X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-111-20296"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-111-20296
 
| Well ID: 37-111-20296
| style="height=100%; align=center" rowspan="14" | {{#display_map: 39.743583, -79.357611 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 39.743583, -79.357611 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 03/24/2010
+
| Spud Date: 2010-03-24
 
|-
 
|-
| Permit Date: 2/25/2010
+
| Permit Date: 2010-02-25
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 165: Line 190:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 16APRU
+
| 2010-A01
| Produced Fluid (in Barrels) RWC 802
+
| Drilling Fluid Waste (in Barrels)
| style="text-align: right;" | 104.00 Bbl
+
| style="text-align: right;" | 700.00 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123SW005
+
| PA0101508
 
|-
 
|-
| 16AUGU
+
| 2010-S01
| Produced Fluid (in Barrels) RWC 802
+
| Drilling Fluid Waste (in Barrels)
| style="text-align: right;" | 262.00 Bbl
+
| style="text-align: right;" | 350.00 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123SW005
+
| PA0101508
 
|-
 
|-
| 16DECU
+
| 2010-S02
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 615.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 16JULU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 538.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 16JUNU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 200.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 16MAYU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 217.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 16NOVU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 524.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 16OCTU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 228.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
|-
 
| 16SEPU
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 183.00 Bbl
 
| STORAGE PENDING DISPOSAL OR REUSE
 
|
 
|-
 
| 2010-2
 
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 3,730.00 Bbl
 
| style="text-align: right;" | 3,730.00 Bbl
Line 225: Line 208:
 
| 34-059-24067
 
| 34-059-24067
 
|-
 
|-
| 2010-2
+
| 2010-S02
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 7,760.00 Bbl
 
| style="text-align: right;" | 7,760.00 Bbl
Line 231: Line 214:
 
| PA0091472
 
| PA0091472
 
|-
 
|-
| 2010-2
+
| 2010-S02
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 365.00 Bbl
 
| style="text-align: right;" | 365.00 Bbl
Line 237: Line 220:
 
| PA0095273
 
| PA0095273
 
|-
 
|-
| 2010-2
+
| 2010-S02
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 12,439.00 Bbl
 
| style="text-align: right;" | 12,439.00 Bbl
Line 243: Line 226:
 
| PA0254185
 
| PA0254185
 
|-
 
|-
| 2010-2
+
| 2010-S02
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 495.00 Bbl
 
| style="text-align: right;" | 495.00 Bbl
Line 249: Line 232:
 
| WMGR119
 
| WMGR119
 
|-
 
|-
| 2010-2
+
| 2010-S02
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 240.00 Bbl
 
| style="text-align: right;" | 240.00 Bbl
Line 255: Line 238:
 
| 34-133-24096
 
| 34-133-24096
 
|-
 
|-
| 2010-2
+
| 2010-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 4,729.00 Bbl
 
| style="text-align: right;" | 4,729.00 Bbl
Line 261: Line 244:
 
| 301353
 
| 301353
 
|-
 
|-
| 2010-3
+
| 2011-S02
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 700.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
|-
 
| 2011-2
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
Line 273: Line 250:
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2011-2
+
| 2011-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 15,378.00 Bbl
 
| style="text-align: right;" | 15,378.00 Bbl
Line 279: Line 256:
 
| 34-121-2-3995
 
| 34-121-2-3995
 
|-
 
|-
| 2011-2
+
| 2011-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 946.00 Bbl
 
| style="text-align: right;" | 946.00 Bbl
Line 285: Line 262:
 
|  
 
|  
 
|-
 
|-
| 2012-1
+
| 2012-S01
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 1,940.00 Bbl
 
| style="text-align: right;" | 1,940.00 Bbl
Line 291: Line 268:
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2012-1
+
| 2012-S01
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 6,059.00 Bbl
 
| style="text-align: right;" | 6,059.00 Bbl
Line 297: Line 274:
 
|  
 
|  
 
|-
 
|-
| 2012-1
+
| 2012-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 6,755.00 Bbl
 
| style="text-align: right;" | 6,755.00 Bbl
Line 303: Line 280:
 
| 34-121-23995
 
| 34-121-23995
 
|-
 
|-
| 2012-2
+
| 2012-S02
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 296.16 Tons
 
| style="text-align: right;" | 296.16 Tons
Line 309: Line 286:
 
| 100419
 
| 100419
 
|-
 
|-
| 2012-2
+
| 2012-S02
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 1,803.00 Bbl
 
| style="text-align: right;" | 1,803.00 Bbl
Line 315: Line 292:
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2012-2
+
| 2012-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 56.00 Bbl
 
| style="text-align: right;" | 56.00 Bbl
Line 321: Line 298:
 
| 34-121-23995
 
| 34-121-23995
 
|-
 
|-
| 2013-1
+
| 2013-S01
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 492.74 Tons
 
| style="text-align: right;" | 492.74 Tons
Line 327: Line 304:
 
| 100419
 
| 100419
 
|-
 
|-
| 2013-1
+
| 2013-S01
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 355.00 Bbl
 
| style="text-align: right;" | 355.00 Bbl
Line 333: Line 310:
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2013-2
+
| 2013-S02
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 95.00 Bbl
 
| style="text-align: right;" | 95.00 Bbl
Line 339: Line 316:
 
|  
 
|  
 
|-
 
|-
| 2014-1
+
| 2014-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 11.67 Bbl
 
| style="text-align: right;" | 11.67 Bbl
Line 345: Line 322:
 
|  
 
|  
 
|-
 
|-
| 2014-2
+
| 2014-S02
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 2,727.67 Bbl
 
| style="text-align: right;" | 2,727.67 Bbl
Line 351: Line 328:
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2014-2
+
| 2014-S02
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 28.33 Bbl
 
| style="text-align: right;" | 28.33 Bbl
Line 357: Line 334:
 
|  
 
|  
 
|-
 
|-
| 2014-2
+
| 2014-S02
 
| Fracturing Fluid Waste (in Tons)
 
| Fracturing Fluid Waste (in Tons)
 
| style="text-align: right;" | 58.23 Tons
 
| style="text-align: right;" | 58.23 Tons
Line 363: Line 340:
 
| 76-00-08
 
| 76-00-08
 
|-
 
|-
| 2014-2
+
| 2014-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 70.83 Bbl
 
