X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-28821"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-28821
 
| Well ID: 37-129-28821
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.503997, -79.573208 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.503997, -79.573208 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 08/05/2013
+
| Spud Date: 2013-08-05
 
|-
 
|-
| Permit Date: 9/20/2012
+
| Permit Date: 2012-09-20
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
== Production Data ==
+
== Fracking Activities ==
 +
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
!scope="col" | Period
+
!scope="col" | Job Number
!scope="col" | Operator Name
+
!scope="col" | Job Start Date
!scope="col" | Gas Quantity (mcf)
+
!scope="col" | Job End Date
!scope="col" | Gas Production Days
+
!scope="col" | True Vertical Depth (ft)
!scope="col" | Oil Quantity (bbl)
+
!scope="col" | Total Water Volume (gal)
!scope="col" | Oil Production Days
+
!scope="col" | Total Non-Water Volume (gal)
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Production Days
 
 
|-
 
|-
| 2013
+
| 1
| [[CNX GAS CO LLC]]
+
| 2014-05-14
| style="text-align: right;" | 0.00
+
| 2014-05-30
| style="text-align: right;" | 0
+
| style="text-align: right;" | 7798
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 7,922,670.0
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
| 2014
+
|}
| [[CNX GAS CO LLC]]
+
==== Fluid Composition Data ====
| style="text-align: right;" | 796,876.63
+
{| class="wikitable sortable" width="95%"
| style="text-align: right;" | 196
+
!scope="col" | Job Number
| style="text-align: right;" | 0.00
+
!scope="col" | Trade Name
| style="text-align: right;" | 0
+
!scope="col" | Supplier
| style="text-align: right;" | 0.00
+
!scope="col" | Purpose
| style="text-align: right;" | 0
+
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 
|-
 
|-
| 2015
+
|- valign="top"
| [[CNX GAS CO LLC]]
+
| rowspan="31"| 1
| style="text-align: right;" | 865,047.41
+
| rowspan="1"| Water
| style="text-align: right;" | 365
+
| rowspan="1"| Customer & CWS
| style="text-align: right;" | 0.00
+
| rowspan="1"| Base Fluid & Mix Water
| style="text-align: right;" | 0
+
| Water
| style="text-align: right;" | 0.00
+
| 7732-18-5
| style="text-align: right;" | 0
+
| style="text-align: right;" | 1
 +
| style="text-align: right;" | 87.1599
 +
| style="text-align: right;" | 66,091,600.0
 
|-
 
|-
| 2016
+
|- valign="top"
| [[CNX GAS CO LLC]]
+
| rowspan="30"| Sand (Proppant), DAP-903, DWP-111,<br/> DWP-614, BioClear 2000,<br/> DWP-NE1, Spearhead Acid, Acetic Acid
| style="text-align: right;" | 588,704.89
+
| rowspan="30"| CWS
| style="text-align: right;" | 366
+
| rowspan="30"| Propping Agent, Scale Inhibitor, Gel Slurry, Viscosifier, Biocide, Non-Emulsifier, Clean Perforations, Acid
| style="text-align: right;" | 0.00
+
| 2,2-Dibromo-3-Nitrilopropionamide
| style="text-align: right;" | 0
+
| 10222-01-2
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 0.2
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.01299
 +
| style="text-align: right;" | 9850.37
 
|-
 
|-
| 2017
+
| Fatty acids, tall-oil
| [[CNX GAS CO LLC]]
+
| 61790-12-3
| style="text-align: right;" | 457,838.40
+
| style="text-align: right;" | 0.001
| style="text-align: right;" | 365
+
| style="text-align: right;" | 0.00146
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 1104.26
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
| 2018
+
| Illite
| [[CNX GAS CO LLC]]
+
| 12173-60-3
| style="text-align: right;" | 386,046.46
+
| style="text-align: right;" | 0.01
| style="text-align: right;" | 365
+
| style="text-align: right;" | 0.01023
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 7754.13
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
| 2019
+
| Formaldehyde
| [[CNX GAS CO LLC]]
+
| 50-00-0
| style="text-align: right;" | 87,414.73
+
| style="text-align: right;" | 0.001
| style="text-align: right;" | 90
+
| style="text-align: right;" | 0.0001
| style="text-align: right;" | 0.00
+
| style="text-align: right;" | 73.6173
| style="text-align: right;" | 0
+
|-
| style="text-align: right;" | 0.00
+
| Guar gum
| style="text-align: right;" | 0
+
| 9000-30-0
 +
| style="text-align: right;" | 0.6
 +
| style="text-align: right;" | 0.00003000
 +
| style="text-align: right;" | 26.3711
 
|-
 
|-
|}
+
| Calcite
For data sources see<ref>{{cite web
+
| 471-34-1
| title =Oil and Gas Production Reports
+
| style="text-align: right;" | 0.01
|publisher = [[Pennsylvania Department of Environmental Protection]]
+
| style="text-align: right;" | 0.01788
| date = 2019-03-31
+
| style="text-align: right;" | 13561.6
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Disposal Method
 
!scope="col" | Waste Facility ID
 
 
|-
 
|-
| 2013-S02
+
| Alcohols, C14-15, ethoxylated
| Drill Cuttings (in Tons)
+
| 68951-67-7
| style="text-align: right;" | 93.63 Tons
+
| style="text-align: right;" | 0.001
| RESIDUAL WASTE TRANSFER FACILITY
+
| style="text-align: right;" | 0.00146
| 301071
+
| style="text-align: right;" | 1104.26
 
|-
 
|-
| 2013-S02
+
| Quaternary ammonium compounds,<br/> bis(hydrogenated tallow alkyl)dimethyl,<br/> salts with bentonite
| Drilling Fluid Waste (in Barrels)
+
| 68953-58-2
| style="text-align: right;" | 577.06 Bbl
+
| style="text-align: right;" | 0.05
| RESIDUAL WASTE TRANSFER FACILITY
+
| style="text-align: right;" | 0
| 301071
+
| style="text-align: right;" | 2.19759
 
|-
 
|-
| 2014-S01
+
| Poly(oxyethylene)nonylphenol ether
| Drill Cuttings (in Tons)
+
| 9016-45-9
| style="text-align: right;" | 291.42 Tons
+
| style="text-align: right;" | 0.05
| LANDFILL
+
| style="text-align: right;" | 0.00302
| 301071
+
| style="text-align: right;" | 2293.02
 
|-
 
|-
| 2014-S01
+
| Alkenes, C>10 a-
| Drilling Fluid Waste (in Barrels)
+
| 64743-02-8
| style="text-align: right;" | 458.89 Bbl
+
| style="text-align: right;" | 0.001
| LANDFILL
+
| style="text-align: right;" | 0.00146
| 301071
+
| style="text-align: right;" | 1104.26
 
|-
 
|-
| 2014-S01
+
| Acetic acid
| Fracing Fluid Waste (in Barrels)
+
| 64-19-7
| style="text-align: right;" | 9,652.09 Bbl
+
| style="text-align: right;" | 1
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0.08706
|  
+
| style="text-align: right;" | 66013.9
 
|-
 
|-
| 2014-S02
+
| Distillates (petroleum), hydrotreated middle
| Drilling Fluid Waste (in Barrels)
+
| 64742-46-7
| style="text-align: right;" | 458.89 Bbl
+
| style="text-align: right;" | 0.6
| RESIDUAL WASTE TRANSFER FACILITY
+
| style="text-align: right;" | 0.01818
| 301071
+
| style="text-align: right;" | 13784.5
 
|-
 
|-
| 2014-S02
+
| Apatite
| Produced Fluid (in Barrels)
+
| 64476-38-6
| style="text-align: right;" | 178.48 Bbl
+
| style="text-align: right;" | 0.001
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 0.00464
| 34-013-20609
+
| style="text-align: right;" | 3517.69
 
|-
 
|-
| 2014-S02
+
| 2-Propenoic acid, polymer with 2-propenamide, sodium salt
| Produced Fluid (in Barrels)
+
| 25987-30-8
| style="text-align: right;" | 391.99 Bbl
+
| style="text-align: right;" | 0.4
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 0.02419
| 34-119-28776
+
| style="text-align: right;" | 18344.2
 
|-
 
|-
| 2014-S02
+
| Ilmenite
| Produced Fluid (in Barrels)
+
| 98072-94-7
| style="text-align: right;" | 120.00 Bbl
+
| style="text-align: right;" | 0.001
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 0.00379
| 34-133-20525
+
| style="text-align: right;" | 2871.9
 
|-
 
|-
| 2014-S02
+
| Crystalline silica (Quartz)
| Produced Fluid (in Barrels)
+
| 14808-60-7
| style="text-align: right;" | 21,691.11 Bbl
+
| style="text-align: right;" | 1
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 12.2456
|  
+
| style="text-align: right;" | 9,285,580.0
 
|-
 
|-
| 2015-M07
+
| Modified thiourea polymer
| Produced Fluid (in Barrels)
+
| 68527-49-1
| style="text-align: right;" | 301.77 Bbl
+
| style="text-align: right;" | 0.001
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 0.00146
| 34-013-20609
+
| style="text-align: right;" | 1104.26
 
|-
 
|-
| 2015-M07
+
| Sorbitan monooleate
| Produced Fluid (in Barrels)
+
| 1338-43-8
| style="text-align: right;" | 736.77 Bbl
+
| style="text-align: right;" | 0.05
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0.00302
|  
+
| style="text-align: right;" | 2293.02
 
|-
 
|-
| 2015-M08
+
| Sodium chloride
| Produced Fluid (in Barrels)
+
| 7647-14-5
| style="text-align: right;" | 682.33 Bbl
+
| style="text-align: right;" | 0.001
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0.00005000
|  
+
| style="text-align: right;" | 36.8087
 
|-
 
|-
| 2015-M09
+
| Propargyl Alcohol
| Produced Fluid (in Barrels)
+
| 107-19-7
| style="text-align: right;" | 693.81 Bbl
+
| style="text-align: right;" | 0.001
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0.00049
|  
+
| style="text-align: right;" | 368.087
 
|-
 
|-
| 2015-M10
+
| Isopropanol
| Produced Fluid (in Barrels)
+
| 67-63-0
| style="text-align: right;" | 585.27 Bbl
+
| style="text-align: right;" | 0.4
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0.01188
|  
+
| style="text-align: right;" | 9010.2
 
|-
 
|-
| 2015-M11
+
| Polyethylene glycol mixture
| Produced Fluid (in Barrels)
+
| 25322-68-3
| style="text-align: right;" | 600.23 Bbl
+
| style="text-align: right;" | 0.7
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0.01299
|  
+
| style="text-align: right;" | 9850.37
 
|-
 
|-
| 2015-M12
+
| Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether
| Produced Fluid (in Barrels)
+
| 37251-67-5
| style="text-align: right;" | 561.26 Bbl
+
| style="text-align: right;" | 0.015
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 0.659277
 
|-
 
|-
| 2015-S01
+
| Goethite
| Produced Fluid (in Barrels)
+
| 1310-14-1
| style="text-align: right;" | 856.95 Bbl
+
| style="text-align: right;" | 0.001
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 0.00634
| 34-013-20609
+
| style="text-align: right;" | 4809.27
 
|-
 
|-
| 2015-S01
+
| Hydrochloric acid
| Produced Fluid (in Barrels)
+
| 7647-01-0
| style="text-align: right;" | 104.13 Bbl
+
| style="text-align: right;" | 0.35
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 0.3398
| 34-059-24202
+
| style="text-align: right;" | 257661
 
|-
 
|-
| 2015-S01
+
| 2-Propenoic acid, polymer with sodium phosphonate
| Produced Fluid (in Barrels)
+
| 71050-62-9
| style="text-align: right;" | 1,069.38 Bbl
+
| style="text-align: right;" | 0.6
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 0.00658
| 34-157-25511
+
| style="text-align: right;" | 4991.31
 
|-
 
|-
| 2015-S01
+
| Biotite
| Produced Fluid (in Barrels)
+
| 1302-27-8
| style="text-align: right;" | 4,084.64 Bbl
+
| style="text-align: right;" | 0.001
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0.00464
|  
+
| style="text-align: right;" | 3517.69
 
|-
 
|-
| 2016-M01
+
| Diallyldimethylammonium chloride
| Produced Fluid (in Barrels) RWC 802
+
| 7398-69-8
| style="text-align: right;" | 646.35 Bbl
+
| style="text-align: right;" | 0.05
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0.00149
|  
+
| style="text-align: right;" | 1126.28
 
