If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
| Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-129-28609 | | Well ID: 37-129-28609 | ||
| − | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 40.134661, -79.364092 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
| Line 23: | Line 23: | ||
| Spud Date: | | Spud Date: | ||
|- | |- | ||
| − | | Permit Date: | + | | Permit Date: 2011-06-06 |
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
| Line 49: | Line 49: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
| + | <!--== Fracking Activities == | ||
| + | ==== Fracking Jobs ==== | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Job Number | ||
| + | !scope="col" | Job Start Date | ||
| + | !scope="col" | Job End Date | ||
| + | !scope="col" | True Vertical Depth (ft) | ||
| + | !scope="col" | Total Water Volume (gal) | ||
| + | !scope="col" | Total Non-Water Volume (gal) | ||
| + | |- | ||
| + | |}--> | ||
| + | <!--==== Fluid Composition Data ==== | ||
| + | {| class="wikitable sortable" width="95%" | ||
| + | !scope="col" | Job Number | ||
| + | !scope="col" | Trade Name | ||
| + | !scope="col" | Supplier | ||
| + | !scope="col" | Purpose | ||
| + | !scope="col" | Ingredient Name | ||
| + | !scope="col" | CAS Number | ||
| + | !scope="col" | Additive Percentage by Mass | ||
| + | !scope="col" | Job Percentage by Mass | ||
| + | !scope="col" | Mass Used (lb) | ||
| + | |- | ||
| + | |}--> | ||
| + | |||
== Production Data == | == Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
| Line 107: | Line 132: | ||
| 1994363 | | 1994363 | ||
| Primary Facility | | Primary Facility | ||
| − | | 06 | + | | 2011-06-21 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Line 114: | Line 139: | ||
| 1994405 | | 1994405 | ||
| Primary Facility | | Primary Facility | ||
| − | | 06 | + | | 2011-06-29 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Line 121: | Line 146: | ||
| 2000746 | | 2000746 | ||
| Primary Facility | | Primary Facility | ||
| − | | 07 | + | | 2011-07-25 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Line 128: | Line 153: | ||
| 2012817 | | 2012817 | ||
| Primary Facility | | Primary Facility | ||
| − | | 10 | + | | 2011-10-21 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Line 135: | Line 160: | ||
| 2026777 | | 2026777 | ||
| Primary Facility | | Primary Facility | ||
| − | | 12 | + | | 2011-12-05 |
| Drilling/Alteration | | Drilling/Alteration | ||
| No Violations Noted | | No Violations Noted | ||
| Line 142: | Line 167: | ||
| 2034564 | | 2034564 | ||
| Primary Facility | | Primary Facility | ||
| − | | 01 | + | | 2012-01-11 |
| Routine/Complete Inspection | | Routine/Complete Inspection | ||
| No Violations Noted | | No Violations Noted | ||
| Line 149: | Line 174: | ||
| 2438918 | | 2438918 | ||
| Primary Facility | | Primary Facility | ||
| − | | 12 | + | | 2015-12-15 |
| Plugging(Includes Plugged/Mined Through) | | Plugging(Includes Plugged/Mined Through) | ||
| No Violations Noted | | No Violations Noted | ||
| Line 156: | Line 181: | ||
| 2438937 | | 2438937 | ||
| Primary Facility | | Primary Facility | ||
| − | | 12 | + | | 2015-12-17 |
| Plugging(Includes Plugged/Mined Through) | | Plugging(Includes Plugged/Mined Through) | ||
| No Violations Noted | | No Violations Noted | ||
| Line 191: | Line 216: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
| − | |||
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Pennsylvania Wells]] | [[Category:Pennsylvania Wells]] | ||
| Well ID: 37-129-28609 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.134661,"lon":-79.364092,"icon":""}]} |
| Country: United States | |
| State: Pennsylvania | |
| County: Westmoreland | |
| Municipality: Donegal Township | |
| Operator Name: XPR RESOURCES LLC | |
| Well Pad ID: | |
| Farm/Lease Name: KALP 1-5H | |
| License Status: | |
| Spud Date: | |
| Permit Date: 2011-06-06 | |
| Unconventional Well: Y | |
| Configuration: Horizontal Well | |
| Latitude: 40.134661 | |
| Longitude: -79.364092 |
| Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
|---|---|---|---|---|---|---|---|
| 2011 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
| 2012 | XPR RESOURCES LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
| Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
|---|---|---|---|---|---|
| 1994363 | Primary Facility | 2011-06-21 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. Road, pad and pits were under construction. |
| 1994405 | Primary Facility | 2011-06-29 | Routine/Complete Inspection | No Violations Noted | Site visit was conducted to address landowners concerns. The Kalps, ARM and HRI were represented along with the DEP. |
| 2000746 | Primary Facility | 2011-07-25 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. Mr. Kalp came on site during inspection. No one else was on site. |
| 2012817 | Primary Facility | 2011-10-21 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspection. Patterson-UTI Rig #480 was on site. Spoke with Joe Ray Company Man on site. |
| 2026777 | Primary Facility | 2011-12-05 | Drilling/Alteration | No Violations Noted | WELL PERMITED BUT NOT DRILLED. E&S AND PITS, GOOD |
| 2034564 | Primary Facility | 2012-01-11 | Routine/Complete Inspection | No Violations Noted | Site visit was part of routine inspectiion. |
| 2438918 | Primary Facility | 2015-12-15 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | WPX started the process of plugging Kalp 1-9H well on December 14, 2015. WPX pumped 30 bbl. of down tubing and 70 bbl. down casing to kill well. Removed production tree and set BOP. CIBP was set at 7500 feet. On December 15, 2015, WPX ran wireline to determine free casing location at 1250 feet. Pulled casing to first collar and removed casing of 27 joints. |
| 2438937 | Primary Facility | 2015-12-17 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | WPX continued the process of plugging Kalp 1-9H well on December 16, 2015. WPX set 2 3/8” tubing to the CIBP at 7500 feet. C&J cementers cemented 7500 to 1050 feet with 1000 foot interval plugs using 1545 bbl comprised of 690 sacks of 15.2 # class A cement (1.25 yield and 5.3 GPS). On December 17, 2015, TIH tag cement at 580 feet C&J cementer cemented 580 feet to surface using 42.5 bbl. with 190 sacks of Class A cement. |
For data sources see[5]