X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-25063"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-25063
 
| Well ID: 37-129-25063
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.161965, -79.8322 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.161965, -79.8322 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 10/22/2003
+
| Spud Date: 2003-10-22
 
|-
 
|-
| Permit Date: 6/26/2003
+
| Permit Date: 2003-06-26
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2004
 
| 2004
Line 74: Line 99:
 
| style="text-align: right;" | 300
 
| style="text-align: right;" | 300
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2005
 
| 2005
Line 83: Line 108:
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 330
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2006
 
| 2006
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 110: Line 135:
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 361
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 119: Line 144:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 128: Line 153:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 137: Line 162:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 148: Line 173:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 155: Line 180:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 164: Line 189:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 173: Line 198:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 182: Line 207:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 191: Line 216:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 200: Line 225:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 256: Line 281:
 
| 1315746
 
| 1315746
 
| Primary Facility
 
| Primary Facility
| 03/04/2004
+
| 2004-03-04
 
| Complaint Inspection
 
| Complaint Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 263: Line 288:
 
| 1321965
 
| 1321965
 
| Primary Facility
 
| Primary Facility
| 03/11/2004
+
| 2004-03-11
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Outstanding Violations - Viols Req'd
 
| Outstanding Violations - Viols Req'd
Line 270: Line 295:
 
| 1342107
 
| 1342107
 
| Primary Facility
 
| Primary Facility
| 06/02/2004
+
| 2004-06-02
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 289: Line 314:
 
| 385249
 
| 385249
 
| 03/04/2004
 
| 03/04/2004
| 06/02/2004
+
| 2004-03-04
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 297: Line 322:
 
| 385250
 
| 385250
 
| 03/04/2004
 
| 03/04/2004
| 03/26/2004
+
| 2004-03-04
 
| 205B - Drilling w/in 100 ft of surface water or wetland w/o variance
 
| 205B - Drilling w/in 100 ft of surface water or wetland w/o variance
 
| Administrative
 
| Administrative
Line 305: Line 330:
 
| 388466
 
| 388466
 
| 03/11/2004
 
| 03/11/2004
| 03/26/2004
+
| 2004-03-11
 
| 205B - Drilling w/in 100 ft of surface water or wetland w/o variance
 
| 205B - Drilling w/in 100 ft of surface water or wetland w/o variance
 
| Administrative
 
| Administrative
Line 313: Line 338:
 
| 388467
 
| 388467
 
| 03/11/2004
 
| 03/11/2004
| 06/02/2004
+
| 2004-03-11
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 335: Line 360:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 06/02/2004
+
| 2004-06-02
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 343: Line 368:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 03/21/2005
+
| 2005-03-21
| 03/25/2005
+
| 2005-03-25
 
| style="text-align: right;" | $3,240.00
 
| style="text-align: right;" | $3,240.00
 
| style="text-align: right;" | $3,240.00
 
| style="text-align: right;" | $3,240.00
Line 353: Line 378:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 06/02/2004
+
| 2004-06-02
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 361: Line 386:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 03/21/2005
+
| 2005-03-21
| 03/25/2005
+
| 2005-03-25
 
| style="text-align: right;" | $3,240.00
 
| style="text-align: right;" | $3,240.00
 
| style="text-align: right;" | $3,240.00
 
| style="text-align: right;" | $3,240.00
Line 370: Line 395:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 03/21/2005
+
| 2005-03-21
| 03/25/2005
+
| 2005-03-25
 
| style="text-align: right;" | $3,240.00
 
| style="text-align: right;" | $3,240.00
 
| style="text-align: right;" | $3,240.00
 
| style="text-align: right;" | $3,240.00
Line 379: Line 404:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 03/21/2005
+
| 2005-03-21
| 03/25/2005
+
| 2005-03-25
 
| style="text-align: right;" | $3,240.00
 
| style="text-align: right;" | $3,240.00
 
| style="text-align: right;" | $3,240.00
 
| style="text-align: right;" | $3,240.00
Line 391: Line 416:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 07:14, 1 August 2019