|-
 
|-
| 2016-M02
+
| Dimethylcocoamine, bis(chloroethyl)<br/> ether, diquaternary ammonium salt
| Produced Fluid (in Barrels) RWC 802
+
| 68607-28-3
| style="text-align: right;" | 411.90 Bbl
+
| style="text-align: right;" | 0.4
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0.01188
|  
+
| style="text-align: right;" | 9010.2
 
|-
 
|-
| 2016-M03
+
| Methanol
| Produced Fluid (in Barrels) RWC 802
+
| 67-56-1
| style="text-align: right;" | 526.16 Bbl
+
| style="text-align: right;" | 0.15
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0.00737
|  
+
| style="text-align: right;" | 5587.35
 
|-
 
|-
| 2016-M04
+
|}
| Produced Fluid (in Barrels) RWC 802
+
For data sources see<ref>{{cite web
| style="text-align: right;" | 544.08 Bbl
+
| title =FracFocus Fracking Chemicals Database
| REUSE OTHER THAN ROAD SPREADING
+
| date = 2019-04-02
|  
+
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 
|-
 
|-
| 2016-M05
+
| 2013
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 441.09 Bbl
+
| style="text-align: right;" | 0.00
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0
|  
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2016-M06
+
| 2014
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 217.62 Bbl
+
| style="text-align: right;" | 796,876.63
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 196
| 34-013-20609
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2016-M06
+
| 2015
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 208.28 Bbl
+
| style="text-align: right;" | 865,047.41
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 365
|  
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2016-M07
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 92.00 Bbl
+
| style="text-align: right;" | 588,704.89
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 366
| 34-119-28803
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2016-M07
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 426.00 Bbl
+
| style="text-align: right;" | 457,838.40
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 365
|  
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2016-M08
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 462.00 Bbl
+
| style="text-align: right;" | 386,046.46
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 365
|  
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2016-M09
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[CNX GAS CO LLC]]
| style="text-align: right;" | 362.00 Bbl
+
| style="text-align: right;" | 87,414.73
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 90
|  
+
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
| 2016-M10
+
|}
| Produced Fluid (in Barrels) RWC 802
+
For data sources see<ref>{{cite web
| style="text-align: right;" | 260.00 Bbl
+
| title =Oil and Gas Production Reports
| INJECTION DISPOSAL WELL
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
| 34-013-20609
+
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2016-M10
+
| 2013-S02
| Produced Fluid (in Barrels) RWC 802
+
| Drill Cuttings (in Tons)
| style="text-align: right;" | 118.00 Bbl
+
| style="text-align: right;" | 93.63 Tons
| REUSE OTHER THAN ROAD SPREADING
+
| RESIDUAL WASTE TRANSFER FACILITY
|  
+
| 301071
 +
|-
 +
| 2013-S02
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 577.06 Bbl
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 301071
 +
|-
 +
| 2014-S01
 +
| Drill Cuttings (in Tons)
 +
| style="text-align: right;" | 291.42 Tons
 +
| LANDFILL
 +
| 301071
 +
|-
 +
| 2014-S01
 +
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 458.89 Bbl
 +
| LANDFILL
 +
| 301071
 
|-
 
|-
| 2016-M11
+
| 2014-S01
| Produced Fluid (in Barrels) RWC 802
+
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 475.00 Bbl
+
| style="text-align: right;" | 9,652.09 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2016-M12
+
| 2014-S02
| Produced Fluid (in Barrels) RWC 802
+
| Drilling Fluid Waste (in Barrels)
| style="text-align: right;" | 364.00 Bbl
+
| style="text-align: right;" | 458.89 Bbl
 +
| RESIDUAL WASTE TRANSFER FACILITY
 +
| 301071
 +
|-
 +
| 2014-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 178.48 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-013-20609
 +
|-
 +
| 2014-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 391.99 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-119-28776
 +
|-
 +
| 2014-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 120.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-133-20525
 +
|-
 +
| 2014-S02
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 21,691.11 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2017-M01
+
| 2015-M07
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid (in Barrels)
| style="text-align: right;" | 104.00 Bbl
+
| style="text-align: right;" | 301.77 Bbl
| SURFACE IMPOUNDMENT
+
| INJECTION DISPOSAL WELL
| 95-7-37312-10
+
| 34-013-20609
 
|-
 
|-
| 2017-M01
+
| 2015-M07
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid (in Barrels)
| style="text-align: right;" | 249.00 Bbl
+
| style="text-align: right;" | 736.77 Bbl
| SURFACE IMPOUNDMENT
+
| REUSE OTHER THAN ROAD SPREADING
| 95-7-37312-32
+
|  
 
|-
 
|-
| 2017-M02
+
| 2015-M08
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid (in Barrels)
| style="text-align: right;" | 102.00 Bbl
+
| style="text-align: right;" | 682.33 Bbl
| REUSE (AT WELL PAD)
+
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2017-M02
+
| 2015-M09
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid (in Barrels)
| style="text-align: right;" | 232.00 Bbl
+
| style="text-align: right;" | 693.81 Bbl
| SURFACE IMPOUNDMENT
+
| REUSE OTHER THAN ROAD SPREADING
| 95-7-37312-19
+
|  
 
|-
 
|-
| 2017-M02
+
| 2015-M10
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid (in Barrels)
| style="text-align: right;" | 112.00 Bbl
+
| style="text-align: right;" | 585.27 Bbl
| SURFACE IMPOUNDMENT
+
| REUSE OTHER THAN ROAD SPREADING
| 95-7-37312-21
+
|  
 
|-
 
|-
| 2017-M03
+
| 2015-M11
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid (in Barrels)
| style="text-align: right;" | 117.00 Bbl
+
| style="text-align: right;" | 600.23 Bbl
| INJECTION DISPOSAL WELL
+
| REUSE OTHER THAN ROAD SPREADING
| 34-119-28803
+
|  
 
|-
 
|-
| 2017-M03
+
| 2015-M12
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid (in Barrels)
| style="text-align: right;" | 99.00 Bbl
+
| style="text-align: right;" | 561.26 Bbl
| REUSE (AT WELL PAD)
+
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2017-M03
+
| 2015-S01
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid (in Barrels)
| style="text-align: right;" | 118.00 Bbl
+
| style="text-align: right;" | 856.95 Bbl
| SURFACE IMPOUNDMENT
+
| INJECTION DISPOSAL WELL
| 95-7-37312-17
+
| 34-013-20609
 
|-
 
|-
| 2017-M04
+
| 2015-S01
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid (in Barrels)
| style="text-align: right;" | 234.00 Bbl
+
| style="text-align: right;" | 104.13 Bbl
| SURFACE IMPOUNDMENT
+
| INJECTION DISPOSAL WELL
| 95-7-37312-10
+
| 34-059-24202
 
|-
 
|-
| 2017-M04
+
| 2015-S01
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid (in Barrels)
| style="text-align: right;" | 123.00 Bbl
+
| style="text-align: right;" | 1,069.38 Bbl
| SURFACE IMPOUNDMENT
+
| INJECTION DISPOSAL WELL
| 95-7-37312-16
+
| 34-157-25511
 +
|-
 +
| 2015-S01
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 4,084.64 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 
|-
 
|-
| 2017-M05
+
| 2016-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 350.00 Bbl
+
| style="text-align: right;" | 646.35 Bbl
| SURFACE IMPOUNDMENT
+
| REUSE OTHER THAN ROAD SPREADING
| 95-7-37312-10
+
|  
 
|-
 
|-
| 2017-M06
+
| 2016-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 246.00 Bbl
+
| style="text-align: right;" | 411.90 Bbl
| SURFACE IMPOUNDMENT
+
| REUSE OTHER THAN ROAD SPREADING
| 95-7-37312-10
+
|  
 
|-
 
|-
| 2017-M06
+
| 2016-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 121.00 Bbl
+
| style="text-align: right;" | 526.16 Bbl
| SURFACE IMPOUNDMENT
+
| REUSE OTHER THAN ROAD SPREADING
| 95-7-37312-21
+
|  
 
|-
 
|-
| 2017-M07
+
| 2016-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 116.00 Bbl
+
| style="text-align: right;" | 544.08 Bbl
| INJECTION DISPOSAL WELL
+
| REUSE OTHER THAN ROAD SPREADING
| 34-013-20609
+
|  
 
|-
 
|-
| 2017-M07
+
| 2016-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 241.00 Bbl
+
| style="text-align: right;" | 441.09 Bbl
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
+
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2017-M08
+
| 2016-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 119.00 Bbl
+
| style="text-align: right;" | 217.62 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-013-20609
 
| 34-013-20609
 
|-
 
|-
| 2017-M08
+
| 2016-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 108.00 Bbl
+
| style="text-align: right;" | 208.28 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016-M07
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 92.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-119-28803
 
| 34-119-28803
 
|-
 
|-
| 2017-M08
+
| 2016-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 116.00 Bbl
+
| style="text-align: right;" | 426.00 Bbl
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
+
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2017-M09
+
| 2016-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 228.06 Bbl
+
| style="text-align: right;" | 462.00 Bbl
| INJECTION DISPOSAL WELL
+
| REUSE OTHER THAN ROAD SPREADING
| 34-119-28803
+
|  
 
|-
 
|-
| 2017-M10
+
| 2016-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 342.43 Bbl
+
| style="text-align: right;" | 362.00 Bbl
| INJECTION DISPOSAL WELL
+
| REUSE OTHER THAN ROAD SPREADING
| 34-119-28803
+
|  
 
|-
 
|-
| 2017-M11
+
| 2016-M10
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 32.25 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-119-28803
 
|-
 
| 2017-M11
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 121.66 Bbl
+
| style="text-align: right;" | 260.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-119-28803
+
| 34-013-20609
 
|-
 
|-
| 2017-M11
+
| 2016-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 110.00 Bbl
+
| style="text-align: right;" | 118.00 Bbl
| REUSE (AT WELL PAD)
+
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2017-M12
+
| 2016-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 332.39 Bbl
+
| style="text-align: right;" | 475.00 Bbl
| INJECTION DISPOSAL WELL
+
| REUSE OTHER THAN ROAD SPREADING
| 34-119-28803
+
|  
 
|-
 
|-
| 2018-M01
+
| 2016-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 678.00 Bbl
+
| style="text-align: right;" | 364.00 Bbl
| INJECTION DISPOSAL WELL
+
| REUSE OTHER THAN ROAD SPREADING
| 34-119-28803
 
|-
 
| 2018-M02
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 20.00 Bbl
 
| REUSE (AT WELL PAD)
 
 
|  
 
|  
 
|-
 
|-
| 2018-M02
+
| 2017-M01
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 73.33 Bbl
+
| style="text-align: right;" | 104.00 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
| 95-7-37312-19
+
| 95-7-37312-10
 
|-
 
|-
| 2018-M02
+
| 2017-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 78.33 Bbl
+
| style="text-align: right;" | 249.00 Bbl
| INJECTION DISPOSAL WELL
+
| SURFACE IMPOUNDMENT
| 34-119-28803
+
| 95-7-37312-32
 
|-
 
|-
| 2018-M02
+
| 2017-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 90.67 Bbl
+
| style="text-align: right;" | 102.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M03
+
| 2017-M02
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 36.67 Bbl
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
|-
 
| 2018-M03
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 195.10 Bbl
+
| style="text-align: right;" | 232.00 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2018-M03
+
| 2017-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 39.78 Bbl
+
| style="text-align: right;" | 112.00 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-21
 
| 95-7-37312-21
 
|-
 
|-
| 2018-M04
+
| 2017-M03
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 20.00 Bbl
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
|-
 
| 2018-M04
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 34.24 Bbl
+
| style="text-align: right;" | 117.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-119-28803
 
| 34-119-28803
 
|-
 
|-
| 2018-M04
+
| 2017-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 79.19 Bbl
+
| style="text-align: right;" | 99.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M04
+
| 2017-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 77.00 Bbl
+
| style="text-align: right;" | 118.00 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-17
 
| 95-7-37312-17
 
|-
 
|-
| 2018-M04
+
| 2017-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 39.78 Bbl
+
| style="text-align: right;" | 234.00 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
| 95-7-37312-19
+
| 95-7-37312-10
 
|-
 
|-
| 2018-M05
+
| 2017-M04
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 65.83 Bbl
+
| style="text-align: right;" | 123.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| SURFACE IMPOUNDMENT
|  
+
| 95-7-37312-16
 
|-
 
|-
| 2018-M05
+
| 2017-M05
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 158.83 Bbl
+
| style="text-align: right;" | 350.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| SURFACE IMPOUNDMENT
| ODNR 2015-29
+
| 95-7-37312-10
 
|-
 
|-
| 2018-M05
+
| 2017-M06
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 16.67 Bbl
+
| style="text-align: right;" | 246.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| SURFACE IMPOUNDMENT
| ORDER 2016-29
+
| 95-7-37312-10
 
