0 0.00 0
2012 CNX GAS CO LLC 4,579.00 366 0.00 0 0.00 0
2013 CNX GAS CO LLC 4,201.55 365 0.00 0 0.00 0
2014 CNX GAS CO LLC 3,106.42 365 0.00 0 0.00 0
2015 CNX GAS CO LLC 3,454.74 365 0.00 0 0.00 0
2016 CNX GAS CO LLC 2,972.80 366 0.00 0 0.00 0
2017 CNX GAS CO LLC 3,697.68 365 0.00 0 0.00 0
2018 CNX GAS CO LLC 2,155.66 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2002-A00 Brine 25.00 Bbl Brine or Industrial Waste Treatment Plt
2002-A00 Drilling 290.00 Bbl Brine or Industrial Waste Treatment Plt
2002-A00 Fracking Fluid 2,200.00 Bbl Brine or Industrial Waste Treatment Plt
2003-A00 Brine 42.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2003-A00 Brine 20.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2005-A00 Brine 40.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2008-A00 Brine 36.00 Bbl Brine or Industrial Waste Treatment Plt PA0095273
2010-A00 Produced Fluid (in Barrels) 40.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2013-A00 Produced Fluid (in Barrels) 35.39 Bbl INJECTION DISPOSAL WELL 34-013-20609
2017-A00 Produced Fluid (in Barrels) RWC 802 20.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-10

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1174441 Primary Facility 2002-10-08 Drilling/Alteration No Violations Noted Well spudded by Whipstock Drilling Co., rig # 9, on 10/4/02. Running 6 1/4" to drill at 1387'. I. D., pit ( 10 ml), E & S, ok.
2585706 Primary Facility 2017-04-20 Incident- Response to Accident or Event Violation(s) Noted On 4/20/2017@9:45 Operator discovered a 6bbl oily brine production fluid spill. Operator reported this to the Department on 4/20/2017@11:25 (CTS ID 326356).

On 4/20/2017@12:10 Department contacted Operator (Spencer Johnson) who stated that spill was caused by the cattle breaking through the fenced well site and compromising the line and valve from production equipment to brine tank. Spill contained to earthen dike and clean-up was being mobilized.

On 4/20/2017@12:30 Department performed inspection. During the inspection, no active leaking was observed, Department able to visually confirm the reported oily brine spill. The spill appears to be contained to within the earthen dike. At the time of inspection, clean-up work had not commenced and no containment measures surrounding the impacted area was observed. Department spoke with Operator (Spencer) to recommend Operator perform cleanup in accordance with Spill Policy and to request Operator test for all constituents of brine and petroleum hydrocarbons. D

2588331 Primary Facility 2017-04-26 Follow-up Inspection Outstanding Violations - Viols Req'd Inspection performed as a follow up to inspection ID 2585706. At the time of inspection clean up appears to have commenced. Impacted area has been excavated and backfilled with gravel. No E&S issues. Department recommends Operator continue to perform routine monitoring and maintenance to ensure clean up in accordance with spill policy and forward sample test results upon receipt.

Previously issued violation remains outstanding.

2590510 Primary Facility 2017-05-04 Administrative/File Review No Violations Noted Department received Operator's response to inspection dated 4/20/2017 (Ins. ID 2585706).
2606098 Primary Facility 2017-06-20 Compliance Evaluation No Violations Noted At the time of inspection clean-up appears to have been completed. Earthen dike spill area has been backfilled with new gravel. Compromised brine tank valve has been fixed. No E&S issues.

Department awaiting final remediation report from Operator. Department will follow-up to ensure adequate restoration is maintained.

2615076 Primary Facility 2017-07-13 Routine/Complete Inspection No Violations Noted At time of inspection well appears to be in production. Pump jack located on site. Well head surrounded by security fence.

An operator reported release of production fluid occurred on 4-20-17. The NOV was closed on 6-20-17. The area of the release has been rocked. Department is awaiting final remediation report from operator. A follow up inspection will be conducted at a later date.

2656667 Primary Facility 2017-10-27 Administrative/File Review No Violations Noted Department received final report of Alternative Remediation on 9/05/2017. Report was referred to ECB for review.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2585706 784160 2017-04-20 2017-06-20 78.57(a) Environmental Health & Safety Violation issued
2588331 784489 2017-04-26 78.57(a) Environmental Health & Safety Previously issued violation remains outstanding.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
784160 352901 NOV - Notice of Violation 2018-04-26

For data sources see[6]

References