X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-131-20037"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-131-20037
 
| Well ID: 37-131-20037
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.639314, -75.973297 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.639314, -75.973297 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 08/24/2010
+
| Spud Date: 2010-08-24
 
|-
 
|-
| Permit Date: 5/12/2010
+
| Permit Date: 2010-05-12
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 544: Line 569:
 
| 1922616
 
| 1922616
 
| Primary Facility
 
| Primary Facility
| 10/25/2010
+
| 2010-10-25
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 551: Line 576:
 
| 1930322
 
| 1930322
 
| Primary Facility
 
| Primary Facility
| 11/23/2010
+
| 2010-11-23
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 558: Line 583:
 
| 1931929
 
| 1931929
 
| Primary Facility
 
| Primary Facility
| 11/30/2010
+
| 2010-11-30
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 565: Line 590:
 
| 1931939
 
| 1931939
 
| Primary Facility
 
| Primary Facility
| 12/03/2010
+
| 2010-12-03
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 572: Line 597:
 
| 1939058
 
| 1939058
 
| Primary Facility
 
| Primary Facility
| 12/22/2010
+
| 2010-12-22
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 579: Line 604:
 
| 1944427
 
| 1944427
 
| Primary Facility
 
| Primary Facility
| 01/04/2011
+
| 2011-01-04
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 586: Line 611:
 
| 1950451
 
| 1950451
 
| Primary Facility
 
| Primary Facility
| 02/16/2011
+
| 2011-02-16
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 593: Line 618:
 
| 1955249
 
| 1955249
 
| Primary Facility
 
| Primary Facility
| 01/24/2011
+
| 2011-01-24
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 600: Line 625:
 
| 1966044
 
| 1966044
 
| Primary Facility
 
| Primary Facility
| 04/07/2011
+
| 2011-04-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 607: Line 632:
 
| 1985334
 
| 1985334
 
| Primary Facility
 
| Primary Facility
| 06/30/2011
+
| 2011-06-30
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 614: Line 639:
 
| 1987623
 
| 1987623
 
| Primary Facility
 
| Primary Facility
| 07/13/2011
+
| 2011-07-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 621: Line 646:
 
| 2004017
 
| 2004017
 
| Primary Facility
 
| Primary Facility
| 09/19/2011
+
| 2011-09-19
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 628: Line 653:
 
| 2062439
 
| 2062439
 
| Primary Facility
 
| Primary Facility
| 03/15/2012
+
| 2012-03-15
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 635: Line 660:
 
| 2120690
 
| 2120690
 
| Primary Facility
 
| Primary Facility
| 09/13/2012
+
| 2012-09-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 642: Line 667:
 
| 2133552
 
| 2133552
 
| Primary Facility
 
| Primary Facility
| 01/15/2013
+
| 2013-01-15
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 649: Line 674:
 
| 2248241
 
| 2248241
 
| Primary Facility
 
| Primary Facility
| 02/25/2014
+
| 2014-02-25
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 656: Line 681:
 
| 2337920
 
| 2337920
 
| Primary Facility
 
| Primary Facility
| 01/20/2015
+
| 2015-01-20
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 663: Line 688:
 
| 2348623
 
| 2348623
 
| Primary Facility
 
| Primary Facility
| 02/18/2015
+
| 2015-02-18
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 670: Line 695:
 
| 2349427
 
| 2349427
 
| Primary Facility
 
| Primary Facility
| 02/26/2015
+
| 2015-02-26
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 677: Line 702:
 
| 2349574
 
| 2349574
 
| Primary Facility
 
| Primary Facility
| 03/05/2015
+
| 2015-03-05
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 684: Line 709:
 
| 2349622
 
| 2349622
 
| Primary Facility
 
| Primary Facility
| 03/06/2015
+
| 2015-03-06
 
| Follow-up Inspection
 
| Follow-up Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 691: Line 716:
 
| 2359214
 
| 2359214
 
| Primary Facility
 
| Primary Facility
| 04/08/2015
+
| 2015-04-08
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 738: Line 763:
 
| 601700
 
| 601700
 
| 11/23/2010
 
| 11/23/2010
| 01/25/2013
+
| 2010-11-23
 
| 207B - Failure to case and cement to prevent migrations into fresh groundwater
 
| 207B - Failure to case and cement to prevent migrations into fresh groundwater
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 746: Line 771:
 