|-
 
|-
| 2018-M05
+
| 2017-M06
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 57.50 Bbl
+
| style="text-align: right;" | 121.00 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
| 95-7-37312-19
+
| 95-7-37312-21
 
|-
 
|-
| 2018-M05
+
| 2017-M07
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 10.00 Bbl
+
| style="text-align: right;" | 116.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| INJECTION DISPOSAL WELL
| 2014-184
+
| 34-013-20609
 
|-
 
|-
| 2018-M05
+
| 2017-M07
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 14.16 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-119-28780
 
|-
 
| 2018-M05
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 18.33 Bbl
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
|-
 
| 2018-M05
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 15.33 Bbl
+
| style="text-align: right;" | 241.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|  
 
|  
 
|-
 
|-
| 2018-M05
+
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 20.28 Bbl
+
| style="text-align: right;" | 119.00 Bbl
| REUSE (AT WELL PAD)
+
| INJECTION DISPOSAL WELL
|  
+
| 34-013-20609
 
|-
 
|-
| 2018-M05
+
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 131.00 Bbl
+
| style="text-align: right;" | 108.00 Bbl
| SURFACE IMPOUNDMENT
+
| INJECTION DISPOSAL WELL
| 95-7-37312-19
+
| 34-119-28803
 
|-
 
|-
| 2018-M06
+
| 2017-M08
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 13.33 Bbl
+
| style="text-align: right;" | 116.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|  
 
|  
 
|-
 
|-
| 2018-M06
+
| 2017-M09
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 494.17 Bbl
+
| style="text-align: right;" | 228.06 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| INJECTION DISPOSAL WELL
| ODNR 2015-29
+
| 34-119-28803
 
|-
 
|-
| 2018-M06
+
| 2017-M10
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 33.33 Bbl
+
| style="text-align: right;" | 342.43 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| INJECTION DISPOSAL WELL
| ORDER 2016-29
+
| 34-119-28803
 
|-
 
|-
| 2018-M06
+
| 2017-M11
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 16.67 Bbl
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-21
 
|-
 
| 2018-M06
 
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 55.00 Bbl
+
| style="text-align: right;" | 32.25 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| INJECTION DISPOSAL WELL
| ODNR 2015-29
+
| 34-119-28803
 
|-
 
|-
| 2018-M06
+
| 2017-M11
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 8.33 Bbl
+
| style="text-align: right;" | 121.66 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| INJECTION DISPOSAL WELL
| ORDER 2016-29
+
| 34-119-28803
 
|-
 
|-
| 2018-M06
+
| 2017-M11
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 222.50 Bbl
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
|-
 
| 2018-M06
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 50.00 Bbl
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-21
 
|-
 
| 2018-M06
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 16.67 Bbl
+
| style="text-align: right;" | 110.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M06
+
| 2017-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 57.50 Bbl
+
| style="text-align: right;" | 332.39 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| INJECTION DISPOSAL WELL
| ODNR 2015-29
+
| 34-119-28803
 
|-
 
|-
| 2018-M06
+
| 2018-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 138.33 Bbl
+
| style="text-align: right;" | 678.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-119-28803
 +
|-
 +
| 2018-M02
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 20.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M06
+
| 2018-M02
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 135.27 Bbl
+
| style="text-align: right;" | 73.33 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2018-M07
+
| 2018-M02
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 68.33 Bbl
+
| style="text-align: right;" | 78.33 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| INJECTION DISPOSAL WELL
 +
| 34-119-28803
 +
|-
 +
| 2018-M02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 90.67 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M07
+
| 2018-M03
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 226.17 Bbl
+
| style="text-align: right;" | 36.67 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| SURFACE IMPOUNDMENT
| ODNR 2015-29
+
| 95-7-37312-19
 
|-
 
|-
| 2018-M07
+
| 2018-M03
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 17.50 Bbl
+
| style="text-align: right;" | 195.10 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| SURFACE IMPOUNDMENT
| ORDER 2016-29
+
| 95-7-37312-19
 
|-
 
|-
| 2018-M07
+
| 2018-M03
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 18.67 Bbl
+
| style="text-align: right;" | 39.78 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
| 95-7-37312-17
+
| 95-7-37312-21
 
|-
 
|-
| 2018-M07
+
| 2018-M04
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 10.83 Bbl
+
| style="text-align: right;" | 20.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-19
 +
|-
 +
| 2018-M04
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 34.24 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-119-28803
 +
|-
 +
| 2018-M04
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 79.19 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M07
+
| 2018-M04
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 53.67 Bbl
+
| style="text-align: right;" | 77.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| SURFACE IMPOUNDMENT
| ODNR 2015-29
+
| 95-7-37312-17
 
|-
 
|-
| 2018-M07
+
| 2018-M04
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 22.50 Bbl
+
| style="text-align: right;" | 39.78 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2018-M07
+
| 2018-M05
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 18.33 Bbl
+
| style="text-align: right;" | 65.83 Bbl
| SURFACE IMPOUNDMENT
+
| RESIDUAL WASTE PROCESSING FACILITY
| 95-7-37312-21
+
|  
 
|-
 
|-
| 2018-M07
+
| 2018-M05
| Produced Fluid (in Barrels) RWC 802
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 35.00 Bbl
+
| style="text-align: right;" | 158.83 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2018-M07
+
| 2018-M05
| Produced Fluid (in Barrels) RWC 802
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 36.46 Bbl
+
| style="text-align: right;" | 16.67 Bbl
| REUSE (AT WELL PAD)
+
| RESIDUAL WASTE PROCESSING FACILITY
|  
+
| ORDER 2016-29
 
|-
 
|-
| 2018-M07
+
| 2018-M05
| Produced Fluid (in Barrels) RWC 802
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 56.00 Bbl
+
| style="text-align: right;" | 57.50 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
| 95-7-37312-17
+
| 95-7-37312-19
 +
|-
 +
| 2018-M05
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 10.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 2014-184
 +
|-
 +
| 2018-M05
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 14.16 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-119-28780
 
|-
 
|-
| 2018-M07
+
| 2018-M05
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 78.93 Bbl
+
| style="text-align: right;" | 18.33 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2018-M07
+
| 2018-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 21.65 Bbl
+
| style="text-align: right;" | 15.33 Bbl
| SURFACE IMPOUNDMENT
+
| RESIDUAL WASTE PROCESSING FACILITY
| 95-7-37312-21
+
|  
 
|-
 
|-
| 2018-M07
+
| 2018-M05
| Synthetic Liner Materials (in Tons) RWC 806
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 2.26 Tons
+
| style="text-align: right;" | 20.28 Bbl
| LANDFILL
+
| REUSE (AT WELL PAD)
| 100280
+
|  
 
|-
 
|-
| 2018-M07
+
| 2018-M05
| Synthetic Liner Materials (in Tons) RWC 806
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 0.98 Tons
+
| style="text-align: right;" | 131.00 Bbl
| LANDFILL
+
| SURFACE IMPOUNDMENT
| 100663
+
| 95-7-37312-19
 
|-
 
|-
| 2018-M08
+
| 2018-M06
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 25.32 Bbl
+
| style="text-align: right;" | 13.33 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| RESIDUAL WASTE PROCESSING FACILITY
| ORDER 2016-415
+
|  
 
|-
 
|-
| 2018-M08
+
| 2018-M06
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 272.50 Bbl
+
| style="text-align: right;" | 494.17 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
|  
+
| ODNR 2015-29
 
|-
 
|-
| 2018-M08
+
| 2018-M06
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 248.17 Bbl
+
| style="text-align: right;" | 33.33 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| ODNR 2015-29
+
| ORDER 2016-29
 
|-
 
|-
| 2018-M08
+
| 2018-M06
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 20.00 Bbl
+
| style="text-align: right;" | 16.67 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
| 95-7-37312-19
+
| 95-7-37312-21
 
|-
 
|-
| 2018-M08
+
| 2018-M06
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 75.33 Bbl
+
| style="text-align: right;" | 55.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2018-M08
+
| 2018-M06
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 13.33 Bbl
+
| style="text-align: right;" | 8.33 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ORDER 2016-29
 
| ORDER 2016-29
 
|-
 
|-
| 2018-M08
+
| 2018-M06
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 5.00 Bbl
+
| style="text-align: right;" | 222.50 Bbl
| REUSE (AT WELL PAD)
+
| SURFACE IMPOUNDMENT
|  
+
| 95-7-37312-19
 +
|-
 +
| 2018-M06
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 50.00 Bbl
 +
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-21
 
|-
 
|-
| 2018-M08
+
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 9.17 Bbl
+
| style="text-align: right;" | 16.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2018-M08
+
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 1.67 Bbl
+
| style="text-align: right;" | 57.50 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2018-M08
+
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 30.33 Bbl
+
| style="text-align: right;" | 138.33 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M08
+
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 40.17 Bbl
+
| style="text-align: right;" | 135.27 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2018-M09
+
| 2018-M07
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 79.29 Bbl
+
| style="text-align: right;" | 68.33 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 2014-184
 
|-
 
| 2018-M09
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 15.71 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| ORDER 2016-415
 
|-
 
| 2018-M09
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 415.00 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2018-M09
+
| 2018-M07
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 32.86 Bbl
+
| style="text-align: right;" | 226.17 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2018-M09
+
| 2018-M07
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 37.14 Bbl
+
| style="text-align: right;" | 17.50 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ORDER 2016-29
 
| ORDER 2016-29
 
|-
 
|-
| 2018-M09
+
| 2018-M07
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 53.57 Bbl
+
| style="text-align: right;" | 18.67 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
| 95-7-37312-19
+
| 95-7-37312-17
 
|-
 
|-
| 2018-M09
+
| 2018-M07
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 125.29 Bbl
+
| style="text-align: right;" | 10.83 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2018-M09
+
| 2018-M07
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 31.43 Bbl
+
| style="text-align: right;" | 53.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2018-M09
+
| 2018-M07
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 203.14 Bbl
+
| style="text-align: right;" | 22.50 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2018-M09
+
| 2018-M07
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 73.14 Bbl
+
| style="text-align: right;" | 18.33 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-21
 
| 95-7-37312-21
 
|-
 
|-
| 2018-M09
+
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 83.97 Bbl
+
| style="text-align: right;" | 35.00 Bbl
| SURFACE IMPOUNDMENT
+
| RESIDUAL WASTE PROCESSING FACILITY
| 95-7-37312-19
+
| ODNR 2015-29
 
|-
 
|-
| 2018-M10
+
| 2018-M07
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 14.29 Bbl
+
| style="text-align: right;" | 36.46 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| REUSE (AT WELL PAD)
| 2014-184
 
|-
 
| 2018-M10
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 190.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
 
|  
 
|  
 
|-
 
|-
| 2018-M10
+
| 2018-M07
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 69.29 Bbl
+
| style="text-align: right;" | 56.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| SURFACE IMPOUNDMENT
| ODNR 2015-29
+
| 95-7-37312-17
 
|-
 
|-
| 2018-M10
+
| 2018-M07
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 56.43 Bbl
+
| style="text-align: right;" | 78.93 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| SURFACE IMPOUNDMENT
| ORDER 2016-29
+
| 95-7-37312-19
 
|-
 
|-
| 2018-M10
+
| 2018-M07
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 78.57 Bbl
+
| style="text-align: right;" | 21.65 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| SURFACE IMPOUNDMENT
|  
+
| 95-7-37312-21
 
|-
 
|-
| 2018-M10
+
| 2018-M07
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Synthetic Liner Materials (in Tons) RWC 806
| style="text-align: right;" | 53.43 Bbl
+
| style="text-align: right;" | 2.26 Tons
| RESIDUAL WASTE PROCESSING FACILITY
+
| LANDFILL
| ODNR 2015-29
+
| 100280
 
|-
 
|-
| 2018-M10
+
| 2018-M07
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Synthetic Liner Materials (in Tons) RWC 806
| style="text-align: right;" | 37.14 Bbl
+
| style="text-align: right;" | 0.98 Tons
| RESIDUAL WASTE PROCESSING FACILITY
+
| LANDFILL
| ORDER 2016-29
+
| 100663
 +
|-
 +
| 2018-M08
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 25.32 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| ORDER 2016-415
 
|-
 
|-
| 2018-M10
+
| 2018-M08
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 1.43 Bbl
+
| style="text-align: right;" | 272.50 Bbl
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
+
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2018-M10
+
| 2018-M08
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 39.14 Bbl
+
| style="text-align: right;" | 248.17 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ODNR 2015-29
 +
|-
 +
| 2018-M08
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 20.00 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2018-M10
+
| 2018-M08
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 31.43 Bbl
+
| style="text-align: right;" | 75.33 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ODNR 2015-29
 +
|-
 +
| 2018-M08
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 13.33 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ORDER 2016-29
 +
|-
 +
| 2018-M08
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 5.00 Bbl
 +
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M10
+
| 2018-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 87.19 Bbl
+
| style="text-align: right;" | 9.17 Bbl
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
|-
 
