If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-047-24381 | | Well ID: 37-047-24381 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.584163, -78.821292 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 21: | Line 21: | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
− | | Spud Date: 02 | + | | Spud Date: 2010-02-05 |
|- | |- | ||
− | | Permit Date: 10 | + | | Permit Date: 2009-10-30 |
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
Line 49: | Line 49: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | <!--== Fracking Activities == | ||
+ | ==== Fracking Jobs ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Job Start Date | ||
+ | !scope="col" | Job End Date | ||
+ | !scope="col" | True Vertical Depth (ft) | ||
+ | !scope="col" | Total Water Volume (gal) | ||
+ | !scope="col" | Total Non-Water Volume (gal) | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Fluid Composition Data ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Job Number | ||
+ | !scope="col" | Trade Name | ||
+ | !scope="col" | Supplier | ||
+ | !scope="col" | Purpose | ||
+ | !scope="col" | Ingredient Name | ||
+ | !scope="col" | CAS Number | ||
+ | !scope="col" | Additive Percentage by Mass | ||
+ | !scope="col" | Job Percentage by Mass | ||
+ | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 63: | Line 88: | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 0 |
|- | |- | ||
| 2010 | | 2010 | ||
Line 517: | Line 542: | ||
| 1865119 | | 1865119 | ||
| Primary Facility | | Primary Facility | ||
− | | 02 | + | | 2010-02-22 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| Violation(s) Noted | | Violation(s) Noted | ||
Line 524: | Line 549: | ||
| 1883243 | | 1883243 | ||
| Primary Facility | | Primary Facility | ||
− | | 04 | + | | 2010-04-06 |
| Compliance Evaluation | | Compliance Evaluation | ||
| Outstanding Violations - No Viols Req'd | | Outstanding Violations - No Viols Req'd | ||
Line 531: | Line 556: | ||
| 1901503 | | 1901503 | ||
| Primary Facility | | Primary Facility | ||
− | | 07 | + | | 2010-07-28 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| Violation(s) Noted | | Violation(s) Noted | ||
Line 538: | Line 563: | ||
| 1945852 | | 1945852 | ||
| Primary Facility | | Primary Facility | ||
− | | 01 | + | | 2011-01-12 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 545: | Line 570: | ||
| 2003475 | | 2003475 | ||
| Primary Facility | | Primary Facility | ||
− | | 09 | + | | 2011-09-16 |
| Compliance Evaluation | | Compliance Evaluation | ||
| No Violations Noted | | No Violations Noted | ||
Line 552: | Line 577: | ||
| 2037211 | | 2037211 | ||
| Primary Facility | | Primary Facility | ||
− | | 01 | + | | 2012-01-19 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 559: | Line 584: | ||
| 2310777 | | 2310777 | ||
| Primary Facility | | Primary Facility | ||
− | | 10 | + | | 2014-10-03 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
Line 578: | Line 603: | ||
| 581922 | | 581922 | ||
| 02/22/2010 | | 02/22/2010 | ||
− | | | + | | 2010-02-22 |
| 102.4INADPLN - E&S Plan not adequate | | 102.4INADPLN - E&S Plan not adequate | ||
| Administrative | | Administrative | ||
Line 586: | Line 611: | ||
| 581923 | | 581923 | ||
| 02/22/2010 | | 02/22/2010 | ||
− | | | + | | 2010-02-22 |
| 402CSL B - Failure to meet requirements of permit, rules and regulations, or order of DEP. | | 402CSL B - Failure to meet requirements of permit, rules and regulations, or order of DEP. | ||
| Environmental Health & Safety | | Environmental Health & Safety | ||
Line 594: | Line 619: | ||
| 592025 | | 592025 | ||
| 07/28/2010 | | 07/28/2010 | ||
− | | | + | | 2010-07-28 |
| 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | ||
| Administrative | | Administrative | ||
Line 616: | Line 641: | ||
| Comply/Closed | | Comply/Closed | ||
| | | | ||
− | | 08 | + | | 2010-08-06 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
Line 625: | Line 650: | ||
| Comply/Closed | | Comply/Closed | ||
| | | | ||
− | | 08 | + | | 2010-08-06 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
Line 633: | Line 658: | ||
| CACP - Consent Assessment of Civil Penalty | | CACP - Consent Assessment of Civil Penalty | ||
| Comply/Closed | | Comply/Closed | ||
− | | 10 | + | | 2013-10-30 |
− | | 10 | + | | 2013-10-30 |
| style="text-align: right;" | $198,500.00 | | style="text-align: right;" | $198,500.00 | ||
| style="text-align: right;" | $198,500.00 | | style="text-align: right;" | $198,500.00 | ||
