X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-21689"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-081-21689
 
| Well ID: 37-081-21689
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.545347, -77.178608 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.545347, -77.178608 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 08/18/2017
+
| Spud Date: 2017-08-18
 
|-
 
|-
| Permit Date: 8/11/2017
+
| Permit Date: 2017-08-11
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
| 1
 +
| 2018-02-21
 +
| 2018-03-04
 +
| style="text-align: right;" | 7811
 +
| style="text-align: right;" | 12,924,400.0
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|- valign="top"
 +
| rowspan="20"| 1
 +
| rowspan="1"| SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676)
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Proppant
 +
| Listed Below
 +
| Listed Below
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| LP-65 MC
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Scale Inhibitor
 +
| Listed Below
 +
| Listed Below
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| BE-9W
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Biocide
 +
| Listed Below
 +
| Listed Below
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="11"|
 +
| rowspan="11"|
 +
| rowspan="11"|
 +
| Propylene glycol
 +
| 57-55-6
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.0240415
 +
| style="text-align: right;" | 29951
 +
|-
 +
| Crystalline silica, quartz
 +
| 14808-60-7
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 11.9966
 +
| style="text-align: right;" | 14,945,300.0
 +
|-
 +
| Organic phosphonate
 +
| Proprietary
 +
| style="text-align: right;" | 60
 +
| style="text-align: right;" | 0.0133975
 +
| style="text-align: right;" | 16691
 +
|-
 +
| Diammonium phosphate
 +
| 7783-28-0
 +
| style="text-align: right;" | 5
 +
| style="text-align: right;" | 0.00111646
 +
| style="text-align: right;" | 1391
 +
|-
 +
| Non-hazardous food substance
 +
| Proprietary
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 0.000433457
 +
| style="text-align: right;" | 540
 +
|-
 +
| Ammonium chloride
 +
| 12125-02-9
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.00669876
 +
| style="text-align: right;" | 8346
 +
|-
 +
| Hydrochloric acid
 +
| 7647-01-0
 +
| style="text-align: right;" | 15
 +
| style="text-align: right;" | 0.212827
 +
| style="text-align: right;" | 265140
 +
|-
 +
| Tributyl tetradecyl phosphonium chloride
 +
| 81741-28-8
 +
| style="text-align: right;" | 10
 +
| style="text-align: right;" | 0.00400692
 +
| style="text-align: right;" | 4992
 +
|-
 +
| Acrylamide acrylate copolymer
 +
| Proprietary
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.0345978
 +
| style="text-align: right;" | 43102
 +
|-
 +
| Hydrotreated light petroleum distillate
 +
| 64742-47-8
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.0345978
 +
| style="text-align: right;" | 43102
 +
|-
 +
| Inorganic salt
 +
| Proprietary
 +
| style="text-align: right;" | 30
 +
| style="text-align: right;" | 0.0345978
 +
| style="text-align: right;" | 43102
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Fresh Water
 +
| rowspan="1"| Operator
 +
| rowspan="1"| Base Fluid
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 86.4064
 +
| style="text-align: right;" | 107,645,000.0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| Ingredients
 +
| rowspan="1"| Listed Above
 +
| rowspan="1"| Listed Above
 +
| Water
 +
| 7732-18-5
 +
| style="text-align: right;" | 100
 +
| style="text-align: right;" | 1.54151
 +
| style="text-align: right;" | 1,920,410.0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| HAI-150E
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Corrosion Inhibitor
 +
| Listed Below
 +
| Listed Below
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| SAND-PREMIUM WHITE-30/50, BULK
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Proppant
 +
| Listed Below
 +
| Listed Below
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| HYDROCHLORIC ACID
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Solvent
 +
| Listed Below
 +
| Listed Below
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
|- valign="top"
 +
| rowspan="1"| FR-76
 +
| rowspan="1"| Halliburton
 +
| rowspan="1"| Friction Reducer
 +
| Listed Below
 +
| Listed Below
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =FracFocus Fracking Chemicals Database
 +
| date = 2019-04-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-06-19 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 663: Line 860:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
| 1
 
| 02/21/2018
 
| 03/04/2018
 
| style="text-align: right;" | 7811
 
| style="text-align: right;" | 12,924,400.0
 
| style="text-align: right;" | 0
 
|-
 
|}
 
==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|- valign="top"
 