| 2018-M11
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 240.71 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2018-M11
+
| 2018-M08
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 8.57 Bbl
+
| style="text-align: right;" | 1.67 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2018-M11
+
| 2018-M08
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 27.14 Bbl
+
| style="text-align: right;" | 30.33 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| REUSE (AT WELL PAD)
| ORDER 2016-29
+
|  
 
|-
 
|-
| 2018-M11
+
| 2018-M08
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 36.71 Bbl
+
| style="text-align: right;" | 40.17 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2018-M11
+
| 2018-M09
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 65.00 Bbl
+
| style="text-align: right;" | 79.29 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
|  
+
| 2014-184
 
|-
 
|-
| 2018-M11
+
| 2018-M09
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 4.29 Bbl
+
| style="text-align: right;" | 15.71 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| ORDER 2016-415
 +
|-
 +
| 2018-M09
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 415.00 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
|
 +
|-
 +
| 2018-M09
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 32.86 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2018-M11
+
| 2018-M09
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 11.43 Bbl
+
| style="text-align: right;" | 37.14 Bbl
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
+
| RESIDUAL WASTE PROCESSING FACILITY
|  
+
| ORDER 2016-29
 
|-
 
|-
| 2018-M11
+
| 2018-M09
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 8.57 Bbl
+
| style="text-align: right;" | 53.57 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2018-M11
+
| 2018-M09
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 12.14 Bbl
+
| style="text-align: right;" | 125.29 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 2014-184
 
|-
 
| 2018-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 60.57 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2018-M11
+
| 2018-M09
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 58.86 Bbl
+
| style="text-align: right;" | 31.43 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2018-M11
+
| 2018-M09
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 53.57 Bbl
+
| style="text-align: right;" | 203.14 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2018-M12
+
| 2018-M09
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 73.14 Bbl
 +
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-21
 +
|-
 +
| 2018-M09
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 83.97 Bbl
 +
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-19
 +
|-
 +
| 2018-M10
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 14.29 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| 2014-184
 +
|-
 +
| 2018-M10
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 95.71 Bbl
+
| style="text-align: right;" | 190.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2018-M12
+
| 2018-M10
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 27.14 Bbl
+
| style="text-align: right;" | 69.29 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| ORDER 2016-29
+
| ODNR 2015-29
 
|-
 
|-
| 2018-M12
+
| 2018-M10
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 56.43 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ORDER 2016-29
 +
|-
 +
| 2018-M10
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 74.29 Bbl
+
| style="text-align: right;" | 78.57 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2018-M12
+
| 2018-M10
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 9.29 Bbl
+
| style="text-align: right;" | 53.43 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2018-M12
+
| 2018-M10
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 12.86 Bbl
+
| style="text-align: right;" | 37.14 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ORDER 2016-29
 
| ORDER 2016-29
 
|-
 
|-
| 2018-M12
+
| 2018-M10
 +
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 1.43 Bbl
 +
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 +
|
 +
|-
 +
| 2018-M10
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 63.57 Bbl
+
| style="text-align: right;" | 39.14 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2018-M12
+
| 2018-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 0.71 Bbl
+
| style="text-align: right;" | 31.43 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2018-M12
+
| 2018-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 69.51 Bbl
+
| style="text-align: right;" | 87.19 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2019-M01
+
| 2018-M11
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 76.71 Bbl
+
| style="text-align: right;" | 240.71 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2019-M01
+
| 2018-M11
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 7.86 Bbl
+
| style="text-align: right;" | 8.57 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2019-M01
+
| 2018-M11
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 64.29 Bbl
+
| style="text-align: right;" | 27.14 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ORDER 2016-29
 
| ORDER 2016-29
 
|-
 
|-
| 2019-M01
+
| 2018-M11
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 36.71 Bbl
 +
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-19
 +
|-
 +
| 2018-M11
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 92.86 Bbl
+
| style="text-align: right;" | 65.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2019-M01
+
| 2018-M11
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 22.14 Bbl
+
| style="text-align: right;" | 4.29 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2019-M01
+
| 2018-M11
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 49.57 Bbl
+
| style="text-align: right;" | 11.43 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
 
| ORDER 2016-29
 
|-
 
| 2019-M01
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 28.57 Bbl
 
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|  
 
|  
 
|-
 
|-
| 2019-M01
+
| 2018-M11
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 5.00 Bbl
+
| style="text-align: right;" | 8.57 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2019-M01
+
| 2018-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 17.14 Bbl
+
| style="text-align: right;" | 12.14 Bbl
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
|  
+
| 2014-184
 
|-
 
|-
| 2019-M01
+
| 2018-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 127.14 Bbl
+
| style="text-align: right;" | 60.57 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
|
 +
|-
 +
| 2018-M11
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 58.86 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ODNR 2015-29
 +
|-
 +
| 2018-M11
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 53.57 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
 
| 95-7-37312-19
 
| 95-7-37312-19
 
|-
 
|-
| 2019-M01
+
| 2018-M12
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 1.55 Tons
+
| style="text-align: right;" | 95.71 Bbl
| LANDFILL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 100280
+
|  
 
|-
 
|-
| 2019-M01
+
| 2018-M12
| Synthetic Liner Materials (in Tons) RWC 806
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 0.82 Tons
+
| style="text-align: right;" | 27.14 Bbl
| LANDFILL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 100280
+
| ORDER 2016-29
 
|-
 
|-
| 2019-M01
+
| 2018-M12
| Synthetic Liner Materials (in Tons) RWC 806
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 6.56 Tons
+
| style="text-align: right;" | 74.29 Bbl
| LANDFILL
 
| 100663
 
|-
 
| 2019-M02
 
| Drilling Fluid Waste (in Barrels) RWC 803
 
| style="text-align: right;" | 87.71 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2019-M02
+
| 2018-M12
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 11.43 Bbl
+
| style="text-align: right;" | 9.29 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2019-M02
+
| 2018-M12
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 73.14 Bbl
+
| style="text-align: right;" | 12.86 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ORDER 2016-29
 
| ORDER 2016-29
 
|-
 
|-
| 2019-M02
+
| 2018-M12
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 122.86 Bbl
+
| style="text-align: right;" | 63.57 Bbl
 +
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-19
 +
|-
 +
| 2018-M12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 0.71 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123SW005
+
|  
 
|-
 
|-
| 2019-M02
+
| 2018-M12
| Drilling Fluid Waste (in Tons) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 26.32 Tons
+
| style="text-align: right;" | 69.51 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| SURFACE IMPOUNDMENT
| ORDER 2016-29
+
| 95-7-37312-19
 
|-
 
|-
| 2019-M02
+
| 2019-M01
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 0.71 Bbl
+
| style="text-align: right;" | 76.71 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2019-M02
+
| 2019-M01
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 212.86 Bbl
+
| style="text-align: right;" | 7.86 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ODNR 2015-29
 +
|-
 +
| 2019-M01
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 64.29 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123SW005
+
| ORDER 2016-29
 
|-
 
|-
| 2019-M02
+
| 2019-M01
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 14.29 Bbl
+
| style="text-align: right;" | 92.86 Bbl
| REUSE (AT WELL PAD)
+
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2019-M02
+
| 2019-M01
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 17.86 Bbl
+
| style="text-align: right;" | 22.14 Bbl
| SURFACE IMPOUNDMENT
 
| 95-7-37312-17
 
|-
 
| 2019-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 102.86 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|
 
|-
 
| 2019-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 14.29 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| ODNR 2015-29
 
| ODNR 2015-29
 
|-
 
|-
| 2019-M02
+
| 2019-M01
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 118.86 Bbl
+
| style="text-align: right;" | 49.57 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123SW005
+
| ORDER 2016-29
 
|-
 
|-
| 2019-M02
+
| 2019-M01
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 32.14 Bbl
+
| style="text-align: right;" | 28.57 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
| WMGR123SW019
 
|-
 
| 2019-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 15.71 Bbl
 
| REUSE (AT WELL PAD)
 
 
|  
 
|  
 
|-
 
|-
| 2019-M02
+
| 2019-M01
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 15.71 Bbl
+
| style="text-align: right;" | 5.00 Bbl
 
| SURFACE IMPOUNDMENT
 
| SURFACE IMPOUNDMENT
| 95-7-37312-17
+
| 95-7-37312-19
 
|-
 
|-
| 2019-M02
+
| 2019-M01
| Produced Fluid (in Tons) RWC 802
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 2.68 Tons
+
| style="text-align: right;" | 17.14 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
| ORDER 2016-29
+
|  
 
|-
 
|-
| 2019-M03
+
| 2019-M01
| Drilling Fluid Waste (in Barrels) RWC 803
+
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 27.86 Bbl
+
| style="text-align: right;" | 127.14 Bbl
| REUSE (AT WELL PAD)
+
| SURFACE IMPOUNDMENT
|  
+
| 95-7-37312-19
 
|-
 
|-
| 2019-M03
+
| 2019-M01
| Filter Socks (in Tons) RWC 812
+
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
| style="text-align: right;" | 1.42 Tons
+
| style="text-align: right;" | 1.55 Tons
| RESIDUAL WASTE PROCESSING FACILITY
+
| LANDFILL
| 2014-541
+
| 100280
 +
|-
 +
| 2019-M01
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 0.82 Tons
 +
| LANDFILL
 +
| 100280
 +
|-
 +
| 2019-M01
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 6.56 Tons
 +
| LANDFILL
 +
| 100663
 
|-
 
|-
| 2019-M03
+
| 2019-M02
| Other Oil & Gas Wastes (in Barrels) RWC 899
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 32.14 Bbl
+
| style="text-align: right;" | 87.71 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
|  
 
|  
 
|-
 
|-
| 2019-M03
+
| 2019-M02
| Produced Fluid (in Barrels) RWC 802
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 37.14 Bbl
+
| style="text-align: right;" | 11.43 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| ODNR 2015-29
 +
|-
 +
| 2019-M02
 +
| Drilling Fluid Waste (in Barrels) RWC 803
 +
| style="text-align: right;" | 73.14 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
|  
+
| ORDER 2016-29
 
|-
 
|-
| 2019-M03
+
| 2019-M02
| Produced Fluid (in Barrels) RWC 802
+
| Drilling Fluid Waste (in Barrels) RWC 803
| style="text-align: right;" | 33.20 Bbl
+
| style="text-align: right;" | 122.86 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2019-M03
+
| 2019-M02
| Produced Fluid (in Barrels) RWC 802
+
| Drilling Fluid Waste (in Tons) RWC 803
| style="text-align: right;" | 97.71 Bbl
+
| style="text-align: right;" | 26.32 Tons
| REUSE (AT WELL PAD)
+
| RESIDUAL WASTE PROCESSING FACILITY
|  
+
| ORDER 2016-29
 
|-
 
|-
| 2019-M03
+
| 2019-M02
| Produced Fluid (in Barrels) RWC 802
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 59.03 Bbl
+
| style="text-align: right;" | 0.71 Bbl
| SURFACE IMPOUNDMENT
+
| RESIDUAL WASTE PROCESSING FACILITY
| 95-7-37312-19
+
|  
 
|-
 
|-
| 2019-M03
+
| 2019-M02
| Produced Fluid (in Tons) RWC 802
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 6.34 Tons
+
| style="text-align: right;" | 212.86 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| 2014-541
+
| WMGR123SW005
 
|-
 
|-
| 2019-M03
+
| 2019-M02
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 0.84 Tons
+
| style="text-align: right;" | 14.29 Bbl
| LANDFILL
+
| REUSE (AT WELL PAD)
| CID: 29084
+
|  
 
|-
 
|-
|}
+
| 2019-M02
For data sources see<ref>{{cite web
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| title =Oil and Gas Waste Reports
+
| style="text-align: right;" | 17.86 Bbl
|publisher = [[Pennsylvania Department of Environmental Protection]]
+
| SURFACE IMPOUNDMENT
| date = 2019-03-31
+
| 95-7-37312-17
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Inspection Category
 