| 601701
 
| 601701
 
| 11/23/2010
 
| 11/23/2010
| 01/25/2013
+
| 2010-11-23
 
| 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
 
| 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
 
| Administrative
 
| Administrative
Line 754: Line 779:
 
| 600760
 
| 600760
 
| 11/30/2010
 
| 11/30/2010
| 01/25/2013
+
| 2010-11-30
 
| 207B - Failure to case and cement to prevent migrations into fresh groundwater
 
| 207B - Failure to case and cement to prevent migrations into fresh groundwater
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 762: Line 787:
 
| 600761
 
| 600761
 
| 11/30/2010
 
| 11/30/2010
| 01/25/2013
+
| 2010-11-30
 
| 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
 
| 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
 
| Administrative
 
| Administrative
Line 770: Line 795:
 
| 600762
 
| 600762
 
| 12/03/2010
 
| 12/03/2010
| 01/25/2013
+
| 2010-12-03
 
| 207B - Failure to case and cement to prevent migrations into fresh groundwater
 
| 207B - Failure to case and cement to prevent migrations into fresh groundwater
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 778: Line 803:
 
| 600763
 
| 600763
 
| 12/03/2010
 
| 12/03/2010
| 01/25/2013
+
| 2010-12-03
 
| 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
 
| 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days
 
| Administrative
 
| Administrative
Line 800: Line 825:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 01/25/2013
+
| 2013-01-25
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 809: Line 834:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 01/25/2013
+
| 2013-01-25
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 818: Line 843:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 01/25/2013
+
| 2013-01-25
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 827: Line 852:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 01/25/2013
+
| 2013-01-25
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 836: Line 861:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 01/25/2013
+
| 2013-01-25
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 845: Line 870:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 01/25/2013
+
| 2013-01-25
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 856: Line 881:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 15:00, 1 August 2019

Well Details

Well ID: 37-131-20037
Loading map...
Country: United States
State: Pennsylvania
County: Wyoming
Municipality: Washington Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 148860
Farm/Lease Name: MCGRAW 2H
License Status: Active
Spud Date: 2010-08-24
Permit Date: 2010-05-12
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.639314
Longitude: -75.973297

