X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-23471"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-23471
 
| Well ID: 37-085-23471
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.480266, -80.396989 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.480266, -80.396989 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 01/13/2005
+
| Spud Date: 2005-01-13
 
|-
 
|-
| Permit Date: 2/17/2004
+
| Permit Date: 2004-02-17
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 65: Line 90:
 
| style="text-align: right;" | 312
 
| style="text-align: right;" | 312
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 76: Line 101:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 83: Line 108:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 103: Line 128:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 112: Line 137:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 119: Line 144:
 
| style="text-align: right;" | 240
 
| style="text-align: right;" | 240
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[BOBCAT WELL & PIPELINE LLC]]
 
| [[BOBCAT WELL & PIPELINE LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 30.01
 
| style="text-align: right;" | 30.01
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 1
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 156: Line 181:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2005-0
+
| 2005-A00
 
| Brine
 
| Brine
 
| style="text-align: right;" | 581.00 Bbl
 
| style="text-align: right;" | 581.00 Bbl
Line 162: Line 187:
 
|  
 
|  
 
|-
 
|-
| 2008-0
+
| 2008-A00
 
| Brine
 
| Brine
 
| style="text-align: right;" | 181.00 Bbl
 
| style="text-align: right;" | 181.00 Bbl
Line 168: Line 193:
 
|  
 
|  
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 108.00 Bbl
 
| style="text-align: right;" | 108.00 Bbl
Line 174: Line 199:
 
| 34-007-22038
 
| 34-007-22038
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 22.00 Bbl
 
| style="text-align: right;" | 22.00 Bbl
Line 180: Line 205:
 
| 34-155-23584
 
| 34-155-23584
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 23.00 Bbl
 
| style="text-align: right;" | 23.00 Bbl
Line 186: Line 211:
 
| 34-007-22038
 
| 34-007-22038
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 84.00 Bbl
 
| style="text-align: right;" | 84.00 Bbl
Line 192: Line 217:
 
| 34-099-23127
 
| 34-099-23127
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 51.00 Bbl
 
| style="text-align: right;" | 51.00 Bbl
Line 198: Line 223:
 
| 34-007-20919
 
| 34-007-20919
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 64.00 Bbl
 
| style="text-align: right;" | 64.00 Bbl
Line 204: Line 229:
 
| 34-155-22403
 
| 34-155-22403
 
|-
 
|-
| 2013-0
+
| 2013-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 254.00 Bbl
 
| style="text-align: right;" | 254.00 Bbl
Line 210: Line 235:
 
| 34-007-20919
 
| 34-007-20919
 
|-
 
|-
| 2013-0
+
| 2013-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 37.00 Bbl
 
| style="text-align: right;" | 37.00 Bbl
Line 216: Line 241:
 
|  
 
|  
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 24.00 Bbl
 
| style="text-align: right;" | 24.00 Bbl
Line 241: Line 266:
 
| 1412121
 
| 1412121
 
| Primary Facility
 
| Primary Facility
| 01/25/2005
+
| 2005-01-25
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 248: Line 273:
 
| 1412592
 
| 1412592
 
| Primary Facility
 
| Primary Facility
| 01/27/2005
+
| 2005-01-27
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 255: Line 280:
 
| 1424783
 
| 1424783
 
| Primary Facility
 
| Primary Facility
| 03/01/2005
+
| 2005-03-01
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 262: Line 287:
 
| 1438286
 
| 1438286
 
| Primary Facility
 
| Primary Facility
| 04/06/2005
+
| 2005-04-06
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 288: Line 313:
 
| 443171
 
| 443171
 
| 01/25/2005
 
| 01/25/2005
| 01/27/2005
+
| 2005-01-25
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 312: Line 337:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 19:02, 1 August 2019

Well Details

Well ID: 37-085-23471
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: Greene Township
Operator Name: BOBCAT WELL & PIPELINE LLC
Well Pad ID:
Farm/Lease Name: HIGGINS 2
License Status: Active
Spud Date: 2005-01-13
Permit Date: 2004-02-17
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.480266
Longitude: -80.396989

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2005 D & L ENERGY INC 13,143.00 312 0.00 0 0.00 0
2008 D & L ENERGY INC 8,810.00 366 42.00 365 0.00 0
2010 D & L ENERGY INC 5,917.70 365 0.00 0 0.00 0
2011 D & L ENERGY INC 4,783.90 365 0.00 0 0.00 0
2012 D & L ENERGY INC 4,109.40 365 24.56 365 0.00 0
2013 D & L ENERGY INC 3,280.87 365 55.91 365 0.00 0
2015 BOBCAT WELL & PIPELINE LLC 2,380.82 240 0.00 0 0.00 0
2016 0.00 0 0.00 0 0.00 0
2017 BOBCAT WELL & PIPELINE LLC 0.00 0 30.01 1 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2005-A00 Brine 581.00 Bbl Injection Disposal Well
2008-A00 Brine 181.00 Bbl
2010-A00 Produced Fluid (in Barrels) 108.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-007-22038
2010-A00 Produced Fluid (in Barrels) 22.00 Bbl INJECTION DISPOSAL WELL 34-155-23584
2011-A00 Produced Fluid (in Barrels) 23.00 Bbl INJECTION DISPOSAL WELL 34-007-22038
2011-A00 Produced Fluid (in Barrels) 84.00 Bbl INJECTION DISPOSAL WELL 34-099-23127
2012-A00 Produced Fluid (in Barrels) 51.00 Bbl INJECTION DISPOSAL WELL 34-007-20919
2012-A00 Produced Fluid (in Barrels) 64.00 Bbl INJECTION DISPOSAL WELL 34-155-22403
2013-A00 Produced Fluid (in Barrels) 254.00 Bbl INJECTION DISPOSAL WELL 34-007-20919
2013-A00 Produced Fluid (in Barrels) 37.00 Bbl ROAD SPREADING
2017-A00 Produced Fluid (in Barrels) RWC 802 24.00 Bbl INJECTION DISPOSAL WELL 34-007-20919

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1412121 Primary Facility 2005-01-25 Drilling/Alteration Violation(s) Noted
1412592 Primary Facility 2005-01-27 Drilling/Alteration No Violations Noted
1424783 Primary Facility 2005-03-01 Administrative/File Review No Violations Noted well record review
1438286 Primary Facility 2005-04-06 Drilling/Alteration No Violations Noted
2594848 Primary Facility 2017-05-17 Routine/Complete Inspection No Violations Noted 1300 hrs: well is shut in. 100 bbl steel tank with seeping rusty area below main drain valve needs pumped, repaired/replaced. Tank and separator in earthen dike. Well tag and rabbit at wellhead. Annulus unknown (buried).

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1412121 443171 01/25/2005 2005-01-25 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

For data sources see[6]

References