!scope="col" | Inspection Date
 
!scope="col" | Inspection Type
 
!scope="col" | Inspection Result
 
!scope="col" | Inspection Comments
 
 
|-
 
|-
| 2122310
+
| 2019-M02
| Primary Facility
+
| Produced Fluid (in Barrels) RWC 802
| 12/10/2012
+
| style="text-align: right;" | 102.86 Bbl
| Routine/Complete Inspection
+
| RESIDUAL WASTE PROCESSING FACILITY
| No Violations Noted
+
|  
| At the time of inspection the Operator was in the process of building the site and installing underground production pipelines.  The Erosion and Sedimentation plan was on site.  The BMP's appear to be properly installed and functioning properly.  No accelerated erosion or sedimentation observed in relation to the well pad or access road.  The Department notes that  the two pits located on site appear to be excavated, however the pits are not lined.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 
 
|-
 
|-
| 2189931
+
| 2019-M02
| Primary Facility
+
| Produced Fluid (in Barrels) RWC 802
| 08/06/2013
+
| style="text-align: right;" | 14.29 Bbl
| Routine/Complete Inspection
+
| RESIDUAL WASTE PROCESSING FACILITY
| No Violations Noted
+
| ODNR 2015-29
| Preoperational inspection in response to the SPUD notice received by the Department on 8/2/2013.  At the time of inspection the Operator was in the process of setting the conductor.  The Erosion and Sedimentation plan was on site.  The BMP's appear to be properly installed and functioning properly.  No accelerated erosion or sedimentation observed in relation to the well pad or access road.  The Department notes that  the pit located on site appear to be lined and in sound condition.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 
 
|-
 
|-
| 2194998
+
| 2019-M02
| Primary Facility
+
| Produced Fluid (in Barrels) RWC 802
| 08/06/2013
+
| style="text-align: right;" | 118.86 Bbl
| Drilling/Alteration
+
| RESIDUAL WASTE PROCESSING FACILITY
| No Violations Noted
+
| WMGR123SW005
| Well not spud in at time of inspection.
 
 
|-
 
|-
| 2203569
+
| 2019-M02
| Primary Facility
+
| Produced Fluid (in Barrels) RWC 802
| 09/10/2013
+
| style="text-align: right;" | 32.14 Bbl
| Drilling/Alteration
+
| RESIDUAL WASTE PROCESSING FACILITY
| No Violations Noted
+
| WMGR123SW019
| Waiting on rig to commence tophole drilling.
 
 
|-
 
|-
| 2209067
+
| 2019-M02
| Primary Facility
+
| Produced Fluid (in Barrels) RWC 802
| 10/02/2013
+
| style="text-align: right;" | 15.71 Bbl
| Routine/Complete Inspection
+
| REUSE (AT WELL PAD)
| No Violations Noted
+
|  
| At the time of inspection the drill rig was on site and placed on containment.  The Operator indicated that the well was actively being drilled.  The Erosion and Sedimentation plan was on site.  The BMP's appear to be properly installed and functioning properly.  No accelerated erosion or sedimentation observed in relation to the well pad or access road.  The Department notes that  the pit located on site appear to be lined and in sound condition.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 
 
|-
 
|-
| 2211092
+
| 2019-M02
| Primary Facility
+
| Produced Fluid (in Barrels) RWC 802
| 10/01/2013
+
| style="text-align: right;" | 15.71 Bbl
| Drilling/Alteration
+
| SURFACE IMPOUNDMENT
| No Violations Noted
+
| 95-7-37312-17
| Falcon rig#28 Schramm 200 running 9 5/8” casing at time of inspection.  Pit lined and freeboard maintained.
 
 
|-
 
|-
| 2212678
+
| 2019-M02
| Primary Facility
+
| Produced Fluid (in Tons) RWC 802
| 10/15/2013
+
| style="text-align: right;" | 2.68 Tons
| Drilling/Alteration
+
| RESIDUAL WASTE PROCESSING FACILITY
| No Violations Noted
+
| ORDER 2016-29
| Waiting on rig to commence lateral drilling.
 
 
|-
 
|-
| 2259116
+
| 2019-M03
| Primary Facility
+
| Drilling Fluid Waste (in Barrels) RWC 803
| 03/28/2014
+
| style="text-align: right;" | 27.86 Bbl
| Drilling/Alteration
+
| REUSE (AT WELL PAD)
| No Violations Noted
+
|  
| Waiting on frac.
 
 
|-
 
|-
| 2268220
+
| 2019-M03
| Primary Facility
+
| Filter Socks (in Tons) RWC 812
| 04/02/2014
+
| style="text-align: right;" | 1.42 Tons
| Routine/Complete Inspection
+
| RESIDUAL WASTE PROCESSING FACILITY
| No Violations Noted
+
| 2014-541
| At the time of inspection the drill rig was on site and placed on containment.  The Operator indicated that the well was drilled to TD  The Erosion and Sedimentation plan was on site.  The BMP's appear to be properly installed and functioning properly.  No accelerated erosion or sedimentation observed in relation to the well pad or access road.  The Department notes that  the impoundment located on site appear to be lined and in sound condition.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 
 
|-
 
|-
| 2268222
+
| 2019-M03
| Primary Facility
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
| 05/05/2014
+
| style="text-align: right;" | 32.14 Bbl
| Routine/Complete Inspection
+
| RESIDUAL WASTE PROCESSING FACILITY
| No Violations Noted
+
|  
| At the time of inspection the well was drilled to TD  The Erosion and Sedimentation plan was on site.  The BMP's appear to be properly installed and functioning properly.  No accelerated erosion or sedimentation observed in relation to the well pad or access road.  The Department notes that  the impoundment located on site appear to be lined and in sound condition.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 
 
|-
 
|-
| 2278212
+
| 2019-M03
| Primary Facility
+
| Produced Fluid (in Barrels) RWC 802
| 06/11/2014
+
| style="text-align: right;" | 37.14 Bbl
| Incident- Response to Accident or Event
+
| RESIDUAL WASTE PROCESSING FACILITY
| Violation(s) Noted
+
|  
| Inspection the result of a spill reported to the Department by the Operator.  At 00:45 on 6/11/2014 the Operator reported an unknown amount of friction reducer spill to the ground via a rain fall event and hole in the containment.  At the time of inspection the Operator removed the matting boards in the area of the hole and observed a small amount of friction reduced present.  The Operator is in compliance with the most current spill policy at this time.  The Department suggests the Operator remove the area of containment where the friction reducer is located and continue to follow the friction reducer to ensure the initial spill has been contained and then take remediation steps to remove the impacted material. All disposal manifest should be forwarded to the Department upon completion of remediation efforts as well as any results from samples taken to ensure remediation levels have been reached.
 
 
|-
 
|-
| 2325512
+
| 2019-M03
| Primary Facility
+
| Produced Fluid (in Barrels) RWC 802
| 12/01/2014
+
| style="text-align: right;" | 33.20 Bbl
| Compliance Evaluation
+
| RESIDUAL WASTE PROCESSING FACILITY
| No Violations Noted
+
| WMGR123SW005
| Compliance Inspection the result of a spill reported to the Department by the Operator at 00:45 on 6/11/2014.  The Operator reported an unknown amount of friction reducer spill to the ground via a rain fall event and hole in the containment.  The Department received the 15 day response letter and the MSDS information associated with the material spilled.  At the time of inspection the wells appeared to drilled, stimulated and equipped for production.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 
 
|-
 
|-
| 2361189
+
| 2019-M03
| Primary Facility
+
| Produced Fluid (in Barrels) RWC 802
| 04/09/2015
+
| style="text-align: right;" | 97.71 Bbl
| Routine/Complete Inspection
+
| REUSE (AT WELL PAD)
| No Violations Noted
+
|  
| Well operating and properly identified.
 
 
|-
 
|-
| 2393147
+
| 2019-M03
| Primary Facility
+
| Produced Fluid (in Barrels) RWC 802
| 07/27/2015
+
| style="text-align: right;" | 59.03 Bbl
| Routine/Complete Inspection
+
| SURFACE IMPOUNDMENT
| No Violations Noted
+
| 95-7-37312-19
| At the time of inspection the well appears to be in production. The site appears to be restored. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 
 
|-
 
|-
| 2426916
+
| 2019-M03
| Primary Facility
+
| Produced Fluid (in Tons) RWC 802
| 11/18/2015
+
| style="text-align: right;" | 6.34 Tons
| Routine/Complete Inspection
+
| RESIDUAL WASTE PROCESSING FACILITY
| No Violations Noted
+
| 2014-541
| At the time of inspection the well appears to be in production. The site appears to be restored. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 
 
|-
 
|-
| 2476255
+
| 2019-M03
| Primary Facility
+
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
| 2016-04-19
+
| style="text-align: right;" | 0.84 Tons
 +
| LANDFILL
 +
| CID: 29084
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2122310
 +
| Primary Facility
 +
| 2012-12-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Well tagged-in production. Well head casing-production unit equipment-tank battery-dike look ok.
+
| At the time of inspection the Operator was in the process of building the site and installing underground production pipelines. The Erosion and Sedimentation plan was on site.  The BMP's appear to be properly installed and functioning properly.  No accelerated erosion or sedimentation observed in relation to the well pad or access road.  The Department notes that  the two pits located on site appear to be excavated, however the pits are not lined.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 
|-
 
|-
| 2507899
+
| 2189931
 
| Primary Facility
 
| Primary Facility
| 2016-08-04
+
| 2013-08-06
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. Site stable, no E& S issues in relation to site and/or access road.
+
| Preoperational inspection in response to the SPUD notice received by the Department on 8/2/2013.  At the time of inspection the Operator was in the process of setting the conductor.  The Erosion and Sedimentation plan was on site. The BMP's appear to be properly installed and functioning properly.  No accelerated erosion or sedimentation observed in relation to the well pad or access road. The Department notes that  the pit located on site appear to be lined and in sound condition. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 
|-
 
|-
| 2515921
+
| 2194998
 
| Primary Facility
 
| Primary Facility
| 2016-09-01
+
| 2013-08-06
| Routine/Complete Inspection
+
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. Site stable, no E& S issues in relation to site and/or access road.
+
| Well not spud in at time of inspection.
 
|-
 
|-
| 2516264
+
| 2203569
 
| Primary Facility
 
| Primary Facility
| 2016-09-01
+
| 2013-09-10
| Routine/Complete Inspection
+
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| Well tagged-in production-well head casing-production set equipment-tank battery/containment ok.
+
| Waiting on rig to commence tophole drilling.
 
|-
 
|-
| 2569463
+
| 2209067
 
| Primary Facility
 
| Primary Facility
| 2017-03-06
+
| 2013-10-02
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
+
| At the time of inspection the drill rig was on site and placed on containment.  The Operator indicated that the well was actively being drilled.  The Erosion and Sedimentation plan was on site.  The BMP's appear to be properly installed and functioning properly.  No accelerated erosion or sedimentation observed in relation to the well pad or access road. The Department notes that  the pit located on site appear to be lined and in sound condition.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 
|-
 
|-
| 2686057
+
| 2211092
 
| Primary Facility
 
| Primary Facility
| 2018-01-24
+
| 2013-10-01
| Routine/Complete Inspection
+
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. No E&S issues.
+
| Falcon rig#28 Schramm 200 running 9 5/8” casing at time of inspection. Pit lined and freeboard maintained.
ESCGP active.
 
 
|-
 
|-
| 2720524
+
| 2212678
 +
| Primary Facility
 +
| 2013-10-15
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| Waiting on rig to commence lateral drilling.
 +
|-
 +
| 2259116
 
| Primary Facility
 
| Primary Facility
| 2018-04-19
+
| 2014-03-28
| Routine/Complete Inspection
+
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. No E&S issues.
+
| Waiting on frac.
 
|-
 
|-
| 2766435
+
| 2268220
 
| Primary Facility
 
| Primary Facility
| 2018-08-23
+
| 2014-04-02
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Well appears to be in good operating condition.
+
| At the time of inspection the drill rig was on site and placed on containment.  The Operator indicated that the well was drilled to TD  The Erosion and Sedimentation plan was on site.  The BMP's appear to be properly installed and functioning properly.  No accelerated erosion or sedimentation observed in relation to the well pad or access road.  The Department notes that  the impoundment located on site appear to be lined and in sound condition.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 
|-
 
|-
| 2771574
+
| 2268222
 
| Primary Facility
 
| Primary Facility
| 2018-09-06
+
| 2014-05-05
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. At the time of inspection, drilling activity associated with utica well on shared well pad site ongoing. No E&S issues.
+
| At the time of inspection the well was drilled to TD  The Erosion and Sedimentation plan was on site. The BMP's appear to be properly installed and functioning properly. No accelerated erosion or sedimentation observed in relation to the well pad or access road.  The Department notes that  the impoundment located on site appear to be lined and in sound condition. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
 
|-
 
|-
| 2838311
+
| 2278212
 
| Primary Facility
 
| Primary Facility
| 2019-02-02
+
| 2014-06-11
 
| Incident- Response to Accident or Event
 
| Incident- Response to Accident or Event
| Pending
+
| Violation(s) Noted
| Oversight of well
+
| Inspection the result of a spill reported to the Department by the Operator.  At 00:45 on 6/11/2014 the Operator reported an unknown amount of friction reducer spill to the ground via a rain fall event and hole in the containment.  At the time of inspection the Operator removed the matting boards in the area of the hole and observed a small amount of friction reduced present.  The Operator is in compliance with the most current spill policy at this time.  The Department suggests the Operator remove the area of containment where the friction reducer is located and continue to follow the friction reducer to ensure the initial spill has been contained and then take remediation steps to remove the impacted material. All disposal manifest should be forwarded to the Department upon completion of remediation efforts as well as any results from samples taken to ensure remediation levels have been reached.
 
|-
 
|-
| 2844219
+
| 2325512
 +
| Primary Facility
 +
| 2014-12-01
 +
| Compliance Evaluation
 +
| No Violations Noted
 +
| Compliance Inspection the result of a spill reported to the Department by the Operator at 00:45 on 6/11/2014.  The Operator reported an unknown amount of friction reducer spill to the ground via a rain fall event and hole in the containment.  The Department received the 15 day response letter and the MSDS information associated with the material spilled.  At the time of inspection the wells appeared to drilled, stimulated and equipped for production.  The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
 +
|-
 +
| 2361189
 
| Primary Facility
 
| Primary Facility
| 2019-02-21
+
| 2015-04-09
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
| Operator rep on site during inspection.
+
| Well operating and properly identified.
According to operator rep, well is shut in.
 