| style="text-align: right;" | 70.83 Bbl
Line 369: Line 346:
 
|  
 
|  
 
|-
 
|-
| 2015-1
+
| 2015-S01
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 4,304.17 Bbl
 
| style="text-align: right;" | 4,304.17 Bbl
Line 375: Line 352:
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2015-1
+
| 2015-S01
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 13.33 Bbl
 
| style="text-align: right;" | 13.33 Bbl
Line 381: Line 358:
 
|  
 
|  
 
|-
 
|-
| 2015-1
+
| 2015-S01
 
| Fracturing Fluid Waste (in Tons)
 
| Fracturing Fluid Waste (in Tons)
 
| style="text-align: right;" | 23.48 Tons
 
| style="text-align: right;" | 23.48 Tons
Line 387: Line 364:
 
| 100592
 
| 100592
 
|-
 
|-
| 2015-1
+
| 2015-S01
 
| Fracturing Fluid Waste (in Tons)
 
| Fracturing Fluid Waste (in Tons)
 
| style="text-align: right;" | 0.11 Tons
 
| style="text-align: right;" | 0.11 Tons
Line 393: Line 370:
 
| MID0209062814
 
| MID0209062814
 
|-
 
|-
| 2015-1
+
| 2015-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 16.67 Bbl
 
| style="text-align: right;" | 16.67 Bbl
Line 399: Line 376:
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2015-1
+
| 2015-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 5,986.17 Bbl
 
| style="text-align: right;" | 5,986.17 Bbl
Line 405: Line 382:
 
|  
 
|  
 
|-
 
|-
| 2015-2
+
| 2015-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 13.33 Bbl
 
| style="text-align: right;" | 13.33 Bbl
Line 411: Line 388:
 
| WMGR123SW001
 
| WMGR123SW001
 
|-
 
|-
| 2015-2
+
| 2015-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 4,930.67 Bbl
 
| style="text-align: right;" | 4,930.67 Bbl
Line 417: Line 394:
 
|  
 
|  
 
|-
 
|-
| 2016-04
+
| 2016-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 104.00 Bbl
 
| style="text-align: right;" | 104.00 Bbl
Line 423: Line 400:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2016-05
+
| 2016-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 217.00 Bbl
 
| style="text-align: right;" | 217.00 Bbl
Line 429: Line 406:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2016-06
+
| 2016-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 200.00 Bbl
 
| style="text-align: right;" | 200.00 Bbl
Line 435: Line 412:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2016-07
+
| 2016-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 538.00 Bbl
 
| style="text-align: right;" | 538.00 Bbl
Line 441: Line 418:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2016-08
+
| 2016-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 262.00 Bbl
 
| style="text-align: right;" | 262.00 Bbl
Line 447: Line 424:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2016-09
+
| 2016-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 183.00 Bbl
 
| style="text-align: right;" | 183.00 Bbl
Line 453: Line 430:
 
|  
 
|  
 
|-
 
|-
| 2016-1
+
| 2016-M10
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,521.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2016-10
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 228.00 Bbl
 
| style="text-align: right;" | 228.00 Bbl
Line 465: Line 436:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2016-11
+
| 2016-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 524.00 Bbl
 
| style="text-align: right;" | 524.00 Bbl
Line 471: Line 442:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2016-12
+
| 2016-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 615.00 Bbl
 
| style="text-align: right;" | 615.00 Bbl
Line 477: Line 448:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2017-01
+
| 2016-S01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 1,521.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2017-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 744.00 Bbl
 
| style="text-align: right;" | 744.00 Bbl
Line 483: Line 460:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2017-02
+
| 2017-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 570.00 Bbl
 
| style="text-align: right;" | 570.00 Bbl
Line 489: Line 466:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2017-03
+
| 2017-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 282.00 Bbl
 
| style="text-align: right;" | 282.00 Bbl
Line 495: Line 472:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2017-03
+
| 2017-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 442.00 Bbl
 
| style="text-align: right;" | 442.00 Bbl
Line 501: Line 478:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2017-04
+
| 2017-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 523.00 Bbl
 
| style="text-align: right;" | 523.00 Bbl
Line 507: Line 484:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2017-04
+
| 2017-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 41.00 Bbl
 
| style="text-align: right;" | 41.00 Bbl
Line 513: Line 490:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2017-05
+
| 2017-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 320.00 Bbl
 
| style="text-align: right;" | 320.00 Bbl
Line 519: Line 496:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2017-06
+
| 2017-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 528.00 Bbl
 
| style="text-align: right;" | 528.00 Bbl
Line 525: Line 502:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2017-07
+
| 2017-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 284.00 Bbl
 
| style="text-align: right;" | 284.00 Bbl
Line 531: Line 508:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2017-08
+
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 202.00 Bbl
 
| style="text-align: right;" | 202.00 Bbl
Line 537: Line 514:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2017-08
+
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 244.00 Bbl
 
| style="text-align: right;" | 244.00 Bbl
Line 543: Line 520:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2017-08
+
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
Line 549: Line 526:
 
| WMGR123SW010
 
| WMGR123SW010
 
|-
 
|-
| 2017-09
+
| 2017-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 387.00 Bbl
 
| style="text-align: right;" | 387.00 Bbl
Line 555: Line 532:
 
| WMGR123SW010
 
| WMGR123SW010
 
|-
 
|-
| 2017-10
+
| 2017-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 63.00 Bbl
 
| style="text-align: right;" | 63.00 Bbl
Line 561: Line 538:
 
| WMGR123SW010
 
| WMGR123SW010
 
|-
 
|-
| 2017-12
+
| 2017-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 281.00 Bbl
 
| style="text-align: right;" | 281.00 Bbl
Line 567: Line 544:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2017-12
+
| 2017-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 41.00 Bbl
 
| style="text-align: right;" | 41.00 Bbl
Line 573: Line 550:
 
| WMGR123SW010
 
| WMGR123SW010
 
|-
 
|-
| 2018-01
+
| 2018-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 529.00 Bbl
 
| style="text-align: right;" | 529.00 Bbl
Line 579: Line 556:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2018-01
+
| 2018-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 162.00 Bbl
 
| style="text-align: right;" | 162.00 Bbl
Line 585: Line 562:
 