Line 643: | Line 668: | ||
| Comply/Closed | | Comply/Closed | ||
| | | | ||
− | | 08 | + | | 2010-08-06 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
Line 651: | Line 676: | ||
| CACP - Consent Assessment of Civil Penalty | | CACP - Consent Assessment of Civil Penalty | ||
| Comply/Closed | | Comply/Closed | ||
− | | 10 | + | | 2013-10-30 |
− | | 10 | + | | 2013-10-30 |
| style="text-align: right;" | $198,500.00 | | style="text-align: right;" | $198,500.00 | ||
| style="text-align: right;" | $198,500.00 | | style="text-align: right;" | $198,500.00 | ||
Line 661: | Line 686: | ||
| Comply/Closed | | Comply/Closed | ||
| | | | ||
− | | 09 | + | | 2011-09-16 |
| style="text-align: right;" | | | style="text-align: right;" | | ||
| style="text-align: right;" | | | style="text-align: right;" | | ||
Line 672: | Line 697: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] |
Well ID: 37-047-24381 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.584163,"lon":-78.821292,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Elk | |
Municipality: Highland Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: 149348 | |
Farm/Lease Name: SRC WARRANT 3752 6H 39086 | |
License Status: Active | |
Spud Date: 2010-02-05 | |
Permit Date: 2009-10-30 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.584163 | |
Longitude: -78.821292 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 | |
2010 | SENECA RESOURCES CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | SENECA RESOURCES CO LLC | 394,642.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2012 | SENECA RESOURCES CO LLC | 212,591.00 | 360 | 0.00 | 0 | 0.00 | 0 |
2013 | SENECA RESOURCES CO LLC | 165,706.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2014 | SENECA RESOURCES CO LLC | 76,464.00 | 197 | 0.00 | 0 | 0.00 | 0 |
2015 | SENECA RESOURCES CO LLC | 134,719.12 | 248 | 0.00 | 0 | 0.00 | 0 |
2016 | SENECA RESOURCES CO LLC | 132,718.88 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | SENECA RESOURCES CO LLC | 113,033.82 | 352 | 0.00 | 0 | 0.00 | 0 |
2018 | PIN OAK ENERGY PARTNERS LLC | 115,570.00 | 358 | 0.00 | 0 | 4,762.00 | 298 |
2019 | PIN OAK ENERGY PARTNERS LLC | 16,210.00 | 58 | 0.00 | 0 | 225.00 | 28 |
For data sources see[4]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2010-A01 | Produced Fluid (in Barrels) | 12,205.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010-S01 | Produced Fluid (in Barrels) | 6,102.50 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2010-S02 | Fracing Fluid Waste (in Barrels) | 12,205.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011-S01 | Produced Fluid (in Barrels) | 55.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2011-S01 | Produced Fluid (in Barrels) | 9,608.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2011-S02 | Produced Fluid (in Barrels) | 1,250.00 Bbl | INJECTION DISPOSAL WELL | 34-049-23127 |
2011-S02 | Produced Fluid (in Barrels) | 2,444.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012-S01 | Produced Fluid (in Barrels) | 2,000.00 Bbl | INJECTION DISPOSAL WELL | 34-007-21193 |
2012-S01 | Produced Fluid (in Barrels) | 240.00 Bbl | INJECTION DISPOSAL WELL | 34-151-23420 |
2012-S01 | Produced Fluid (in Barrels) | 284.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2012-S02 | Produced Fluid (in Barrels) | 200.00 Bbl | INJECTION DISPOSAL WELL | 34-133-20525 |
2012-S02 | Produced Fluid (in Barrels) | 200.00 Bbl | INJECTION DISPOSAL WELL | 34-155-23795 |
2012-S02 | Produced Fluid (in Barrels) | 1,614.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S01 | Produced Fluid (in Barrels) | 1,667.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2013-S02 | Produced Fluid (in Barrels) | 1,519.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S01 | Produced Fluid (in Barrels) | 1,222.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S02 | Produced Fluid (in Barrels) | 102.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S02 | Produced Fluid (in Barrels) | 636.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016-M01 | Produced Fluid (in Barrels) RWC 802 | 220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016-M02 | Produced Fluid (in Barrels) RWC 802 | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016-M03 | Produced Fluid (in Barrels) RWC 802 | 225.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016-M04 | Produced Fluid (in Barrels) RWC 802 | 95.