Liner is installed on pad. This liner appears structurally sound. Three brine tanks on site. Roll off boxes on site.
 
 
|-
 
|-
|}
+
| 2393147
==== Violations Commited ====
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2015-07-27
!scope="col" | Inspection ID
+
| Routine/Complete Inspection
!scope="col" | Violation ID
+
| No Violations Noted
!scope="col" | Violation Date
+
| At the time of inspection the well appears to be in production. The site appears to be restored. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
!scope="col" | Date Resolved
 
!scope="col" | Violation Code
 
!scope="col" | Violation Type
 
!scope="col" | Violation Comments
 
 
|-
 
|-
| 2278212
+
| 2426916
| 698101
+
| Primary Facility
| 06/11/2014
+
| 2015-11-18
| 12/01/2014
+
| Routine/Complete Inspection
| 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth.
+
| No Violations Noted
| Environmental Health & Safety
+
| At the time of inspection the well appears to be in production. The site appears to be restored. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
|
 
 
|-
 
|-
|}
+
| 2476255
==== Penalties Applied ====
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2016-04-19
!scope="col" | Violation ID
+
| Routine/Complete Inspection
!scope="col" | Penalty ID
+
| No Violations Noted
!scope="col" | Penalty Code
+
| Well tagged-in production. Well head casing-production unit equipment-tank battery-dike look ok.
!scope="col" | Penalty Status
 
!scope="col" | Penalty Date
 
!scope="col" | Enforcement Date
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
 
|-
 
|-
| 698101
+
| 2507899
| 312100
+
| Primary Facility
| NOV - Notice of Violation
+
| 2016-08-04
| Comply/Closed
+
| Routine/Complete Inspection
|  
+
| No Violations Noted
| 12/01/2014
+
| At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. Site stable, no E& S issues in relation to site and/or access road.
| style="text-align: right;" |  
+
|-
| style="text-align: right;" |  
+
| 2515921
 +
| Primary Facility
 +
| 2016-09-01
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. Site stable, no E& S issues in relation to site and/or access road.
 
|-
 
|-
|}
+
| 2516264
For data sources see<ref>{{cite web
+
| Primary Facility
| title =Oil and Gas Compliance Report
+
| 2016-09-01
|publisher = [[Pennsylvania Department of Environmental Protection]]
+
| Routine/Complete Inspection
| date = 2019-05-20
+
| No Violations Noted
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
+
| Well tagged-in production-well head casing-production set equipment-tank battery/containment ok.
| accessdate = 2019-05-21 }}</ref>
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
 
|-
 
|-
| 1
+
| 2569463
| 05/14/2014
+
| Primary Facility
| 05/30/2014
+
| 2017-03-06
| style="text-align: right;" | 7798
+
| Routine/Complete Inspection
| style="text-align: right;" | 7,922,670.0
+
| No Violations Noted
| style="text-align: right;" | 0
+
| Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
 
|-
 
|-
|}
+
| 2686057
==== Fluid Composition Data ====
+
| Primary Facility
{| class="wikitable sortable" width="95%"
+
| 2018-01-24
!scope="col" | Job Number
+
| Routine/Complete Inspection
!scope="col" | Trade Name
+
| No Violations Noted
!scope="col" | Supplier
+
| At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. No E&S issues.
!scope="col" | Purpose
+
ESCGP active.
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
 
|-
 
|-
|- valign="top"
+
| 2720524
| rowspan="31"| 1
+
| Primary Facility
| rowspan="1"| Water
+
| 2018-04-19
| rowspan="1"| Customer & CWS
+
| Routine/Complete Inspection
| rowspan="1"| Base Fluid & Mix Water
+
| No Violations Noted
| Water
+
| At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. No E&S issues.
| 7732-18-5
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 87.1599
 
| style="text-align: right;" | 66,091,600.0
 
 
|-
 
|-
|- valign="top"
+
| 2766435
| rowspan="30"| Sand (Proppant), DAP-903, DWP-111, DWP-614, BioClear 2000, DWP-NE1, Spearhead Acid, Acetic Acid
+
| Primary Facility
| rowspan="30"| CWS
+
| 2018-08-23
| rowspan="30"| Propping Agent, Scale Inhibitor, Gel Slurry, Viscosifier, Biocide, Non-Emulsifier, Clean Perforations, Acid
+
| Routine/Complete Inspection
| 2,2-Dibromo-3-Nitrilopropionamide
+
| No Violations Noted
| 10222-01-2
+
| Well appears to be in good operating condition.
| style="text-align: right;" | 0.2
 
| style="text-align: right;" | 0.01299
 
| style="text-align: right;" | 9850.37
 
 
|-
 
|-
| Fatty acids, tall-oil
+
| 2771574
| 61790-12-3
+
| Primary Facility
| style="text-align: right;" | 0.001
+
| 2018-09-06
| style="text-align: right;" | 0.00146
+
| Routine/Complete Inspection
| style="text-align: right;" | 1104.26
+
| No Violations Noted
 +
| At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. At the time of inspection, drilling activity associated with utica well on shared well pad site ongoing. No E&S issues.
 
|-
 
|-
| Illite
+
| 2838311
| 12173-60-3
+
| Primary Facility
| style="text-align: right;" | 0.01
+
| 2019-02-02
| style="text-align: right;" | 0.01023
+
| Incident- Response to Accident or Event
| style="text-align: right;" | 7754.13
+
| Pending
 +
| Oversight of well
 
|-
 
|-
| Formaldehyde
+
| 2844219
| 50-00-0
+
| Primary Facility
| style="text-align: right;" | 0.001
+
| 2019-02-21
| style="text-align: right;" | 0.0001
+
| Routine/Complete Inspection
| style="text-align: right;" | 73.6173
+
| No Violations Noted
 +
| Operator rep on site during inspection.  
 +
According to operator rep, well is shut in.  
 +
Liner is installed on pad. This liner appears structurally sound. Three brine tanks on site. Roll off boxes on site.
 
|-
 
|-
| Guar gum
+
|}
| 9000-30-0
+
==== Violations Commited ====
| style="text-align: right;" | 0.6
+
{| class="wikitable sortable" width="95%"
| style="text-align: right;" | 0.00003000
+
!scope="col" | Inspection ID
| style="text-align: right;" | 26.3711
+
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 
|-
 
|-
| Calcite
+
| 2278212
| 471-34-1
+
| 698101
| style="text-align: right;" | 0.01
+
| 06/11/2014
| style="text-align: right;" | 0.01788
+
| 2014-06-11
| style="text-align: right;" | 13561.6
+
| 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth.
 +
| Environmental Health & Safety
 +
|  
 
|-
 
|-
| Alcohols, C14-15, ethoxylated
+
|}
| 68951-67-7
+
==== Penalties Applied ====
| style="text-align: right;" | 0.001
+
{| class="wikitable sortable" width="95%"
| style="text-align: right;" | 0.00146
+
!scope="col" | Violation ID
| style="text-align: right;" | 1104.26
+
!scope="col" | Penalty ID
|-
+
!scope="col" | Penalty Code
| Quaternary ammonium compounds, bis(hydrogenated tallow alkyl)dimethyl, salts with bentonite
+
!scope="col" | Penalty Status
| 68953-58-2
+
!scope="col" | Penalty Date
| style="text-align: right;" | 0.05
+
!scope="col" | Enforcement Date
| style="text-align: right;" | 0
+
!scope="col" | Penalty Amount
| style="text-align: right;" | 2.19759
+
!scope="col" | Amount Collected
 
|-
 
|-
| Poly(oxyethylene)nonylphenol ether
+
| 698101
| 9016-45-9
+
| 312100
| style="text-align: right;" | 0.05
+
| NOV - Notice of Violation
| style="text-align: right;" | 0.00302
+
| Comply/Closed
| style="text-align: right;" | 2293.02
+
|  
|-
+
| 2014-12-01
| Alkenes, C>10 a-
+
| style="text-align: right;" |  
| 64743-02-8
+
| style="text-align: right;" |  
| style="text-align: right;" | 0.001
 
| style="text-align: right;" | 0.00146
 
| style="text-align: right;" | 1104.26
 
|-
 
| Acetic acid
 
| 64-19-7
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 0.08706
 
| style="text-align: right;" | 66013.9
 
|-
 
| Distillates (petroleum), hydrotreated middle
 
| 64742-46-7
 
| style="text-align: right;" | 0.6
 
| style="text-align: right;" | 0.01818
 
| style="text-align: right;" | 13784.5
 
|-
 
| Apatite
 
| 64476-38-6
 
| style="text-align: right;" | 0.001
 
| style="text-align: right;" | 0.00464
 
| style="text-align: right;" | 3517.69
 
|-
 
| 2-Propenoic acid, polymer with 2-propenamide, sodium salt
 
| 25987-30-8
 
| style="text-align: right;" | 0.4
 
| style="text-align: right;" | 0.02419
 
| style="text-align: right;" | 18344.2
 
|-
 
| Ilmenite
 
| 98072-94-7
 
| style="text-align: right;" | 0.001
 
| style="text-align: right;" | 0.00379
 
| style="text-align: right;" | 2871.9
 
|-
 
| Crystalline silica (Quartz)
 
| 14808-60-7
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 12.2456
 
| style="text-align: right;" | 9,285,580.0
 
|-
 
| Modified thiourea polymer
 
| 68527-49-1
 
| style="text-align: right;" | 0.001
 
| style="text-align: right;" | 0.00146
 
| style="text-align: right;" | 1104.26
 
|-
 
| Sorbitan monooleate
 
| 1338-43-8
 
| style="text-align: right;" | 0.05
 
| style="text-align: right;" | 0.00302
 
| style="text-align: right;" | 2293.02
 
|-
 
| Sodium chloride
 
| 7647-14-5
 
| style="text-align: right;" | 0.001
 
| style="text-align: right;" | 0.00005000
 
| style="text-align: right;" | 36.8087
 
|-
 
| Propargyl Alcohol
 
| 107-19-7
 
| style="text-align: right;" | 0.001
 
| style="text-align: right;" | 0.00049
 
| style="text-align: right;" | 368.087
 
|-
 
| Isopropanol
 
| 67-63-0
 
| style="text-align: right;" | 0.4
 
| style="text-align: right;" | 0.01188
 
| style="text-align: right;" | 9010.2
 
|-
 
| Polyethylene glycol mixture
 
| 25322-68-3
 
| style="text-align: right;" | 0.7
 
| style="text-align: right;" | 0.01299
 
| style="text-align: right;" | 9850.37
 
|-
 
| Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether
 
| 37251-67-5
 
| style="text-align: right;" | 0.015
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.659277
 
|-
 
| Goethite
 
| 1310-14-1
 
| style="text-align: right;" | 0.001
 
| style="text-align: right;" | 0.00634
 
| style="text-align: right;" | 4809.27
 
|-
 
| Hydrochloric acid
 
| 7647-01-0
 
| style="text-align: right;" | 0.35
 
| style="text-align: right;" | 0.3398
 
| style="text-align: right;" | 257661
 
|-
 
| 2-Propenoic acid, polymer with sodium phosphonate
 
| 71050-62-9
 
| style="text-align: right;" | 0.6
 
| style="text-align: right;" | 0.00658
 
| style="text-align: right;" | 4991.31
 
|-
 
| Biotite
 
| 1302-27-8
 
| style="text-align: right;" | 0.001
 
| style="text-align: right;" | 0.00464
 
| style="text-align: right;" | 3517.69
 
|-
 
| Diallyldimethylammonium chloride
 
| 7398-69-8
 
| style="text-align: right;" | 0.05
 
| style="text-align: right;" | 0.00149
 
| style="text-align: right;" | 1126.28
 
|-
 
| Dimethylcocoamine, bis(chloroethyl) ether, diquaternary ammonium salt
 
| 68607-28-3
 
| style="text-align: right;" | 0.4
 
| style="text-align: right;" | 0.01188
 
| style="text-align: right;" | 9010.2
 
|-
 
| Methanol
 
| 67-56-1
 
| style="text-align: right;" | 0.15
 
| style="text-align: right;" | 0.00737
 
| style="text-align: right;" | 5587.35
 
 
|-
 
|-
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
  | title =FracFocus Fracking Chemicals Database
+
  | title =Oil and Gas Compliance Report
| date = 2019-04-02
+
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
  | accessdate = 2019-06-19 }}</ref>
+
  | accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>