| WMGR123SW010
 
| WMGR123SW010
 
|-
 
|-
| 2018-02
+
| 2018-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 122.00 Bbl
 
| style="text-align: right;" | 122.00 Bbl
Line 591: Line 568:
 
| WMGR123SW010
 
| WMGR123SW010
 
|-
 
|-
| 2018-03
+
| 2018-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 611.00 Bbl
 
| style="text-align: right;" | 611.00 Bbl
Line 597: Line 574:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2018-04
+
| 2018-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 326.00 Bbl
 
| style="text-align: right;" | 326.00 Bbl
Line 603: Line 580:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2018-05
+
| 2018-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 245.00 Bbl
 
| style="text-align: right;" | 245.00 Bbl
Line 609: Line 586:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2018-06
+
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 136.00 Bbl
 
| style="text-align: right;" | 136.00 Bbl
Line 615: Line 592:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2018-07
+
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 45.00 Bbl
 
| style="text-align: right;" | 45.00 Bbl
Line 621: Line 598:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2018-07
+
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 22.00 Bbl
 
| style="text-align: right;" | 22.00 Bbl
Line 627: Line 604:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2018-07
+
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 196.00 Bbl
 
| style="text-align: right;" | 196.00 Bbl
Line 633: Line 610:
 
| WMGR123SW010
 
| WMGR123SW010
 
|-
 
|-
| 2018-08
+
| 2018-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 76.00 Bbl
 
| style="text-align: right;" | 76.00 Bbl
Line 639: Line 616:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2018-08
+
| 2018-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 791.00 Bbl
 
| style="text-align: right;" | 791.00 Bbl
Line 645: Line 622:
 
| WMGR123SW010
 
| WMGR123SW010
 
|-
 
|-
| 2018-09
+
| 2018-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 491.00 Bbl
 
| style="text-align: right;" | 491.00 Bbl
Line 651: Line 628:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2018-10
+
| 2018-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 264.00 Bbl
 
| style="text-align: right;" | 264.00 Bbl
Line 657: Line 634:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2018-10
+
| 2018-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 533.00 Bbl
 
| style="text-align: right;" | 533.00 Bbl
Line 663: Line 640:
 
|  
 
|  
 
|-
 
|-
| 2018-11
+
| 2018-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 151.00 Bbl
 
| style="text-align: right;" | 151.00 Bbl
Line 669: Line 646:
 
| WMGR123SW010
 
| WMGR123SW010
 
|-
 
|-
| 2018-11
+
| 2018-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 152.00 Bbl
 
| style="text-align: right;" | 152.00 Bbl
Line 675: Line 652:
 
|  
 
|  
 
|-
 
|-
| 2018-12
+
| 2018-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 513.00 Bbl
 
| style="text-align: right;" | 513.00 Bbl
Line 681: Line 658:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2018-12
+
| 2018-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 27.00 Bbl
 
| style="text-align: right;" | 27.00 Bbl
Line 687: Line 664:
 
|  
 
|  
 
|-
 
|-
| 2019-01
+
| 2019-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 620.00 Bbl
 
| style="text-align: right;" | 620.00 Bbl
Line 693: Line 670:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2019-02
+
| 2019-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 579.00 Bbl
 
| style="text-align: right;" | 579.00 Bbl
Line 699: Line 676:
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2019-03
+
| 2019-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 487.00 Bbl
 
| style="text-align: right;" | 487.00 Bbl
Line 724: Line 701:
 
| 1873366
 
| 1873366
 
| Primary Facility
 
| Primary Facility
| 03/25/2010
+
| 2010-03-25
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 731: Line 708:
 
| 1877308
 
| 1877308
 
| Primary Facility
 
| Primary Facility
| 04/08/2010
+
| 2010-04-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 738: Line 715:
 
| 1880296
 
| 1880296
 
| Primary Facility
 
| Primary Facility
| 04/23/2010
+
| 2010-04-23
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 745: Line 722:
 
| 1884554
 
| 1884554
 
| Primary Facility
 
| Primary Facility
| 05/12/2010
+
| 2010-05-12
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 752: Line 729:
 
| 1918459
 
| 1918459
 
| Primary Facility
 
| Primary Facility
| 10/06/2010
+
| 2010-10-06
 
| Complaint Inspection
 
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 759: Line 736:
 
| 1922566
 
| 1922566
 
| Primary Facility
 
| Primary Facility
| 10/13/2010
+
| 2010-10-13
 
| Complaint Inspection
 
| Complaint Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 766: Line 743:
 
| 1922591
 
| 1922591
 
| Primary Facility
 
| Primary Facility
| 10/14/2010
+
| 2010-10-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 773: Line 750:
 
| 1969535
 
| 1969535
 
| Primary Facility
 
| Primary Facility
| 04/29/2011
+
| 2011-04-29
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 780: Line 757:
 
| 1975389
 
| 1975389
 
| Primary Facility
 
| Primary Facility
| 04/26/2011
+
| 2011-04-26
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 787: Line 764:
 
| 1986075
 
| 1986075
 
| Primary Facility
 
| Primary Facility
| 06/14/2011
+
| 2011-06-14
 
| Administrative/File Review
 
| Administrative/File Review
 
| No Violations Noted
 
| No Violations Noted
Line 794: Line 771:
 
| 1997389
 
| 1997389
 
| Primary Facility
 
| Primary Facility
| 08/04/2011
+
| 2011-08-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 801: Line 778:
 
| 1997539
 
| 1997539
 
| Primary Facility
 
| Primary Facility
| 08/04/2011
+
| 2011-08-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 808: Line 785:
 
| 2016289
 
| 2016289
 
| Primary Facility
 
| Primary Facility
| 11/03/2011
+
| 2011-11-03
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 815: Line 792:
 
| 2051538
 
| 2051538
 
| Primary Facility
 
| Primary Facility
| 03/14/2012
+
| 2012-03-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 822: Line 799:
 
| 2067339
 
| 2067339
 
| Primary Facility
 
| Primary Facility
| 05/04/2012
+
| 2012-05-04
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 829: Line 806:
 
| 2069244
 
| 2069244
 
| Primary Facility
 
| Primary Facility
| 05/18/2012
+
| 2012-05-18
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 836: Line 813:
 