| rowspan="20"| 1
 
| rowspan="1"| SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676)
 
| rowspan="1"| Halliburton
 
| rowspan="1"| Proppant
 
| Listed Below
 
| Listed Below
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="1"| LP-65 MC
 
| rowspan="1"| Halliburton
 
| rowspan="1"| Scale Inhibitor
 
| Listed Below
 
| Listed Below
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="1"| BE-9W
 
| rowspan="1"| Halliburton
 
| rowspan="1"| Biocide
 
| Listed Below
 
| Listed Below
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="11"|
 
| rowspan="11"|
 
| rowspan="11"|
 
| Propylene glycol
 
| 57-55-6
 
| style="text-align: right;" | 60
 
| style="text-align: right;" | 0.0240415
 
| style="text-align: right;" | 29951
 
|-
 
| Crystalline silica, quartz
 
| 14808-60-7
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 11.9966
 
| style="text-align: right;" | 14,945,300.0
 
|-
 
| Organic phosphonate
 
| Proprietary
 
| style="text-align: right;" | 60
 
| style="text-align: right;" | 0.0133975
 
| style="text-align: right;" | 16691
 
|-
 
| Diammonium phosphate
 
| 7783-28-0
 
| style="text-align: right;" | 5
 
| style="text-align: right;" | 0.00111646
 
| style="text-align: right;" | 1391
 
|-
 
| Non-hazardous food substance
 
| Proprietary
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 0.000433457
 
| style="text-align: right;" | 540
 
|-
 
| Ammonium chloride
 
| 12125-02-9
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.00669876
 
| style="text-align: right;" | 8346
 
|-
 
| Hydrochloric acid
 
| 7647-01-0
 
| style="text-align: right;" | 15
 
| style="text-align: right;" | 0.212827
 
| style="text-align: right;" | 265140
 
|-
 
| Tributyl tetradecyl phosphonium chloride
 
| 81741-28-8
 
| style="text-align: right;" | 10
 
| style="text-align: right;" | 0.00400692
 
| style="text-align: right;" | 4992
 
|-
 
| Acrylamide acrylate copolymer
 
| Proprietary
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.0345978
 
| style="text-align: right;" | 43102
 
|-
 
| Hydrotreated light petroleum distillate
 
| 64742-47-8
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.0345978
 
| style="text-align: right;" | 43102
 
|-
 
| Inorganic salt
 
| Proprietary
 
| style="text-align: right;" | 30
 
| style="text-align: right;" | 0.0345978
 
| style="text-align: right;" | 43102
 
|-
 
|- valign="top"
 
| rowspan="1"| Fresh Water
 
| rowspan="1"| Operator
 
| rowspan="1"| Base Fluid
 
| Water
 
| 7732-18-5
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 86.4064
 
| style="text-align: right;" | 107,645,000.0
 
|-
 
|- valign="top"
 
| rowspan="1"| Ingredients
 
| rowspan="1"| Listed Above
 
| rowspan="1"| Listed Above
 
| Water
 
| 7732-18-5
 
| style="text-align: right;" | 100
 
| style="text-align: right;" | 1.54151
 
| style="text-align: right;" | 1,920,410.0
 
|-
 
|- valign="top"
 
| rowspan="1"| HAI-150E
 
| rowspan="1"| Halliburton
 
| rowspan="1"| Corrosion Inhibitor
 
| Listed Below
 
| Listed Below
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="1"| SAND-PREMIUM WHITE-30/50, BULK
 
| rowspan="1"| Halliburton
 
| rowspan="1"| Proppant
 
| Listed Below
 
| Listed Below
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="1"| HYDROCHLORIC ACID
 
| rowspan="1"| Halliburton
 
| rowspan="1"| Solvent
 
| Listed Below
 
| Listed Below
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|- valign="top"
 
| rowspan="1"| FR-76
 
| rowspan="1"| Halliburton
 
| rowspan="1"| Friction Reducer
 
| Listed Below
 
| Listed Below
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =FracFocus Fracking Chemicals Database
 
| date = 2019-04-02
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-06-19 }}</ref>
 