Revision as of 13:34, 1 August 2019

Well Details

Well ID: 37-129-28821
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Washington Township
Operator Name: CNX GAS CO LLC
Well Pad ID: 147584
Farm/Lease Name: SHAW 1A
License Status: Active
Spud Date: 2013-08-05
Permit Date: 2012-09-20
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.503997
Longitude: -79.573208

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-05-14 2014-05-30 7798 7,922,670.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Customer & CWS Base Fluid & Mix Water Water 7732-18-5 1 87.1599 66,091,600.0
Sand (Proppant), DAP-903, DWP-111,
DWP-614, BioClear 2000,
DWP-NE1, Spearhead Acid, Acetic Acid
CWS Propping Agent, Scale Inhibitor, Gel Slurry, Viscosifier, Biocide, Non-Emulsifier, Clean Perforations, Acid 2,2-Dibromo-3-Nitrilopropionamide 10222-01-2 0.2 0.01299 9850.37
Fatty acids, tall-oil 61790-12-3 0.001 0.00146 1104.26
Illite 12173-60-3 0.01 0.01023 7754.13
Formaldehyde 50-00-0 0.001 0.0001 73.6173
Guar gum 9000-30-0 0.6 0.00003000 26.3711
Calcite 471-34-1 0.01 0.01788 13561.6
Alcohols, C14-15, ethoxylated 68951-67-7 0.001 0.00146 1104.26
Quaternary ammonium compounds,
bis(hydrogenated tallow alkyl)dimethyl,
salts with bentonite
68953-58-2 0.05 0 2.19759
Poly(oxyethylene)nonylphenol ether 9016-45-9 0.05 0.00302 2293.02
Alkenes, C>10 a- 64743-02-8 0.001 0.00146 1104.26
Acetic acid 64-19-7 1 0.08706 66013.9
Distillates (petroleum), hydrotreated middle 64742-46-7 0.6 0.01818 13784.5
Apatite 64476-38-6 0.001 0.00464 3517.69
2-Propenoic acid, polymer with 2-propenamide, sodium salt 25987-30-8 0.4 0.02419 18344.2
Ilmenite 98072-94-7 0.001 0.00379 2871.9
Crystalline silica (Quartz) 14808-60-7 1 12.2456 9,285,580.0
Modified thiourea polymer 68527-49-1 0.001 0.00146 1104.26
Sorbitan monooleate 1338-43-8 0.05 0.00302 2293.02
Sodium chloride 7647-14-5 0.001 0.00005000 36.8087
Propargyl Alcohol 107-19-7 0.001 0.00049 368.087
Isopropanol 67-63-0 0.4 0.01188 9010.2
Polyethylene glycol mixture 25322-68-3 0.7 0.01299 9850.37
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether 37251-67-5 0.015 0 0.659277
Goethite 1310-14-1 0.001 0.00634 4809.27
Hydrochloric acid 7647-01-0 0.35 0.3398 257661
2-Propenoic acid, polymer with sodium phosphonate 71050-62-9 0.6 0.00658 4991.31
Biotite 1302-27-8 0.001 0.00464 3517.69
Diallyldimethylammonium chloride 7398-69-8 0.05 0.00149 1126.28
Dimethylcocoamine, bis(chloroethyl)
ether, diquaternary ammonium salt
68607-28-3 0.4 0.01188 9010.2
Methanol 67-56-1 0.15 0.00737 5587.35

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2013 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2014 CNX GAS CO LLC 796,876.63 196 0.00 0 0.00 0
2015 CNX GAS CO LLC 865,047.41 365 0.00 0 0.00 0
2016 CNX GAS CO LLC 588,704.89 366 0.00 0 0.00 0
2017 CNX GAS CO LLC 457,838.40 365 0.00 0 0.00 0
2018 CNX GAS CO LLC 386,046.46 365 0.00 0 0.00 0
2019 CNX GAS CO LLC 87,414.73 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2013-S02 Drill Cuttings (in Tons) 93.63 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2013-S02 Drilling Fluid Waste (in Barrels) 577.06 Bbl RESIDUAL WASTE TRANSFER FACILITY 301071
2014-S01 Drill Cuttings (in Tons) 291.42 Tons LANDFILL 301071
2014-S01 Drilling Fluid Waste (in Barrels) 458.89 Bbl LANDFILL 301071
2014-S01 Fracing Fluid Waste (in Barrels) 9,652.09 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Drilling Fluid Waste (in Barrels) 458.89 Bbl RESIDUAL WASTE TRANSFER FACILITY 301071
2014-S02 Produced Fluid (in Barrels) 178.48 Bbl INJECTION DISPOSAL WELL 34-013-20609
2014-S02 Produced Fluid (in Barrels) 391.99 Bbl INJECTION DISPOSAL WELL 34-119-28776
2014-S02 Produced Fluid (in Barrels) 120.00 Bbl INJECTION DISPOSAL WELL 34-133-20525
2014-S02 Produced Fluid (in Barrels) 21,691.11 Bbl REUSE OTHER THAN ROAD SPREADING
2015-M07 Produced Fluid (in Barrels) 301.77 Bbl INJECTION DISPOSAL WELL 34-013-20609
2015-M07 Produced Fluid (in Barrels) 736.77 Bbl REUSE OTHER THAN ROAD SPREADING
2015-M08 Produced Fluid (in Barrels) 682.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015-M09 Produced Fluid (in Barrels) 693.81 Bbl REUSE OTHER THAN ROAD SPREADING
2015-M10 Produced Fluid (in Barrels) 585.27 Bbl REUSE OTHER THAN ROAD SPREADING
2015-M11 Produced Fluid (in Barrels) 600.23 Bbl REUSE OTHER THAN ROAD SPREADING
2015-M12 Produced Fluid (in Barrels) 561.26 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 856.95 Bbl INJECTION DISPOSAL WELL 34-013-20609
2015-S01 Produced Fluid (in Barrels) 104.13 Bbl INJECTION DISPOSAL WELL 34-059-24202
2015-S01 Produced Fluid (in Barrels) 1,069.38 Bbl INJECTION DISPOSAL WELL 34-157-25511
2015-S01 Produced Fluid (in Barrels) 4,084.64 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M01 Produced Fluid (in Barrels) RWC 802 646.35 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M02 Produced Fluid (in Barrels) RWC 802 411.90 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M03 Produced Fluid (in Barrels) RWC 802 526.16 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M04 Produced Fluid (in Barrels) RWC 802 544.08 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M05 Produced Fluid (in Barrels) RWC 802 441.09 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M06 Produced Fluid (in Barrels) RWC 802 217.62 Bbl INJECTION DISPOSAL WELL 34-013-20609
2016-M06 Produced Fluid (in Barrels) RWC 802 208.28 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M07 Produced Fluid (in Barrels) RWC 802 92.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2016-M07 Produced Fluid (in Barrels) RWC 802 426.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M08 Produced Fluid (in Barrels) RWC 802 462.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M09 Produced Fluid (in Barrels) RWC 802 362.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M10 Produced Fluid (in Barrels) RWC 802 260.00 Bbl INJECTION DISPOSAL WELL 34-013-20609
2016-M10 Produced Fluid (in Barrels) RWC 802 118.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M11 Produced Fluid (in Barrels) RWC 802 475.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M12 Produced Fluid (in Barrels) RWC 802 364.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017-M01 Produced Fluid (in Barrels) RWC 802 104.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2017-M01 Produced Fluid (in Barrels) RWC 802 249.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-32
2017-M02 Produced Fluid (in Barrels) RWC 802 102.00 Bbl REUSE (AT WELL PAD)
2017-M02 Produced Fluid (in Barrels) RWC 802 232.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2017-M02 Produced Fluid (in Barrels) RWC 802 112.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2017-M03 Produced Fluid (in Barrels) RWC 802 117.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017-M03 Produced Fluid (in Barrels) RWC 802 99.00 Bbl REUSE (AT WELL PAD)
2017-M03 Produced Fluid (in Barrels) RWC 802 118.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2017-M04 Produced Fluid (in Barrels) RWC 802 234.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2017-M04 Produced Fluid (in Barrels) RWC 802 123.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-16
2017-M05 Produced Fluid (in Barrels) RWC 802 350.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2017-M06 Produced Fluid (in Barrels) RWC 802 246.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-10
2017-M06 Produced Fluid (in Barrels) RWC 802 121.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2017-M07 Produced Fluid (in Barrels) RWC 802 116.00 Bbl INJECTION DISPOSAL WELL 34-013-20609
2017-M07 Produced Fluid (in Barrels) RWC 802 241.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017-M08 Produced Fluid (in Barrels) RWC 802 119.00 Bbl INJECTION DISPOSAL WELL 34-013-20609
2017-M08 Produced Fluid (in Barrels) RWC 802 108.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017-M08 Produced Fluid (in Barrels) RWC 802 116.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017-M09 Produced Fluid (in Barrels) RWC 802 228.06 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017-M10 Produced Fluid (in Barrels) RWC 802 342.43 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 32.25 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017-M11 Produced Fluid (in Barrels) RWC 802 121.66 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017-M11 Produced Fluid (in Barrels) RWC 802 110.00 Bbl REUSE (AT WELL PAD)
2017-M12 Produced Fluid (in Barrels) RWC 802 332.39 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018-M01 Produced Fluid (in Barrels) RWC 802 678.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 20.00 Bbl REUSE (AT WELL PAD)
2018-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 73.33 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M02 Produced Fluid (in Barrels) RWC 802 78.33 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018-M02 Produced Fluid (in Barrels) RWC 802 90.67 Bbl REUSE (AT WELL PAD)
2018-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 36.67 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M03 Produced Fluid (in Barrels) RWC 802 195.10 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M03 Produced Fluid (in Barrels) RWC 802 39.78 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018-M04 Other Oil & Gas Wastes (in Barrels) RWC 899 20.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M04 Produced Fluid (in Barrels) RWC 802 34.24 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018-M04 Produced Fluid (in Barrels) RWC 802 79.19 Bbl REUSE (AT WELL PAD)
2018-M04 Produced Fluid (in Barrels) RWC 802 77.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018-M04 Produced Fluid (in Barrels) RWC 802 39.78 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M05 Drilling Fluid Waste (in Barrels) RWC 803 65.83 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M05 Drilling Fluid Waste (in Barrels) RWC 803 158.83 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M05 Drilling Fluid Waste (in Barrels) RWC 803 16.67 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018-M05 Drilling Fluid Waste (in Barrels) RWC 803 57.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 10.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 2014-184
2018-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 14.16 Bbl INJECTION DISPOSAL WELL 34-119-28780
2018-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 18.33 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M05 Produced Fluid (in Barrels) RWC 802 15.33 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M05 Produced Fluid (in Barrels) RWC 802 20.28 Bbl REUSE (AT WELL PAD)
2018-M05 Produced Fluid (in Barrels) RWC 802 131.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M06 Drilling Fluid Waste (in Barrels) RWC 803 13.33 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M06 Drilling Fluid Waste (in Barrels) RWC 803 494.17 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M06 Drilling Fluid Waste (in Barrels) RWC 803 33.33 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018-M06 Drilling Fluid Waste (in Barrels) RWC 803 16.67 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018-M06 Other Oil & Gas Wastes (in Barrels) RWC 899 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M06 Other Oil & Gas Wastes (in Barrels) RWC 899 8.33 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018-M06 Other Oil & Gas Wastes (in Barrels) RWC 899 222.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M06 Other Oil & Gas Wastes (in Barrels) RWC 899 50.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018-M06 Produced Fluid (in Barrels) RWC 802 16.67 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M06 Produced Fluid (in Barrels) RWC 802 57.50 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M06 Produced Fluid (in Barrels) RWC 802 138.33 Bbl REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 135.27 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M07 Drilling Fluid Waste (in Barrels) RWC 803 68.33 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M07 Drilling Fluid Waste (in Barrels) RWC 803 226.17 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M07 Drilling Fluid Waste (in Barrels) RWC 803 17.50 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018-M07 Drilling Fluid Waste (in Barrels) RWC 803 18.67 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 10.83 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 53.67 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 22.50 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 18.33 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018-M07 Produced Fluid (in Barrels) RWC 802 35.00 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M07 Produced Fluid (in Barrels) RWC 802 36.46 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 56.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2018-M07 Produced Fluid (in Barrels) RWC 802 78.93 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M07 Produced Fluid (in Barrels) RWC 802 21.65 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018-M07 Synthetic Liner Materials (in Tons) RWC 806 2.26 Tons LANDFILL 100280
2018-M07 Synthetic Liner Materials (in Tons) RWC 806 0.98 Tons LANDFILL 100663
2018-M08 Drilling Fluid Waste (in Barrels) RWC 803 25.32 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2018-M08 Drilling Fluid Waste (in Barrels) RWC 803 272.50 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M08 Drilling Fluid Waste (in Barrels) RWC 803 248.17 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M08 Drilling Fluid Waste (in Barrels) RWC 803 20.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 75.33 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 13.33 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 5.00 Bbl REUSE (AT WELL PAD)
2018-M08 Produced Fluid (in Barrels) RWC 802 9.17 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M08 Produced Fluid (in Barrels) RWC 802 1.67 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M08 Produced Fluid (in Barrels) RWC 802 30.33 Bbl REUSE (AT WELL PAD)
2018-M08 Produced Fluid (in Barrels) RWC 802 40.17 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M09 Drilling Fluid Waste (in Barrels) RWC 803 79.29 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 2014-184
2018-M09 Drilling Fluid Waste (in Barrels) RWC 803 15.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE ORDER 2016-415
2018-M09 Drilling Fluid Waste (in Barrels) RWC 803 415.00 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M09 Drilling Fluid Waste (in Barrels) RWC 803 32.86 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M09 Drilling Fluid Waste (in Barrels) RWC 803 37.14 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018-M09 Drilling Fluid Waste (in Barrels) RWC 803 53.57 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 125.29 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 31.43 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 203.14 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 73.14 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2018-M09 Produced Fluid (in Barrels) RWC 802 83.97 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M10 Drilling Fluid Waste (in Barrels) RWC 803 14.29 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 2014-184
2018-M10 Drilling Fluid Waste (in Barrels) RWC 803 190.00 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M10 Drilling Fluid Waste (in Barrels) RWC 803 69.29 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M10 Drilling Fluid Waste (in Barrels) RWC 803 56.43 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 78.57 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 53.43 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 37.14 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 1.43 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 39.14 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M10 Produced Fluid (in Barrels) RWC 802 31.43 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M10 Produced Fluid (in Barrels) RWC 802 87.19 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M11 Drilling Fluid Waste (in Barrels) RWC 803 240.71 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M11 Drilling Fluid Waste (in Barrels) RWC 803 8.57 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M11 Drilling Fluid Waste (in Barrels) RWC 803 27.14 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018-M11 Drilling Fluid Waste (in Barrels) RWC 803 36.71 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 65.00 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 4.29 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 11.43 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 8.57 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M11 Produced Fluid (in Barrels) RWC 802 12.14 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 2014-184
2018-M11 Produced Fluid (in Barrels) RWC 802 60.57 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M11 Produced Fluid (in Barrels) RWC 802 58.86 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M11 Produced Fluid (in Barrels) RWC 802 53.57 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M12 Drilling Fluid Waste (in Barrels) RWC 803 95.71 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M12 Drilling Fluid Waste (in Barrels) RWC 803 27.14 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018-M12 Other Oil & Gas Wastes (in Barrels) RWC 899 74.29 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M12 Other Oil & Gas Wastes (in Barrels) RWC 899 9.29 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2018-M12 Other Oil & Gas Wastes (in Barrels) RWC 899 12.86 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2018-M12 Other Oil & Gas Wastes (in Barrels) RWC 899 63.57 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2018-M12 Produced Fluid (in Barrels) RWC 802 0.71 Bbl RESIDUAL WASTE PROCESSING FACILITY
2018-M12 Produced Fluid (in Barrels) RWC 802 69.51 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019-M01 Drilling Fluid Waste (in Barrels) RWC 803 76.71 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019-M01 Drilling Fluid Waste (in Barrels) RWC 803 7.86 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019-M01 Drilling Fluid Waste (in Barrels) RWC 803 64.29 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 92.86 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 22.14 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 49.57 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 28.57 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 5.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019-M01 Produced Fluid (in Barrels) RWC 802 17.14 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019-M01 Produced Fluid (in Barrels) RWC 802 127.14 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019-M01 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 1.55 Tons LANDFILL 100280
2019-M01 Synthetic Liner Materials (in Tons) RWC 806 0.82 Tons LANDFILL 100280
2019-M01 Synthetic Liner Materials (in Tons) RWC 806 6.56 Tons LANDFILL 100663
2019-M02 Drilling Fluid Waste (in Barrels) RWC 803 87.71 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019-M02 Drilling Fluid Waste (in Barrels) RWC 803 11.43 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019-M02 Drilling Fluid Waste (in Barrels) RWC 803 73.14 Bbl RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019-M02 Drilling Fluid Waste (in Barrels) RWC 803 122.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019-M02 Drilling Fluid Waste (in Tons) RWC 803 26.32 Tons RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 0.71 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 212.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 14.29 Bbl REUSE (AT WELL PAD)
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 17.86 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019-M02 Produced Fluid (in Barrels) RWC 802 102.86 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019-M02 Produced Fluid (in Barrels) RWC 802 14.29 Bbl RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-29
2019-M02 Produced Fluid (in Barrels) RWC 802 118.86 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019-M02 Produced Fluid (in Barrels) RWC 802 32.14 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019-M02 Produced Fluid (in Barrels) RWC 802 15.71 Bbl REUSE (AT WELL PAD)
2019-M02 Produced Fluid (in Barrels) RWC 802 15.71 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019-M02 Produced Fluid (in Tons) RWC 802 2.68 Tons RESIDUAL WASTE PROCESSING FACILITY ORDER 2016-29
2019-M03 Drilling Fluid Waste (in Barrels) RWC 803 27.86 Bbl REUSE (AT WELL PAD)
2019-M03 Filter Socks (in Tons) RWC 812 1.42 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 32.14 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019-M03 Produced Fluid (in Barrels) RWC 802 37.14 Bbl RESIDUAL WASTE PROCESSING FACILITY
2019-M03 Produced Fluid (in Barrels) RWC 802 33.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019-M03 Produced Fluid (in Barrels) RWC 802 97.71 Bbl REUSE (AT WELL PAD)
2019-M03 Produced Fluid (in Barrels) RWC 802 59.03 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019-M03 Produced Fluid (in Tons) RWC 802 6.34 Tons RESIDUAL WASTE PROCESSING FACILITY 2014-541
2019-M03 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 0.84 Tons LANDFILL CID: 29084

