X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28275"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28275
 
| Well ID: 37-129-28275
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.166873, -79.603395 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.166873, -79.603395 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 03/03/2010
+
| Spud Date: 2010-03-03
 
|-
 
|-
| Permit Date: 2/25/2010
+
| Permit Date: 2010-02-25
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 214
 
| style="text-align: right;" | 214
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 74: Line 99:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 83: Line 108:
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 92: Line 117:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 101: Line 126:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 110: Line 135:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 119: Line 144:
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 335
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 128: Line 153:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 137: Line 162:
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 217: Line 242:
 
| 1861333
 
| 1861333
 
| Primary Facility
 
| Primary Facility
| 01/15/2010
+
| 2010-01-15
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 224: Line 249:
 
| 1868774
 
| 1868774
 
| Primary Facility
 
| Primary Facility
| 03/08/2010
+
| 2010-03-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 231: Line 256:
 
| 1875903
 
| 1875903
 
| Primary Facility
 
| Primary Facility
| 04/06/2010
+
| 2010-04-06
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 238: Line 263:
 
| 1899779
 
| 1899779
 
| Primary Facility
 
| Primary Facility
| 07/06/2010
+
| 2010-07-06
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 245: Line 270:
 
| 2349164
 
| 2349164
 
| Primary Facility
 
| Primary Facility
| 03/04/2015
+
| 2015-03-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 280: Line 305:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 12:31, 1 August 2019

Well Details

Well ID: 37-129-28275
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: East Huntingdon Township
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC
Well Pad ID:
Farm/Lease Name: T FORSYTHE 001
License Status: Active
Spud Date: 2010-03-03
Permit Date: 2010-02-25
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.166873
Longitude: -79.603395

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 KRIEBEL MINERALS INC 8,455.00 214 0.00 0 0.00 0
2011 KRIEBEL MINERALS INC 10,277.00 334 0.00 0 0.00 0
2012 KRIEBEL MINERALS INC 8,678.00 335 0.00 0 0.00 0
2013 KRIEBEL MINERALS INC 6,187.00 334 0.00 0 0.00 0
2014 KRIEBEL MINERALS INC 5,398.00 334 0.00 0 0.00 0
2015 KRIEBEL MINERALS INC 2,292.00 334 0.00 0 0.00 0
2016 KRIEBEL MINERALS INC 3,437.00 335 0.00 0 0.00 0
2017 KRIEBEL WELLS DISSOLUTION CO LLC 2,589.00 334 0.00 0 0.00 0
2018 KRIEBEL WELLS DISSOLUTION CO LLC 1,678.00 334 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-A00 Drilling Fluid Waste (in Barrels) 2,310.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-A00 Drilling Fluid Waste (in Barrels) 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2010-A00 Fracing Fluid Waste (in Barrels) 880.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-A00 Fracing Fluid Waste (in Barrels) 0.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2012-A00 Produced Fluid (in Barrels) 20.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095443
2016-A00 Produced Fluid (in Barrels) RWC 802 40.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273
2017-A00 Produced Fluid (in Barrels) RWC 802 20.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1861333 Primary Facility 2010-01-15 Routine/Complete Inspection No Violations Noted On January 15, 2010 I conducted an inspection for an OG 57 Request for waiver of distance requirement. Also on site was DEP WQS Nick Staffieri. The well site is proposed to be constructed within 100 ft. from an unnamed tributary to Buffalo Run. Well was site staked. Construction has not begun at site. Proposed E & S plan should protect stream from adverse impact during site/well development if properly implemented & maintained. Drill cuttings are to be land farmed on site. Operator must ensure that the surface of the land farm area is at least 20 inches above the seasonal high groundwater table.
1868774 Primary Facility 2010-03-08 Routine/Complete Inspection No Violations Noted Well is being drilled currently.
1875903 Primary Facility 2010-04-06 Routine/Complete Inspection No Violations Noted drilling complete, not equipped for production, rough graded.
1899779 Primary Facility 2010-07-06 Routine/Complete Inspection No Violations Noted Site inspection for GP056510810 and GP076510801 for a pipeling project. Met Mike Morgart on sit to look at any possible wetland impacts due to hydric soils being in the project area. The small drainage has been altered at some point and the land use is a mow field so other than a few riparian vegeation species there are no other wetland indicators that we observed that would be impacted by this project.
2349164 Primary Facility 2015-03-04 Routine/Complete Inspection No Violations Noted Tag, tank, e&s ok.

For data sources see[6]

References