| 2070173
 
| 2070173
 
| Primary Facility
 
| Primary Facility
| 05/10/2012
+
| 2012-05-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 843: Line 820:
 
| 2076225
 
| 2076225
 
| Primary Facility
 
| Primary Facility
| 06/13/2012
+
| 2012-06-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 850: Line 827:
 
| 2078166
 
| 2078166
 
| Primary Facility
 
| Primary Facility
| 06/20/2012
+
| 2012-06-20
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 857: Line 834:
 
| 2088107
 
| 2088107
 
| Primary Facility
 
| Primary Facility
| 08/01/2012
+
| 2012-08-01
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 864: Line 841:
 
| 2092836
 
| 2092836
 
| Primary Facility
 
| Primary Facility
| 05/24/2012
+
| 2012-05-24
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 871: Line 848:
 
| 2093088
 
| 2093088
 
| Primary Facility
 
| Primary Facility
| 06/21/2012
+
| 2012-06-21
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 878: Line 855:
 
| 2094698
 
| 2094698
 
| Primary Facility
 
| Primary Facility
| 08/06/2012
+
| 2012-08-06
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 885: Line 862:
 
| 2094798
 
| 2094798
 
| Primary Facility
 
| Primary Facility
| 08/14/2012
+
| 2012-08-14
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 892: Line 869:
 
| 2095561
 
| 2095561
 
| Primary Facility
 
| Primary Facility
| 08/28/2012
+
| 2012-08-28
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 899: Line 876:
 
| 2107615
 
| 2107615
 
| Primary Facility
 
| Primary Facility
| 10/09/2012
+
| 2012-10-09
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 906: Line 883:
 
| 2120846
 
| 2120846
 
| Primary Facility
 
| Primary Facility
| 11/30/2012
+
| 2012-11-30
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 913: Line 890:
 
| 2121603
 
| 2121603
 
| Primary Facility
 
| Primary Facility
| 11/28/2012
+
| 2012-11-28
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 920: Line 897:
 
| 2123089
 
| 2123089
 
| Primary Facility
 
| Primary Facility
| 11/12/2012
+
| 2012-11-12
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 927: Line 904:
 
| 2128475
 
| 2128475
 
| Primary Facility
 
| Primary Facility
| 12/17/2012
+
| 2012-12-17
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 934: Line 911:
 
| 2128645
 
| 2128645
 
| Primary Facility
 
| Primary Facility
| 01/08/2013
+
| 2013-01-08
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 941: Line 918:
 
| 2130307
 
| 2130307
 
| Primary Facility
 
| Primary Facility
| 01/14/2013
+
| 2013-01-14
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 948: Line 925:
 
| 2136131
 
| 2136131
 
| Primary Facility
 
| Primary Facility
| 01/31/2013
+
| 2013-01-31
 
| Incident- Response to Accident or Event
 
| Incident- Response to Accident or Event
 
| In Compliance with Policy
 
| In Compliance with Policy
Line 955: Line 932:
 
| 2143461
 
| 2143461
 
| Primary Facility
 
| Primary Facility
| 02/11/2013
+
| 2013-02-11
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 962: Line 939:
 
| 2143507
 
| 2143507
 
| Primary Facility
 
| Primary Facility
| 02/22/2013
+
| 2013-02-22
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 969: Line 946:
 
| 2144627
 
| 2144627
 
| Primary Facility
 
| Primary Facility
| 02/25/2013
+
| 2013-02-25
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 976: Line 953:
 
| 2151599
 
| 2151599
 
| Primary Facility
 
| Primary Facility
| 03/13/2013
+
| 2013-03-13
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 983: Line 960:
 
| 2168502
 
| 2168502
 
| Primary Facility
 
| Primary Facility
| 05/22/2013
+
| 2013-05-22
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 990: Line 967:
 
| 2169711
 
| 2169711
 
| Primary Facility
 
| Primary Facility
| 05/22/2013
+
| 2013-05-22
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 997: Line 974:
 
| 2173629
 
| 2173629
 
| Primary Facility
 
| Primary Facility
| 06/10/2013
+
| 2013-06-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 1,004: Line 981:
 
| 2228147
 
| 2228147
 
| Primary Facility
 
| Primary Facility
| 11/26/2013
+
| 2013-11-26
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 1,011: Line 988:
 
| 2228305
 
| 2228305
 
| Primary Facility
 
| Primary Facility
| 10/31/2013
+
| 2013-10-31
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 1,018: Line 995:
 
| 2228693
 
| 2228693
 
| Primary Facility
 
| Primary Facility
| 10/09/2013
+
| 2013-10-09
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 1,025: Line 1,002:
 
| 2229875
 
| 2229875
 
| Primary Facility
 
| Primary Facility
| 09/26/2013
+
| 2013-09-26
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 1,032: Line 1,009:
 
| 2235790
 
| 2235790
 
| Primary Facility
 
| Primary Facility
| 01/13/2014
+
| 2014-01-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 1,039: Line 1,016:
 
| 2244496
 
| 2244496
 
| Primary Facility
 
| Primary Facility
| 02/10/2014
+
| 2014-02-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 1,046: Line 1,023:
 
| 2250957
 
| 2250957
 
| Primary Facility
 
| Primary Facility
| 03/05/2013
+
| 2013-03-05
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 1,053: Line 1,030:
 
| 2252437
 
| 2252437
 
| Primary Facility
 
| Primary Facility
| 03/10/2014
+
| 2014-03-10
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 1,060: Line 1,037:
 
| 2298104
 
| 2298104
 
| Primary Facility
 
| Primary Facility
| 08/20/2014
+
| 2014-08-20
 
| Drilling/Alteration
 
| Drilling/Alteration
 
| No Violations Noted
 
| No Violations Noted
Line 1,067: Line 1,044:
 
| 2311107
 
| 2311107
 
| Primary Facility
 
| Primary Facility
| 10/08/2014
+
| 2014-10-08
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 1,074: Line 1,051:
 
| 2408947
 
| 2408947
 
| Primary Facility
 
| Primary Facility
| 09/18/2015
+
| 2015-09-18
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 1,195: Line 1,172:
 
| 584177
 
| 584177
 
| 03/25/2010
 
| 03/25/2010
| 03/30/2010
+
| 2010-03-25
 
| 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling
 
| 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling
 
| Administrative
 
| Administrative
Line 1,203: Line 1,180:
 