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016-M05 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 59.42 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016-M05 | Produced Fluid (in Barrels) RWC 802 | 275.48 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016-M06 | Produced Fluid (in Barrels) RWC 802 | 220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016-M07 | Produced Fluid (in Barrels) RWC 802 | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016-M08 | Produced Fluid (in Barrels) RWC 802 | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016-M09 | Produced Fluid (in Barrels) RWC 802 | 217.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016-M10 | Produced Fluid (in Barrels) RWC 802 | 209.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016-M11 | Produced Fluid (in Barrels) RWC 802 | 110.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123NW011 |
2016-M12 | Produced Fluid (in Barrels) RWC 802 | 220.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 220.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 330.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 240.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 110.00 Bbl | REUSE (AT WELL PAD) | |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 110.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M10 | Produced Fluid (in Barrels) RWC 802 | 240.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW011 |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 325.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 105.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018-M01 | Waste comment only | Comment | ||
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 105.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 210.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 114.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 105.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 210.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 105.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 210.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018-M10 | Produced Fluid (in Barrels) RWC 802 | 105.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 105.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 210.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 105.00 Bbl | STORAGE PENDING DISPOSAL OR REUSE | |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 105.00 Bbl | INJECTION DISPOSAL WELL | 34-133-22523 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1865119 | Primary Facility | 2010-02-22 | Routine/Complete Inspection | Violation(s) Noted | |
1883243 | Primary Facility | 2010-04-06 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | |
1901503 | Primary Facility | 2010-07-28 | Routine/Complete Inspection | Violation(s) Noted | |
1945852 | Primary Facility | 2011-01-12 | Routine/Complete Inspection | No Violations Noted | |
2003475 | Primary Facility | 2011-09-16 | Compliance Evaluation | No Violations Noted | |
2037211 | Primary Facility | 2012-01-19 | Routine/Complete Inspection | No Violations Noted | |
2310777 | Primary Facility | 2014-10-03 | Routine/Complete Inspection | No Violations Noted |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
1865119 | 581922 | 02/22/2010 | 2010-02-22 | 102.4INADPLN - E&S Plan not adequate | Administrative | Plan not accurate |
1865119 | 581923 | 02/22/2010 | 2010-02-22 | 402CSL B - Failure to meet requirements of permit, rules and regulations, or order of DEP. | Environmental Health & Safety | |
1901503 | 592025 | 07/28/2010 | 2010-07-28 | 102.11 - Failure to design, implement or maintain BMPs to minimize the potential for accelerated erosion and sedimentation. | Administrative | Some sections of the cut and fill slopes need reseeded |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
581922 | 255613 | NOV - Notice of Violation | Comply/Closed | 2010-08-06 | |||
581922 | 255935 | NOV - Notice of Violation | Comply/Closed | 2010-08-06 | |||
581922 | 304001 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2013-10-30 | 2013-10-30 | $198,500.00 | $198,500.00 |
581923 | 255613 | NOV - Notice of Violation | Comply/Closed | 2010-08-06 | |||
581923 | 304001 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2013-10-30 | 2013-10-30 | $198,500.00 | $198,500.00 |
592025 | 264227 | NOV - Notice of Violation | Comply/Closed | 2011-09-16 |
For data sources see[6]