 
==References==
 
==References==
 
<references/>
 
<references/>

Revision as of 01:00, 2 August 2019

Well Details

Well ID: 37-081-21689
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Jackson Township
Operator Name: SWN PROD CO LLC
Well Pad ID: 153432
Farm/Lease Name: BROWN 3H
License Status: Active
Spud Date: 2017-08-18
Permit Date: 2017-08-11
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.545347
Longitude: -77.178608

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-21 2018-03-04 7811 12,924,400.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SAND-COMMON WHITE-100 MESH, SSA-2, BULK (100003676) Halliburton Proppant Listed Below Listed Below 0 0 0
LP-65 MC Halliburton Scale Inhibitor Listed Below Listed Below 0 0 0
BE-9W Halliburton Biocide Listed Below Listed Below 0 0 0
Propylene glycol 57-55-6 60 0.0240415 29951
Crystalline silica, quartz 14808-60-7 100 11.9966 14,945,300.0
Organic phosphonate Proprietary 60 0.0133975 16691
Diammonium phosphate 7783-28-0 5 0.00111646 1391
Non-hazardous food substance Proprietary 100 0.000433457 540
Ammonium chloride 12125-02-9 30 0.00669876 8346
Hydrochloric acid 7647-01-0 15 0.212827 265140
Tributyl tetradecyl phosphonium chloride 81741-28-8 10 0.00400692 4992
Acrylamide acrylate copolymer Proprietary 30 0.0345978 43102
Hydrotreated light petroleum distillate 64742-47-8 30 0.0345978 43102
Inorganic salt Proprietary 30 0.0345978 43102
Fresh Water Operator Base Fluid Water 7732-18-5 100 86.4064 107,645,000.0
Ingredients Listed Above Listed Above Water 7732-18-5 100 1.54151 1,920,410.0
HAI-150E Halliburton Corrosion Inhibitor Listed Below Listed Below 0 0 0
SAND-PREMIUM WHITE-30/50, BULK Halliburton Proppant Listed Below Listed Below 0 0 0
HYDROCHLORIC ACID Halliburton Solvent Listed Below Listed Below 0 0 0
FR-76 Halliburton Friction Reducer Listed Below Listed Below 0 0 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 SWN PROD CO LLC 0.00 0 0.00 0 0.00 0
2018 SWN PROD CO LLC 2,389,742.00 259 0.00 0 0.00 0
2019 SWN PROD CO LLC 520,632.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2017-M08 Drill Cuttings (in Tons) RWC 810 227.34 Tons LANDFILL 101247
2017-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 10.00 Bbl REUSE (AT WELL PAD)
2017-M11 Drill Cuttings (in Tons) RWC 810 3.79 Tons LANDFILL 301358
2017-M11 Drill Cuttings (in Tons) RWC 810 795.30 Tons LANDFILL 301626
2017-M11 Drilling Fluid Waste (in Barrels) RWC 803 505.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 196.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 55.00 Bbl REUSE (AT WELL PAD)
2017-M12 Drill Cuttings (in Tons) RWC 810 903.37 Tons LANDFILL 301626
2017-M12 Drilling Fluid Waste (in Barrels) RWC 803 440.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-M01 Drilling Fluid Waste (in Barrels) RWC 803 430.00 Bbl REUSE (AT WELL PAD)
2018-M01 Drilling Fluid Waste (in Barrels) RWC 803 36.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 146.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 220.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 15.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M01 Synthetic Liner Materials (in Tons) RWC 806 12.45 Tons LANDFILL 301358
2018-M02 Synthetic Liner Materials (in Tons) RWC 806 10.00 Tons LANDFILL 301358
2018-M03 Produced Fluid (in Barrels) RWC 802 435.00 Bbl SURFACE IMPOUNDMENT 826342
2018-M03 Unused Fracturing Fluid Waste (in Tons) RWC 805 37.16 Tons LANDFILL 301358