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2011 CHESAPEAKE APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHESAPEAKE APPALACHIA LLC 827,205.00 93 0.00 0 0.00 0
2013 CHESAPEAKE APPALACHIA LLC 3,642,592.00 365 0.00 0 0.00 0
2014 CHESAPEAKE APPALACHIA LLC 1,738,481.00 251 0.00 0 0.00 0
2015 CHESAPEAKE APPALACHIA LLC 1,972,310.00 278 0.00 0 0.00 0
2016 CHESAPEAKE APPALACHIA LLC 1,256,774.00 262 0.00 0 0.00 0
2017 CHESAPEAKE APPALACHIA LLC 1,074,208.00 351 0.00 0 0.00 0
2018 CHESAPEAKE APPALACHIA LLC 760,584.00 322 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 193,045.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2012-S01 Produced Fluid (in Barrels) 314.50 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S02 Produced Fluid (in Barrels) 55.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012-S02 Produced Fluid (in Barrels) 726.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 415.83 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 367.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Drilling Fluid Waste (in Barrels) 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2014-S01 Fracing Fluid Waste (in Barrels) 30.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2014-S01 Produced Fluid (in Barrels) 206.87 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 20.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2014-S02 Produced Fluid (in Barrels) 146.17 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 608.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 130.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Other Oil & Gas Wastes (in Barrels) RWC 899 173.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NW011
2016-S01 Other Oil & Gas Wastes (in Barrels) RWC 899 45.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC008
2016-S01 Other Oil & Gas Wastes (in Barrels) RWC 899 25.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016-S01 Produced Fluid (in Barrels) RWC 802 11.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016-S01 Produced Fluid (in Barrels) RWC 802 34.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2016-S01 Produced Fluid (in Barrels) RWC 802 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016-S01 Synthetic Liner Materials (in Tons) RWC 806 0.45 Tons LANDFILL 8-0728-0004/013
2016-S02 Produced Fluid (in Barrels) RWC 802 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2016-S02 Produced Fluid (in Barrels) RWC 802 175.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2016-S02 Produced Fluid (in Barrels) RWC 802 115.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016-S02 Produced Fluid (in Barrels) RWC 802 159.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2016-S02 Produced Fluid (in Barrels) RWC 802 347.50 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 3.17 Tons LANDFILL 301626
2017-M01 Produced Fluid (in Barrels) RWC 802 28.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M01 Produced Fluid (in Barrels) RWC 802 27.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-M02 Produced Fluid (in Barrels) RWC 802 26.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-M03 Produced Fluid (in Barrels) RWC 802 35.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-M04 Produced Fluid (in Barrels) RWC 802 28.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 12.00 Bbl REUSE (AT WELL PAD)
2017-M05 Produced Fluid (in Barrels) RWC 802 26.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-M06 Other Oil & Gas Wastes (in Barrels) RWC 899 10.00 Bbl REUSE (AT WELL PAD)
2017-M06 Synthetic Liner Materials (in Tons) RWC 806 0.20 Tons CENT WASTE TRT FAC NPDES DISCHARGE PAG034815
2017-M07 Produced Fluid (in Barrels) RWC 802 47.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2017-M07 Produced Fluid (in Barrels) RWC 802 27.50 Bbl REUSE (AT WELL PAD)
2017-M07 Synthetic Liner Materials (in Tons) RWC 806 4.80 Tons CENT WASTE TRT FAC NPDES DISCHARGE PAG034815
2017-M09 Produced Fluid (in Barrels) RWC 802 2.30 Bbl REUSE (AT WELL PAD)
2017-M11 Produced Fluid (in Barrels) RWC 802 36.50 Bbl REUSE (AT WELL PAD)
2018-M01 Produced Fluid (in Barrels) RWC 802 26.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M01 Waste Water Treatment Sludge (in Tons) RWC 804 0.40 Tons LANDFILL 301626
2018-M02 Produced Fluid (in Barrels) RWC 802 91.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M02 Produced Fluid (in Barrels) RWC 802 13.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M02 Produced Fluid (in Barrels) RWC 802 217.00 Bbl REUSE (AT WELL PAD)
2018-M02 Synthetic Liner Materials (in Tons) RWC 806 0.30 Tons LANDFILL 8-0728-0004/013
2018-M02 Waste Water Treatment Sludge (in Tons) RWC 804 2.40 Tons LANDFILL 301626
2018-M03 Produced Fluid (in Barrels) RWC 802 24.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M03 Produced Fluid (in Barrels) RWC 802 44.00 Bbl REUSE (AT WELL PAD)
2018-M03 Synthetic Liner Materials (in Tons) RWC 806 1.30 Tons CENT WASTE TRT FAC NPDES DISCHARGE PAG034815
2018-M03 Synthetic Liner Materials (in Tons) RWC 806 0.40 Tons LANDFILL 8-0728-0004/013
2018-M03 Waste Water Treatment Sludge (in Tons) RWC 804 1.00 Tons LANDFILL 301626
2018-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 48.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 29.00 Bbl REUSE (AT WELL PAD)
2018-M05 Waste Water Treatment Sludge (in Tons) RWC 804 1.30 Tons LANDFILL 301626
2018-M06 Produced Fluid (in Barrels) RWC 802 42.40 Bbl REUSE (AT WELL PAD)
2018-M06 Waste Water Treatment Sludge (in Tons) RWC 804 0.59 Tons LANDFILL 301626
2018-M07 Produced Fluid (in Barrels) RWC 802 21.60 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M07 Produced Fluid (in Barrels) RWC 802 21.40 Bbl REUSE (AT WELL PAD)
2018-M08 Produced Fluid (in Barrels) RWC 802 66.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M08 Waste Water Treatment Sludge (in Tons) RWC 804 2.50 Tons LANDFILL 301626