| 587052
 
| 587052
 
| 05/12/2010
 
| 05/12/2010
| 08/31/2010
+
| 2010-05-12
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
| Administrative
 
| Administrative
Line 1,211: Line 1,188:
 
| 587053
 
| 587053
 
| 05/12/2010
 
| 05/12/2010
| 08/31/2010
+
| 2010-05-12
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
| 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment
 
| Administrative
 
| Administrative
Line 1,233: Line 1,210:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 03/30/2010
+
| 2010-03-30
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 1,241: Line 1,218:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 07/30/2010
+
| 2010-07-30
| 07/30/2010
+
| 2010-07-30
 
| style="text-align: right;" | $2,000.00
 
| style="text-align: right;" | $2,000.00
 
| style="text-align: right;" | $2,000.00
 
| style="text-align: right;" | $2,000.00
Line 1,251: Line 1,228:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/02/2010
+
| 2010-09-02
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 1,259: Line 1,236:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 01/10/2011
+
| 2011-01-10
| 01/10/2011
+
| 2011-01-10
 
| style="text-align: right;" | $7,500.00
 
| style="text-align: right;" | $7,500.00
 
| style="text-align: right;" | $7,500.00
 
| style="text-align: right;" | $7,500.00
Line 1,269: Line 1,246:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/02/2010
+
| 2010-09-02
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 1,277: Line 1,254:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 01/10/2011
+
| 2011-01-10
| 01/10/2011
+
| 2011-01-10
 
| style="text-align: right;" | $7,500.00
 
| style="text-align: right;" | $7,500.00
 
| style="text-align: right;" | $7,500.00
 
| style="text-align: right;" | $7,500.00
Line 1,289: Line 1,266:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 06:14, 2 August 2019

Well Details

Well ID: 37-111-20296
Loading map...
Country: United States
State: Pennsylvania
County: Somerset
Municipality: Addison Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 149069
Farm/Lease Name: PMG ALLEN UNIT 1H
License Status: Active
Spud Date: 2010-03-24
Permit Date: 2010-02-25
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.743583
Longitude: -79.357611