2018-M04 Other Oil & Gas Wastes (in Barrels) RWC 899 36.67 Bbl REUSE (AT WELL PAD)
2018-M04 Produced Fluid (in Barrels) RWC 802 80.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-M04 Produced Fluid (in Barrels) RWC 802 3,230.00 Bbl REUSE (AT WELL PAD)
2018-M04 Produced Fluid (in Barrels) RWC 802 6,923.67 Bbl SURFACE IMPOUNDMENT 826342
2018-M05 Filter Socks (in Tons) RWC 812 0.96 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 50.00 Bbl REUSE (AT WELL PAD)
2018-M05 Produced Fluid (in Barrels) RWC 802 133.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-M05 Produced Fluid (in Barrels) RWC 802 19,153.33 Bbl REUSE (AT WELL PAD)
2018-M05 Produced Fluid (in Barrels) RWC 802 1,813.33 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M06 Produced Fluid (in Barrels) RWC 802 6,530.00 Bbl REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 1,577.00 Bbl SURFACE IMPOUNDMENT 826342
2018-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 67.94 Bbl SURFACE IMPOUNDMENT 826342
2018-M07 Produced Fluid (in Barrels) RWC 802 4,070.00 Bbl SURFACE IMPOUNDMENT 826342
2018-M07 Produced Fluid (in Barrels) RWC 802 1,906.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 36.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M08 Produced Fluid (in Barrels) RWC 802 73.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-M08 Produced Fluid (in Barrels) RWC 802 3,593.33 Bbl SURFACE IMPOUNDMENT 826342
2018-M08 Produced Fluid (in Barrels) RWC 802 1,246.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M09 Other Oil & Gas Wastes (in Tons) RWC 899 250.25 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-M09 Produced Fluid (in Barrels) RWC 802 80.00 Bbl REUSE (AT WELL PAD)
2018-M09 Produced Fluid (in Barrels) RWC 802 703.33 Bbl SURFACE IMPOUNDMENT 826342
2018-M09 Produced Fluid (in Barrels) RWC 802 3,216.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M10 Produced Fluid (in Barrels) RWC 802 1,686.67 Bbl REUSE (AT WELL PAD)
2018-M10 Produced Fluid (in Barrels) RWC 802 2,150.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M11 Produced Fluid (in Barrels) RWC 802 733.33 Bbl REUSE (AT WELL PAD)
2018-M11 Produced Fluid (in Barrels) RWC 802 1,366.67 Bbl SURFACE IMPOUNDMENT 826342
2018-M11 Produced Fluid (in Barrels) RWC 802 956.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M11 Waste Water Treatment Sludge (in Tons) RWC 804 4.62 Tons LANDFILL 301358
2018-M12 Produced Fluid (in Barrels) RWC 802 880.00 Bbl REUSE (AT WELL PAD)
2018-M12 Produced Fluid (in Barrels) RWC 802 3,086.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2018-M12 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 0.17 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2019-M01 Produced Fluid (in Barrels) RWC 802 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019-M01 Produced Fluid (in Barrels) RWC 802 440.00 Bbl SURFACE IMPOUNDMENT 826342
2019-M01 Produced Fluid (in Barrels) RWC 802 1,933.33 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019-M02 Produced Fluid (in Barrels) RWC 802 1,316.67 Bbl REUSE (AT WELL PAD)
2019-M02 Produced Fluid (in Barrels) RWC 802 710.00 Bbl SURFACE IMPOUNDMENT 95-16-65420-013
2019-M03 Produced Fluid (in Barrels) RWC 802 340.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC035
2019-M03 Produced Fluid (in Barrels) RWC 802 276.67 Bbl REUSE (AT WELL PAD)
2019-M03 Produced Fluid (in Barrels) RWC 802 1,216.67 Bbl SURFACE IMPOUNDMENT 95-16-65420-013