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1922616 Primary Facility 2010-10-25 Drilling/Alteration No Violations Noted Rigging down to move to McGraw 5H
1930322 Primary Facility 2010-11-23 Follow-up Inspection Violation(s) Noted Onsite visit with DEP Geologist (Eric Rooney) and DEP WQS (Ryan Klemish). Followup inpsection of possible stray gas in cellar. Lower elbow on the 2" vent line of the 13 3/8" annulus had bubbles migrating out of joint. Small intermitent bubbles seen every 10 sec. Approx 6" of water in cellar at time of inspection. Asked DEP rep to use flir camera to detect any gas that may be present as I wasn't sure if bubbling from elbow was gas migration or plumbing problem. Also, Gauge on 13 3/8 showing 0 psi, however vavle closed during time of inspection and possible loose elbow. Talked with completions supervisor Nick Pottmeyer stating they would go out and tighten up fittings, open the vavle and monitor for any pressure buildup. Also asked Mr. Pottmeyer to replace the guage on the string with one with smaller graduations to detect any gas that may be present.
1931929 Primary Facility 2010-11-30 Follow-up Inspection Violation(s) Noted Follow-up of loose elbow on 2" vent line of 13 3/8". Water drained from cellar. Gauges were replaced with those of smaller graduations on casing strings. 300PSI on production string.
1931939 Primary Facility 2010-12-03 Follow-up Inspection Violation(s) Noted All valves were open and that there was no pressure on any of the gauges (including the production string). I also noted that there was a brass vented nipple installed on the 2" vent line that appeared to be on the outside of the 13 3/8" annulus.
1939058 Primary Facility 2010-12-22 Routine/Complete Inspection No Violations Noted Reading at wellhead measured 50% methane on vent of 13 3/8". During time of inspection noted that pressure guages were removed from the wellhead.
1944427 Primary Facility 2011-01-04 Drilling/Alteration No Violations Noted Preparing location for fract ops
1950451 Primary Facility 2011-02-16 Drilling/Alteration No Violations Noted
1955249 Primary Facility 2011-01-24 Follow-up Inspection No Violations Noted Checked well. Head being heated. No activity. 13 3/8" being vented.
1966044 Primary Facility 2011-04-07 Routine/Complete Inspection No Violations Noted Laying down mats and liner to prepare for spudding of 5H
1985334 Primary Facility 2011-06-30 Routine/Complete Inspection No Violations Noted 200# gauge on surface. 0 psi. Contacted Nick Pottmeyer requesting smaller gauge (50#) on surface casing string.
1987623 Primary Facility 2011-07-13 Routine/Complete Inspection No Violations Noted 13 3/8 gauges replaced wth 50# as requested. All other gauges 100#
2004017 Primary Facility 2011-09-19 Routine/Complete Inspection No Violations Noted
2062439 Primary Facility 2012-03-15 Routine/Complete Inspection No Violations Noted cellar is dug out, no water. 9 5/8" X 13 3/8" annulus vented. Checked with gas meter, no gas.
2120690 Primary Facility 2012-09-13 Routine/Complete Inspection No Violations Noted Well fract. 2 seperators, 2 tanks. 8 Brine water tanks, 11 fresh water tanks on location
2133552 Primary Facility 2013-01-15 Routine/Complete Inspection No Violations Noted Producing well. No water in cellar.
2248241 Primary Facility 2014-02-25 Routine/Complete Inspection No Violations Noted Producing well. Cellar empty w/ a little snow.
2337920 Primary Facility 2015-01-20 Follow-up Inspection No Violations Noted
2348623 Primary Facility 2015-02-18 Follow-up Inspection No Violations Noted Chesapeake was in the process of breaking down secondary containment and washing rig mats. I recorded a conductivity reading of (3.59) milliSiemens/cm in water on containment on the western side of the pad near the cut slope. A vacuum truck operator was in the process of removing water on containment nearby area where the elevated conductivity was recorded. I pointed out to him the where the water with the elevated conductivity was. He claimed he would remove all of the water on containment. I recorded (3.62) milliSiemens/cm conductivity in water on the pad surface next to a heating unit and frac tank used to contain water to wash the rig mats. Mr. Wilkes informed that the water with the elevated conductivity readings off containment will be removed via and on-site vacuum truck.
2349427 Primary Facility 2015-02-26 Follow-up Inspection No Violations Noted Chesapeake was in the process of breaking down secondary containment, washing rig mats and removing snow and ice on containment. Mr. Krut informed me of a crack in the poly urea encompassing the perimeter of the 1H wellhead. The wellheads are contained with a cement apron. The cement below the poly urea on the 1H well is not compromised according to Mr. Krut. Due to the crack in the poly urea, Leidos Engineering performed soil conductivity screening on the pad surface around the perimeter of the cement apron on 2/25/15. Mr. Krut indicated that Leidos collected a total of (6) EC screenings/. The highest reading was (628) microSiemens/cm. Background soil conductivity readings, which were collected in the Northeast corner of the Pad, were (301) microSiemens/cm according to Mr. Krut. The Department did not observe staining/visibly impacted soils on the pad surface near the cement apron; N 41°38’22”; W-75°58’24”.