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 CHIEF OIL & GAS LLC 64,882.00 24 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 209,382.00 182 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 359,927.00 275 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 243,036.26 365 0.00 0 0.00 0
2017 LPR ENERGY LLC 172,572.00 343 0.00 0 0.00 0
2018 LPR ENERGY LLC 147,029.00 362 0.00 0 0.00 0
2019 LPR ENERGY LLC 56,072.00 88 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-A01 Drilling Fluid Waste (in Barrels) 700.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-S01 Drilling Fluid Waste (in Barrels) 350.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010-S02 Fracing Fluid Waste (in Barrels) 3,730.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-059-24067
2010-S02 Fracing Fluid Waste (in Barrels) 7,760.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2010-S02 Fracing Fluid Waste (in Barrels) 365.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010-S02 Fracing Fluid Waste (in Barrels) 12,439.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2010-S02 Fracing Fluid Waste (in Barrels) 495.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010-S02 Fracing Fluid Waste (in Barrels) 240.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2010-S02 Produced Fluid (in Barrels) 4,729.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011-S02 Produced Fluid (in Barrels) 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011-S02 Produced Fluid (in Barrels) 15,378.00 Bbl INJECTION DISPOSAL WELL 34-121-2-3995
2011-S02 Produced Fluid (in Barrels) 946.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S01 Drilling Fluid Waste (in Barrels) 1,940.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012-S01 Fracing Fluid Waste (in Barrels) 6,059.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S01 Produced Fluid (in Barrels) 6,755.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2012-S02 Drill Cuttings (in Tons) 296.16 Tons LANDFILL 100419
2012-S02 Drilling Fluid Waste (in Barrels) 1,803.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012-S02 Produced Fluid (in Barrels) 56.00 Bbl INJECTION DISPOSAL WELL 34-121-23995
2013-S01 Drill Cuttings (in Tons) 492.74 Tons LANDFILL 100419
2013-S01 Drilling Fluid Waste (in Barrels) 355.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013-S02 Fracing Fluid Waste (in Barrels) 95.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Produced Fluid (in Barrels) 11.67 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Fracing Fluid Waste (in Barrels) 2,727.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2014-S02 Fracing Fluid Waste (in Barrels) 28.33 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Fracturing Fluid Waste (in Tons) 58.23 Tons LANDFILL 76-00-08
2014-S02 Produced Fluid (in Barrels) 70.83 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Fracing Fluid Waste (in Barrels) 4,304.17 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-S01 Fracing Fluid Waste (in Barrels) 13.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Fracturing Fluid Waste (in Tons) 23.48 Tons LANDFILL 100592
2015-S01 Fracturing Fluid Waste (in Tons) 0.11 Tons STORAGE PENDING DISPOSAL OR REUSE MID0209062814
2015-S01 Produced Fluid (in Barrels) 16.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-S01 Produced Fluid (in Barrels) 5,986.17 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 13.33 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2015-S02 Produced Fluid (in Barrels) 4,930.67 Bbl REUSE OTHER THAN ROAD SPREADING
2016-M04 Produced Fluid (in Barrels) RWC 802 104.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-M05 Produced Fluid (in Barrels) RWC 802 217.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-M06 Produced Fluid (in Barrels) RWC 802 200.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-M07 Produced Fluid (in Barrels) RWC 802 538.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-M08 Produced Fluid (in Barrels) RWC 802 262.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-M09 Produced Fluid (in Barrels) RWC 802 183.00 Bbl STORAGE PENDING DISPOSAL OR REUSE
2016-M10 Produced Fluid (in Barrels) RWC 802 228.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-M11 Produced Fluid (in Barrels) RWC 802 524.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-M12 Produced Fluid (in Barrels) RWC 802 615.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-S01 Produced Fluid (in Barrels) RWC 802 1,521.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017-M01 Produced Fluid (in Barrels) RWC 802 744.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M02 Produced Fluid (in Barrels) RWC 802 570.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M03 Produced Fluid (in Barrels) RWC 802 282.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-M03 Produced Fluid (in Barrels) RWC 802 442.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M04 Produced Fluid (in Barrels) RWC 802 523.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-M04 Produced Fluid (in Barrels) RWC 802 41.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M05 Produced Fluid (in Barrels) RWC 802 320.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-M06 Produced Fluid (in Barrels) RWC 802 528.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-M07 Produced Fluid (in Barrels) RWC 802 284.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-M08 Produced Fluid (in Barrels) RWC 802 202.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2017-M08 Produced Fluid (in Barrels) RWC 802 244.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M08 Produced Fluid (in Barrels) RWC 802 40.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017-M09 Produced Fluid (in Barrels) RWC 802 387.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017-M10 Produced Fluid (in Barrels) RWC 802 63.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017-M12 Produced Fluid (in Barrels) RWC 802 281.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M12 Produced Fluid (in Barrels) RWC 802 41.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-M01 Produced Fluid (in Barrels) RWC 802 529.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M01 Produced Fluid (in Barrels) RWC 802 162.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-M02 Produced Fluid (in Barrels) RWC 802 122.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-M03 Produced Fluid (in Barrels) RWC 802 611.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-M04 Produced Fluid (in Barrels) RWC 802 326.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-M05 Produced Fluid (in Barrels) RWC 802 245.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-M06 Produced Fluid (in Barrels) RWC 802 136.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-M07 Produced Fluid (in Barrels) RWC 802 45.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-M07 Produced Fluid (in Barrels) RWC 802 22.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M07 Produced Fluid (in Barrels) RWC 802 196.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-M08 Produced Fluid (in Barrels) RWC 802 76.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-M08 Produced Fluid (in Barrels) RWC 802 791.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-M09 Produced Fluid (in Barrels) RWC 802 491.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-M10 Produced Fluid (in Barrels) RWC 802 264.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-M10 Produced Fluid (in Barrels) RWC 802 533.00 Bbl REUSE (AT WELL PAD)
2018-M11 Produced Fluid (in Barrels) RWC 802 151.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018-M11 Produced Fluid (in Barrels) RWC 802 152.00 Bbl REUSE (AT WELL PAD)
2018-M12 Produced Fluid (in Barrels) RWC 802 513.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018-M12 Produced Fluid (in Barrels) RWC 802 27.00 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Barrels) RWC 802 620.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2019-M02 Produced Fluid (in Barrels) RWC 802 579.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2019-M03 Produced Fluid (in Barrels) RWC 802 487.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1873366 Primary Facility 2010-03-25 Drilling/Alteration Violation(s) Noted At the time of inspection, no E&S or IW discharge issues at the site. Chief gave notification of drilling on 3/24/10. Upon arrival, drill rig completed the installation of conductor and surface casing and was removed from site. The log book was located in the entrance way mail box with the frac transportation hour¿s invoice. On the cover of the log, Ziegenfuss noted 3/23/10 start date. DEP confirmed start date with drilling company (Ziegenfuss Drilling (908-788-5100). Chief failed to notify DEP prior to 24 hr notification. E/S plan and sign at the entrance of the access road. Sign was missing permit number. E/S plan was missing site plot and E&S controls plan. Additional site activity was occurring around pad with no E/S plans and limited E/S controls. On the site pad, two locations of oil staining/oil loss to the ground from location of where the drill rigs would be located. No attempt was made to clean the oil release
1877308 Primary Facility 2010-04-08 Routine/Complete Inspection No Violations Noted Drilling was ongoing at the time of the inspection. Below grade pit located onsite and it had more than the required two feet of lined freeboard. Observed no accelerated erosion & sedimentation in relation to the access road or well-site. All erosion control BMP¿s appeared to have been implemented properly. Noted that earthmoving activity was ongoing adjacent to the drill pad. Spoke with operator Matt Barch via phone regarding this matter and he stated that this was work to construct the frac pit and that an ESCGP-1 covering this activity was obtained and was with the contractor performing site construction at that time.
1880296 Primary Facility 2010-04-23 Drilling/Alteration No Violations Noted At the time of inspection, no E&S and IW issues. Pit aligned with 20 mil plastic aligned drilling pit and frac pit aligned also and security fence. No free board issues with pit. Well connected production equipment. Swab rig was present at the wellhead. Heavy equipment was on-site to start restoring site and pits.
1884554 Primary Facility 2010-05-12 Routine/Complete Inspection Violation(s) Noted At the time of inspection, the well was drilled not yet in production. Site was properly signed with E&S plan. Violations were noted. Two foot pit freeboard was exceeded on pit and IW was released onto the ground outside of pit. Noted various bmp¿s were installed filter sox¿s, diversion ditches, sediment traps, as well as an infiltration berm, which appeared to be functioning properly. Although it is recommend that additional rock or other stabilizer be added to diversion ditches leading to sediment trap(s) to prevent soil erosion into channel. Access road appeared stable and free of E&S issues.
1918459 Primary Facility 2010-10-06 Complaint Inspection No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Pit aligned with proper plastic and no freeboard issues. Keystone Vacuum was removing fluids from pit. E&S controls were in place. Chief was in the process of flow back and flaring gas well from Fracking procedure. Due to Chief policy of ¿fire retardation suites¿, DEP was not allowed to enter the site pad but was able to view the flare and site conditions from the Security station. Based on visual view of the site, the flame was showing no smoke or air quality problems. The site showed no signs of stress vegetation or air quality problems. DEP called Chief (JD Slater ¿ Compliance Manager). He reviewed the log for Sunday and showed no reports of site air quality concerns.
1922566 Primary Facility 2010-10-13 Complaint Inspection No Violations Noted Well site properly signed with ES plan available for review during inspection. No accelerated erosion or sedimentation issues noted with well site, access road, or impoundment. Culverts, ditches, and sediment traps sufficiently rocked and functioning. Observed large amounts of sand atop pad. No pits on site, only frac tanks. No observation of industrial discharge. Operator actively repairing a ¿minor¿ leak on well head during our well inspection. Well fraced in Aug and recently burnt off (flared). Site was being monitored by security 24hrs a day. Accompanied by WQS Dana Burk, and WQSS Ed Ritzer.