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2591126 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted Routine Inspection; 5/2/2017.

I entered the site at approximately 10:40 and talked to Tom Chitwood (SWN). The first 100+ feet of the access road and construction entrance was constructed and extra base rock was stockpiled for maintenance. The contractor used the existing road (withbase rock upgrades as needed) to get back to the last few hundred feet of access road and the well pad itself. The well pad area has been cleared and perimeter E&S controls have been installed. At the time of the inspection, the contractor was scraping topsoil from the shallow bedrock. The rock on the pad will be drilled and shot and the resulting material will be used as base rock throughout the site. Overall, the site is in good condition. No Violations Noted.

2601956 Primary Facility 2017-06-06 Routine/Complete Inspection No Violations Noted Routine inspection; 6/6/2017.

I entered the site at 13:18. At the time of the inspection, the majority of the bulk earthmoving was complete and work to establish drainage and ditches was underway. The topsoil stockpile was seeded and stabilized while disturbed soils along the access road were temporarily stabilized. Perimeter E&S controls are functioning properly and are in good condition no E&S issues were noted. Final grading and seeding/stabilization has yet to be completed. Top rock on the entire location will need to be completed as well. Overall the site looks good. No violations noted.

2608323 Primary Facility 2017-06-27 Routine/Complete Inspection No Violations Noted Routine inspection; 6/27/2017.

I entered the site at 08:55. At the time of the inspection, the access road was complete (including top-rock) and previously disturbed soils were seeded and stabilized. The berm for the infiltration basin was constructed and topsoiled. The under-drain, rock, geo-fabric, and amended soils were being installed on the infiltration basin. The pad area was complete except for clean-up, topsoiling, seed/stabilization, and top-rock. The E&S controls are installed and functioning properly. No E&S issues were noted. This inspection fulfills the pre-operational inspection requirement of the Oil and Gas Act as amended by Act 13. Overall the site looks good. No violations noted.

2635386 Primary Facility 2017-08-30 Routine/Complete Inspection No Violations Noted Routine inspection of unconventional spudded well. No violations noted at time of inspection.
2638773 Primary Facility 2017-09-18 Drilling/Alteration No Violations Noted The site is well vegetated but not yet permanently stabilized. Pipeline is being tied-in on the northern edge of the pad while rig mats and barricades are staged onsite. The site is in good condition. No violations noted.
2661832 Primary Facility 2017-11-17 Routine/Complete Inspection No Violations Noted Met with Andrew Griffith on location to perform drilling inspection. Drilling had not yet commenced due to rig construction issues. Drilling expected to commence later in the day. Inspected BOP remote location. Containment in good/new condition. Noted a few containers missing labels
2662443 Primary Facility 2017-11-20 Drilling/Alteration No Violations Noted Weather 36 Deg. F, windy and cloudy. Met with Andrew Griffith, discussed surface cement job, inspected driller's log and conducted a brief inspection of location. No violations noted at at the time of inspection.
2664179 Primary Facility 2017-11-27 Drilling/Alteration No Violations Noted Met with Johnathan Woodburn SWN company man. Intermediate casing has been cemented at the time of inspection. Current drilling depth is 4496 ft. Verified WOC time after intermediate cement job.

Verified BOP test documentation, pressure held at 5,000 PSI. Verified intermediate casing and fit test.