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2122310 Primary Facility 2012-12-10 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator was in the process of building the site and installing underground production pipelines. The Erosion and Sedimentation plan was on site. The BMP's appear to be properly installed and functioning properly. No accelerated erosion or sedimentation observed in relation to the well pad or access road. The Department notes that the two pits located on site appear to be excavated, however the pits are not lined. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2189931 Primary Facility 2013-08-06 Routine/Complete Inspection No Violations Noted Preoperational inspection in response to the SPUD notice received by the Department on 8/2/2013. At the time of inspection the Operator was in the process of setting the conductor. The Erosion and Sedimentation plan was on site. The BMP's appear to be properly installed and functioning properly. No accelerated erosion or sedimentation observed in relation to the well pad or access road. The Department notes that the pit located on site appear to be lined and in sound condition. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2194998 Primary Facility 2013-08-06 Drilling/Alteration No Violations Noted Well not spud in at time of inspection.
2203569 Primary Facility 2013-09-10 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling.
2209067 Primary Facility 2013-10-02 Routine/Complete Inspection No Violations Noted At the time of inspection the drill rig was on site and placed on containment. The Operator indicated that the well was actively being drilled. The Erosion and Sedimentation plan was on site. The BMP's appear to be properly installed and functioning properly. No accelerated erosion or sedimentation observed in relation to the well pad or access road. The Department notes that the pit located on site appear to be lined and in sound condition. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2211092 Primary Facility 2013-10-01 Drilling/Alteration No Violations Noted Falcon rig#28 Schramm 200 running 9 5/8” casing at time of inspection. Pit lined and freeboard maintained.
2212678 Primary Facility 2013-10-15 Drilling/Alteration No Violations Noted Waiting on rig to commence lateral drilling.
2259116 Primary Facility 2014-03-28 Drilling/Alteration No Violations Noted Waiting on frac.
2268220 Primary Facility 2014-04-02 Routine/Complete Inspection No Violations Noted At the time of inspection the drill rig was on site and placed on containment. The Operator indicated that the well was drilled to TD The Erosion and Sedimentation plan was on site. The BMP's appear to be properly installed and functioning properly. No accelerated erosion or sedimentation observed in relation to the well pad or access road. The Department notes that the impoundment located on site appear to be lined and in sound condition. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2268222 Primary Facility 2014-05-05 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled to TD The Erosion and Sedimentation plan was on site. The BMP's appear to be properly installed and functioning properly. No accelerated erosion or sedimentation observed in relation to the well pad or access road. The Department notes that the impoundment located on site appear to be lined and in sound condition. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2278212 Primary Facility 2014-06-11 Incident- Response to Accident or Event Violation(s) Noted Inspection the result of a spill reported to the Department by the Operator. At 00:45 on 6/11/2014 the Operator reported an unknown amount of friction reducer spill to the ground via a rain fall event and hole in the containment. At the time of inspection the Operator removed the matting boards in the area of the hole and observed a small amount of friction reduced present. The Operator is in compliance with the most current spill policy at this time. The Department suggests the Operator remove the area of containment where the friction reducer is located and continue to follow the friction reducer to ensure the initial spill has been contained and then take remediation steps to remove the impacted material. All disposal manifest should be forwarded to the Department upon completion of remediation efforts as well as any results from samples taken to ensure remediation levels have been reached.
2325512 Primary Facility 2014-12-01 Compliance Evaluation No Violations Noted Compliance Inspection the result of a spill reported to the Department by the Operator at 00:45 on 6/11/2014. The Operator reported an unknown amount of friction reducer spill to the ground via a rain fall event and hole in the containment. The Department received the 15 day response letter and the MSDS information associated with the material spilled. At the time of inspection the wells appeared to drilled, stimulated and equipped for production. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained.
2361189 Primary Facility 2015-04-09 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2393147 Primary Facility 2015-07-27 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be in production. The site appears to be restored. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2426916 Primary Facility 2015-11-18 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be in production. The site appears to be restored. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2476255 Primary Facility 2016-04-19 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production unit equipment-tank battery-dike look ok.
2507899 Primary Facility 2016-08-04 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. Site stable, no E& S issues in relation to site and/or access road.
2515921 Primary Facility 2016-09-01 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. Site stable, no E& S issues in relation to site and/or access road.
2516264 Primary Facility 2016-09-01 Routine/Complete Inspection No Violations Noted Well tagged-in production-well head casing-production set equipment-tank battery/containment ok.
2569463 Primary Facility 2017-03-06 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2686057 Primary Facility 2018-01-24 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. No E&S issues.

ESCGP active.

2720524 Primary Facility 2018-04-19 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. No E&S issues.
2766435 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted Well appears to be in good operating condition.
2771574 Primary Facility 2018-09-06 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. At the time of inspection, drilling activity associated with utica well on shared well pad site ongoing. No E&S issues.
2838311 Primary Facility 2019-02-02 Incident- Response to Accident or Event Pending Oversight of well
2844219 Primary Facility 2019-02-21 Routine/Complete Inspection No Violations Noted Operator rep on site during inspection.

According to operator rep, well is shut in. Liner is installed on pad. This liner appears structurally sound. Three brine tanks on site. Roll off boxes on site.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2278212 698101 06/11/2014 2014-06-11 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
698101 312100 NOV - Notice of Violation Comply/Closed 2014-12-01

For data sources see[7]

References