1922591 Primary Facility 2010-10-14 Routine/Complete Inspection No Violations Noted Operator should correct API # on sign, Frac pit w/ adequate free board
1969535 Primary Facility 2011-04-29 Routine/Complete Inspection No Violations Noted At the time of inspection, valid site Id sign, ES plan, and ESCGP-1 located onsite. Site gated from third party access (, but pipeline installation ongoing during inspection). Access road stable, no accelerated ES issues. Well pad adequately stabilized with rock. Drilling completed 05/06/10. Two brine tanks located onsite and surrounded by containment unit. Disturbed areas have been seeded/mulched operator may need to reseed/mulch to achieve uniform vegetative cover; no accelerated erosion or sedimentation issues noted. Temporary bmp¿s are in place and functioning; operator should continue to routinely monitor/maintain all bmp¿s until all earth disturbance activities been completed and final restoration (according to regulation) is achieved. No industrial waste issues observed.
1975389 Primary Facility 2011-04-26 Routine/Complete Inspection No Violations Noted well inactive. process of connecting pipeline
1986075 Primary Facility 2011-06-14 Administrative/File Review No Violations Noted review of inactive status. apporved
1997389 Primary Facility 2011-08-04 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. Well was in production. Well showing 3000 psi at wellhead and was connected to condensation unit followed by 2 ¿ 100 bbls brine tanks. Both units located in a containment area. DEP representatives present were Paul Wyrwas and Marc Maestra. Marc inspected the site pad and perimeter of the site pad and found no issues.
1997539 Primary Facility 2011-08-04 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection. Paul Wyrwas was present during inspection.
2016289 Primary Facility 2011-11-03 Routine/Complete Inspection No Violations Noted During this inspection, Site ID sign, ES plan, ESCGP-1, and PPC Plan present. Site gated. Access road stable. Well drilled and in production Two brine tanks located on site located in containment unit appear sound. No IW issues noted. Previously disturbed areas restored with adequate vegetative cover. Pad adequately rocked. No accelerated erosion or sedimentation issues noted onsite or access road. Noted large rock pile on back side of pad, recommend operator remove in order to prevent a possible pollution event. No violations noted at time of inspection.
2051538 Primary Facility 2012-03-14 Routine/Complete Inspection No Violations Noted Site visit was part of routine inspection.
2067339 Primary Facility 2012-05-04 Routine/Complete Inspection No Violations Noted
2069244 Primary Facility 2012-05-18 Routine/Complete Inspection No Violations Noted At the time of inspection the drill pit and cuttings contained within were being removed. The Department notes that the well pad area and the access road show no sign of accelerated erosion. The Department also notes the E&S plan was onsite, implemented as designed, and properly maintained.
2070173 Primary Facility 2012-05-10 Routine/Complete Inspection No Violations Noted At the time of this inspection, well site Id sign, ES plan ,and PPC plan present. Access road entrance and roadway stable. Site gated and guarded by 24hr security.
2076225 Primary Facility 2012-06-13 Routine/Complete Inspection No Violations Noted At the time of this inspection, well site Id sign, ES plan ,and PPC plan present. Access road entrance and roadway stable. Site gated and guarded by 24hr security.It appears that site and previously disturbed areas have been stabilized no accelerated erosion or sedimentation issues noted. Bmp's implemented and maintained. Chevron removed a drill pit previously encapsulated by former well owners. Chevron chose to dispose of previously encapsulated pit offsite prior to drilling additional wells on this location. Pit contents and liner have been removed offsite, operator agreed to supply department with manifests for all materials removed from pit (including liner)--operator unable to account for liquid removal prior to encapsulation as it was handled by previous owner. Operator also has plans to file an Amended Restoration Report to indicate that the previously encapsulated pit has been removed off site. Based on current observation, dept concurred w/ opr proceeding w/ plans to backfill pit, it visibly appears contimanted soils/materials removed
2078166 Primary Facility 2012-06-20 Routine/Complete Inspection No Violations Noted Inspection result of operators notification that previously encapsulated pit has been successfully removed and backfilled. During today's inspection, department noted that area of previously encapsulated pit had been back filled with clean fill material, but due to recent heavy rains it appears that soil has "settled." Due soft nature of the fill it was recommended that operator add additional fill prior to rocking area to ensure that material is properly compacted and stabilized as operator has plans to drill another well on location and drill rig may be placed over area recently back filled. Again, department is currently awaiting final response from operator including disposal records, amended restoration report, as well as written report on activities undertaken for removal of previously encapsulated drill pit.
2088107 Primary Facility 2012-08-01 Routine/Complete Inspection No Violations Noted Routine inspection. The site was without issues.
2092836 Primary Facility 2012-05-24 Routine/Complete Inspection No Violations Noted Gas well was in production. No E&S issues were present during the inspection.
2093088 Primary Facility 2012-06-21 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2094698 Primary Facility 2012-08-06 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2094798 Primary Facility 2012-08-14 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2095561 Primary Facility 2012-08-28 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2107615 Primary Facility 2012-10-09 Routine/Complete Inspection No Violations Noted At the time of inspection the Operator indicated that a cast iron plug was set in the well to prepare for additional wells to be drilled. The Erosion and Sedimentation plan was onsite and appeared to installed as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad area or access road. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site is maintained.
2120846 Primary Facility 2012-11-30 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
2121603 Primary Facility 2012-11-28 Routine/Complete Inspection No Violations Noted Inspection result of spud notification. Multi-well pad.
2123089 Primary Facility 2012-11-12 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
2128475 Primary Facility 2012-12-17 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
2128645 Primary Facility 2013-01-08 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production.
2130307 Primary Facility 2013-01-14 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Conductor was set in well and Chevron was drilling 5H well.
2136131 Primary Facility 2013-01-31 Incident- Response to Accident or Event In Compliance with Policy Admin Ispt. Spoke to Chevron representative Curtis Small via phone on 1/31/13. According to Mr. Small, on 1/30/13 while HWR company was loading excavator parked where access road branches off towards impoundment, hydraulic line burst, spilling approximately two quarts of hydraulic oil onto access road. Spill was immediately soaked up and the impacted gravel shoveled into drum. Samples taken, will dispose of in landfill. It appears situation was handled according to policy and a follow-up inspection will be conducted in future to ensure full compliance.
2143461 Primary Facility 2013-02-11 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 6H.
2143507 Primary Facility 2013-02-22 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 6H.
2144627 Primary Facility 2013-02-25 Routine/Complete Inspection No Violations Noted Multi-well pad. Site ID sign, valid permit, E&S plan, ESCGPI, PPC plan all present.. Security on-site.At time of inspection, in process of skidding rig to resume drilling. 1H had been drilled. 2H, 3H, 4H, 5H, 6H all spudded, TDs not yet reached.Observed small staining on gravel on front edge of rig containment when standing at DSM trailer and noted large snow/gravel pile against brine tanks in back corner of pad which could lead to a potential pollution event by falling into ditches after thawing.Spoke to DSM Ken Silvis who agreed to place the affected gravel on containment and agreed to remove the snow pile.Noted erosion issue from previous inspection on 11/28/12 (ID 2121603) was addressed by utilizing an erosion blanket for stabilization and removing sediment from ditch.Rig and on-site tanks on containment. Tanks and containment appear structurally sound. Access road adequately rocked and no accelerated E&S issues were noted in relation to well pad or access road. Department recommends that Operator remove debris from rock-lined ditches.
2151599 Primary Facility 2013-03-13 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 3H.
2168502 Primary Facility 2013-05-22 Routine/Complete Inspection No Violations Noted Met with Curtis Small with Chevron and inspected the site. No issues were noted.
2169711 Primary Facility 2013-05-22 Routine/Complete Inspection No Violations Noted
2173629 Primary Facility 2013-06-10 Routine/Complete Inspection No Violations Noted Routine inspection no issues noted.
2228147 Primary Facility 2013-11-26 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 4H.
2228305 Primary Facility 2013-10-31 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production. Chevron was drilling gas well 3H.
2228693 Primary Facility 2013-10-09 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was drilling well 3H
2229875 Primary Facility 2013-09-26 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was setting up drilling for well 4H.
2235790 Primary Facility 2014-01-13 Routine/Complete Inspection No Violations Noted On 1/13/14 inspected this 6 well, well pad. The weather the day of the inspection was unusually warm and wet.
2244496 Primary Facility 2014-02-10 Routine/Complete Inspection No Violations Noted Met with Curtis Small and inspected the well pad. Chevron propsed aded an aditional ramp tp allow the pipeline company access to their well controls. The access road will be temporary.
2250957 Primary Facility 2013-03-05 Routine/Complete Inspection No Violations Noted On 3/5/14 met with Joe Brusco with Chevron and inspected the site.
2252437 Primary Facility 2014-03-10 Routine/Complete Inspection No Violations Noted On 3/10/14 met with Alex Grant with Chevron and inspected the site.
2298104 Primary Facility 2014-08-20 Drilling/Alteration No Violations Noted At the time of inspection, no E&S issues were present at the site. Chevron was in process of fracking well 5H. Well 1H was temporary shut in. Wells 4HA, 3H and 6H have been completed. Well 2H will be completed the following week.
2311107 Primary Facility 2014-10-08 Routine/Complete Inspection No Violations Noted Work was underway to equip a well for production. A coil tubing rig was located onsite. Secondary containment was located on the well pad and there were 10 green and 4 red trailer tanks located onsite on top of the containment. There was no observed accelerated erosion or sedimentation in relation to the site or access road. It was noted that above and on either side of the site there was a cultivated crop field with soybeans.
2408947 Primary Facility 2015-09-18 Routine/Complete Inspection No Violations Noted At time of inspection, well tag present and legible.
2486256 Primary Facility 2016-05-19 Routine/Complete Inspection No Violations Noted system running. no issues
2532203 Primary Facility 2016-10-05 Routine/Complete Inspection No Violations Noted no issues. gas wells productions
2549713 Primary Facility 2016-12-29 Routine/Complete Inspection No Violations Noted Multi-well Marcellus pad.