2349574 Primary Facility 2015-03-05 Administrative/File Review No Violations Noted This administrative inspection has been created to document Chesapeake’s discovery of soil conductivity screening readings above background levels on 2/26/15. On 3/2/15, Nick Krut, Environmental Representative of Chesapeake submitted an Electrical Conductivity Screening Summary Map for the McGraw Wyo Pad. Leidos Engineering performed soil conductivity screening at the site on 2/26/15. Due to soil conductivity readings elevated above background levels, the Department requested Chesapeake collect a sample in the area that exhibited the conductivity reading of (637) microSiemens/cm to verify the presence or absence of potentially impacted pad surface material. The Department requested the sample be analyzed for flowback/production fluid parameters. Chesapeake has agreed to collect a sample based on the Department’s request.
2349622 Primary Facility 2015-03-06 Follow-up Inspection No Violations Noted Chesapeake was in the process of attempting to return the McGraw 2H and McGraw 5H wells into production. Mr. Krut contacted me on 3-5-15 regarding the removal of all of the secondary containment used for hydraulic fracturing operations. The containment was completely removed from the site on 3-4-15. It has taken several weeks to remove the containment from the site due to the weather, according to Mr. Krut. The department did not observe any signs of contamination of the pad surface where the containment was staged. The majority of the pad surface was snow covered from the most recent snowfall event.
2359214 Primary Facility 2015-04-08 Administrative/File Review No Violations Noted This administrative inspection has been created to document Chesapeake’s submittal of a report to the Department on 4/2/15 containing a datatable and sample results of a sample collected by Chesapeake’s contractor, Leidos Engineering at the McGraw well Pad on 3/11/15 in response to the release of approximately (750) barrels of proppant laden fluid on containment on January 19, 2015, and elevated field electrical conductivity (EC) screenings, conducted by Leidos, on February 25, 2015 documented in the McGraw 3/5/15 inspection report. The Department has concluded that there are no technical deficiencies in the report containing the data table and sampling results and no further action is warranted at this time at the McGraw well pad in the area where the proppant laden fluid was released to containment and the field electrical conductivity screening readings were detected at levels slightly above background.
2472337 Primary Facility 2016-04-07 Routine/Complete Inspection No Violations Noted
2478660 Primary Facility 2016-04-25 Routine/Complete Inspection No Violations Noted
2692769 Primary Facility 2018-02-01 Routine/Partial Inspection No Violations Noted Onsite in follow-up to citizens report of activity occurring on pad. Upon arrival: Weather: Clear, cold, ~20 degs. (5) wells are present on this pad. The 1H, 2H, 3H & 5H were Producing. The 4H well head was being prepped for Stimulation. Weir Energy hands were onsite replacing the production tree of 4H with a 10K master valve. I spoke with CALLC's Completions WSS, Brian Heffron onsite. Mr. Heffron mentioned that the (4) producing wells would remain in production until the the Completions equipment was being mobilized to pad, which he thought would be several weeks. Access was limited to well area due to work being performed on pad. No obvious concerns or violations were noted at time of inspection.
2708814 Primary Facility 2018-03-22 Routine/Complete Inspection No Violations Noted Hydraulic fracturing operations have recently concluded CHK Personnel were prepping the well (4H) for production. No violations were noted. If you have any questions, please contact me.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1930322 601700 11/23/2010 2010-11-23 207B - Failure to case and cement to prevent migrations into fresh groundwater Environmental Health & Safety 78.81(a)(2)&(3)
1930322 601701 11/23/2010 2010-11-23 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative
1931929 600760 11/30/2010 2010-11-30 207B - Failure to case and cement to prevent migrations into fresh groundwater Environmental Health & Safety 78.81(a)(2)&(3)
1931929 600761 11/30/2010 2010-11-30 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative
1931939 600762 12/03/2010 2010-12-03 207B - Failure to case and cement to prevent migrations into fresh groundwater Environmental Health & Safety 78.81(a)(2)&(3)
1931939 600763 12/03/2010 2010-12-03 78.86* - Failure to report defective, insufficient, or improperly cemented casing w/in 24 hrs or submit plan to correct w/in 30 days Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
601700 266243 NOV - Notice of Violation Comply/Closed 2013-01-25
601701 266243 NOV - Notice of Violation Comply/Closed 2013-01-25
600760 266243 NOV - Notice of Violation Comply/Closed 2013-01-25
600761 266243 NOV - Notice of Violation Comply/Closed 2013-01-25
600762 266243 NOV - Notice of Violation Comply/Closed 2013-01-25
600763 266243 NOV - Notice of Violation Comply/Closed 2013-01-25

For data sources see[6]

References