2665232 Primary Facility 2017-11-28 Routine/Complete Inspection No Violations Noted I met Jonathan Woodburn when I arrived. SWN rig 45 on location drilling the 3H well at a depth of 6793', currently drilling on air. Woody walked the site with me. Sitewide containment appeared to be in good condition, and secondary containments around the mud tanks and diesel tank were also in good condition. The site was clean and well maintained.
2666926 Primary Facility 2017-12-04 Routine/Complete Inspection No Violations Noted Met with Johnathan Woodburn to discuss the previous weeks operations on location. Drilling is progressing with approximately 2400' more feet to TD. Cementing of the production string is anticipated to begin at 3 am Thursday morning. No violations noted at time of inspection.
2668287 Primary Facility 2017-12-07 Routine/Complete Inspection No Violations Noted Met with Andrew Griffith and discussed the upcoming cement job for the 5 1/2 production string. Entered proposal cement totals into inspection report. They are preparing to cement at approximately 2 pm 12/7/17. Drillers log is up to date with pertinent information. No violations noted at time of inspection.
2669251 Primary Facility 2017-12-11 Routine/Complete Inspection No Violations Noted Weather was 28 degrees F. and snowy at time of inspection. Met with SWN representative Andrew Griffith. Discussed production cement job. Estimated top of cement was 4432' on the 5 1/2 casing. The hole was circulated 2 bottoms up before cement. No losses of drilling mud were recorded during hole circulation. Floats held at the end of the job. Reviewed the job log from the cement job. Cement density was maintained through out the cement job. Rig then proceeded to skid to the Brown 2H well 081-21631. No violations noted at time of inspection.
2672541 Primary Facility 2017-12-15 Routine/Complete Inspection No Violations Noted Weather was 12° and cloudy at time of inspection. Met with SWN representative Andrew Griffith on location. At time of inspection well was shut in. There was no bubbling detected in the cellar. No violations noted at time of inspection.
2677072 Primary Facility 2018-01-02 Routine/Complete Inspection No Violations Noted Weather was 12 degrees F. Met with Johnathan Woodburn at time of inspection. Well and cellar were covered by the catwalk. No violations noted at time of inspections.
2681311 Primary Facility 2018-01-11 Routine/Complete Inspection No Violations Noted Weather was 33 degrees F. Met with Andrew Griffith at time of inspection. Well and cellar were covered by the catwalk. No violations noted at time of inspections.
2684539 Primary Facility 2018-01-18 Routine/Complete Inspection No Violations Noted Weather was 15 degrees F. Met with Johnathan Woodburn at time of inspection. Well and cellar were covered by the catwalk. No change in conditions from previous inspection. No violations noted at time of inspection.
2685745 Primary Facility 2018-01-23 Routine/Complete Inspection No Violations Noted Weather was 45 degrees F. and raining at time of inspection. Met with Johnathan Woodburn at time of inspection. Well and cellar were covered by the catwalk. No change in conditions from previous inspection. No violations noted at time of inspection.
2692549 Primary Facility 2018-02-06 Routine/Complete Inspection No Violations Noted When I was 26° and cloudy at time of inspection. Well was shut in. Gas production units were in the process of being installed on the well pad at time of inspection. Well has one annulus vent plumbed to surface from the 5 1/2 x 9 5/8 annulus. It was shut in at time of inspection. The 9 5/8 x 13 3/8 annulus and 13 3/8 x 20 annulus were visually observed to have cement to surface at time of inspection. There was an analog pressure gauge attached to the well head that would show the production casing pressure. At time of inspection the gauge was shut off by a needle valve. No violations were noted at time of inspection.
2699871 Primary Facility 2018-02-28 Routine/Complete Inspection No Violations Noted I met Mark MacPherson, company man, when I arrived. Frac was active, currently fracing stage 26 on the 3H well. Tracy Gregory of SWN arrived as I began my inspection, and accompanied me. Containment appeared to be in good condition. Nearly all of the puddles on the pad surface showed low conductance (.45-.65 mS/cm). There were 2 puddles that showed slightly higher conductance (1.0 mS/cm), one near the sandboxes (approximately 1 gallon) and one near the command trailer (5-10 gallons). Tracy informed Mac and instructed him to have these areas vacced.
2756405 Primary Facility 2018-07-26 Routine/Complete Inspection No Violations Noted Weather was 71° and sunny at time of inspection. There had been substantial rain over the last four days previous to inspection. There were no SWN representatives on location at time of inspection. Cellars were filled in and covered with black felt containment. Well had a digital pressure gauge on the tubing that read 489 psi at time of inspection. There was an analog 0-10k psi pressure gauge attached above the swab valve that red zero psi at time inspection. No violations noted at time of inspection.
2775209 Primary Facility 2018-09-11 Site Restoration No Violations Noted The operator submitted a post-drill well site restoration report for this site which prompted this inspection. A SWN employee arrived at the site simultaneously. Another SWN employee, Tyler Parsons, arrived at the site during the inspection. Mr. Parsons relayed that the five frac tanks on location are in use as temporary additional storage for produced water.

Three of seven permitted wells (Brown 1H, 2H, and 3H) have been drilled and stimulated. These three wells were in production at the time of inspection.

The site is stable with 70 percent vegetative cover overall. A bioretention basin and a rock-lined ditch provide PCSM. These appear to be functioning as designed. The site has been permitted to remain at full pad size.

At this time, due to the presence of three roll off tanks, a battery of five frac tanks used for temporary produced water storage, and secondary containment around the wellheads and frac tanks, the site does not yet meet all of the post-drilling site restoration criteria under 78a.65.

2801755 Primary Facility 2018-11-13 Routine/Complete Inspection No Violations Noted Three wells staged for production. Three each sand and water separators within containment. No leaks.

Pipeline project being run to site at this time.

2842763 Primary Facility 2019-02-21 Routine/Complete Inspection No Violations Noted Weather was 41 degrees and sunny. There were no Southwestern representatives on location at time of inspection. Well had digital pressure monitoring equipment attached to the production tubing. Tubing pressure was 307 PSI at time of inspection. The 9x5 annulus vent was plumbed into the pay line. 0% combustable gas was detected around the well at time of inspection. No violations noted at time of insoection.

For data sources see[7]

References