Site ID sign, E&S plan, PPC plan and ERP on site. At time of inspection no E&S issues observed on access road. Well pad gated. Pad rocked. Well tag present and legible. Brine tank located in secondary containment appears structurally sound. Department observed discharge from tank secondary containment onto well pad. See Inspection Record #2549692.

2594467 Primary Facility 2017-04-15 Routine/Complete Inspection No Violations Noted system running,. no issues
2594580 Primary Facility 2017-05-16 Routine/Complete Inspection No Violations Noted system running. no issues
2626051 Primary Facility 2017-08-16 Routine/Complete Inspection No Violations Noted system running. no issues.
2656126 Primary Facility 2017-11-02 Routine/Complete Inspection No Violations Noted System running no,issues
2672028 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted System running
2672068 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted Well appears to be in production. Well tender Matt Gary on site during inspection. DEP OGI P Wyrwas on site during inspection.
2685362 Primary Facility 2018-01-23 Routine/Complete Inspection No Violations Noted System producing. Emergency contact present. Well tag present.
2700747 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Well tag present and emergency contact information present. No issues at the site
2700825 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Multi-well site. Well pad gated. Well appears to be in production. Three brine tanks on site. Water truck on site during inspection.
2719552 Primary Facility 2018-04-18 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Three brine tanks on site. Barrell located near brine tank labeled spill kit. Container labeled methanol located in secondary containment.
2766909 Primary Facility 2018-08-23 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Three brine tanks on site. Department contacted operator rep Matt Gary by phone regarding potential E and S issues on access road and well pad. Mr. Gary states the access road and well pad areas will be inspected and any E and S issues will be addressed.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1873366 584177 03/25/2010 2010-03-25 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling Administrative
1884554 587052 05/12/2010 2010-05-12 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative
1884554 587053 05/12/2010 2010-05-12 78.56FRBRD - Failure to maintain 2' freeboard in an impoundment Administrative

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
584177 256440 NOV - Notice of Violation Comply/Closed 2010-03-30
584177 260784 CACP - Consent Assessment of Civil Penalty Comply/Closed 2010-07-30 2010-07-30 $2,000.00 $2,000.00
587052 257711 NOV - Notice of Violation Comply/Closed 2010-09-02
587052 266666 CACP - Consent Assessment of Civil Penalty Comply/Closed 2011-01-10 2011-01-10 $7,500.00 $7,500.00
587053 257711 NOV - Notice of Violation Comply/Closed 2010-09-02
587053 266666 CACP - Consent Assessment of Civil Penalty Comply/Closed 2011-01-10 2011-01-10 $7,500.00 $7,500.00

For data sources see[6]

References