Well Details

Well ID: 37-129-25063
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Rostraver Township
Operator Name: PATRIOT EXPLORATION CORP
Well Pad ID:
Farm/Lease Name: CANESTRALE FARM 4
License Status: Active
Spud Date: 2003-10-22
Permit Date: 2003-06-26
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.161965
Longitude: -79.8322

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2003 0.00 0 0.00 0 0.00 0
2004 PATRIOT EXPLORATION CORP 8,149.00 300 0.00 0 0.00 0
2005 PATRIOT EXPLORATION CORP 8,884.00 330 0.00 0 0.00 0
2006 PATRIOT EXPLORATION CORP 8,013.00 365 0.00 0 0.00 0
2007 PATRIOT EXPLORATION CORP 6,790.00 365 0.00 0 0.00 0
2008 PATRIOT EXPLORATION CORP 7,509.00 361 0.00 0 0.00 0
2009 PATRIOT EXPLORATION CORP 6,516.00 365 0.00 0 0.00 0
2010 PATRIOT EXPLORATION CORP 7,875.00 365 0.00 0 0.00 0
2011 PATRIOT EXPLORATION CORP 5,565.00 365 0.00 0 0.00 0
2012 PATRIOT EXPLORATION CORP 5,281.00 365 20.00 365 0.00 0
2013 PATRIOT EXPLORATION CORP 5,532.00 365 0.00 0 0.00 0
2014 PATRIOT EXPLORATION CORP 5,062.00 365 0.00 0 0.00 0
2015 PATRIOT EXPLORATION CORP 4,516.00 365 0.00 0 0.00 0
2016 PATRIOT EXPLORATION CORP 4,411.00 365 0.00 0 0.00 0
2017 PATRIOT EXPLORATION CORP 3,990.00 365 0.00 0 0.00 0
2018 PATRIOT EXPLORATION CORP 3,848.00 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2003-A00 Fracking Fluid Bbl Brine or Industrial Waste Treatment Plt PA0091472
2004-A00 Brine 5.00 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2018-A00 Produced Fluid (in Barrels) RWC 802 20.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1315746 Primary Facility 2004-03-04 Complaint Inspection Violation(s) Noted equipped/tank&tag ok/E&S site & pipeline crossing/no stream waiver
1321965 Primary Facility 2004-03-11 Compliance Evaluation Outstanding Violations - Viols Req'd onsite meeting with operator/E&S controls ok - except for rip-rap in stream/OG-57 to be submitted
1342107 Primary Facility 2004-06-02 Compliance Evaluation No Violations Noted site incompliace with NOV issued 3-8-04/equipped/restored/tank&tag ok

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1315746 385249 03/04/2004 2004-03-04 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1315746 385250 03/04/2004 2004-03-04 205B - Drilling w/in 100 ft of surface water or wetland w/o variance Administrative
1321965 388466 03/11/2004 2004-03-11 205B - Drilling w/in 100 ft of surface water or wetland w/o variance Administrative
1321965 388467 03/11/2004 2004-03-11 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
385249 136245 NOV - Notice of Violation Comply/Closed 2004-06-02
385249 188724 CACP - Consent Assessment of Civil Penalty Comply/Closed 2005-03-21 2005-03-25 $3,240.00 $3,240.00
385250 136245 NOV - Notice of Violation Comply/Closed 2004-06-02
385250 188724 CACP - Consent Assessment of Civil Penalty Comply/Closed 2005-03-21 2005-03-25 $3,240.00 $3,240.00
388466 188724 CACP - Consent Assessment of Civil Penalty Comply/Closed 2005-03-21 2005-03-25 $3,240.00 $3,240.00
388467 188724 CACP - Consent Assessment of Civil Penalty Comply/Closed 2005-03-21 2005-03-25 $3,240.00 $3,240.00

For data sources see[6]

References