X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-115-21286"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-115-21286
 
| Well ID: 37-115-21286
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.910025, -75.656117 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.910025, -75.656117 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 23: Line 23:
 
| Spud Date:  
 
| Spud Date:  
 
|-
 
|-
| Permit Date: 6/12/2013
+
| Permit Date: 2013-06-12
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
<!--== Production Data ==
 
<!--== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 84: Line 109:
 
| 2164173
 
| 2164173
 
| Primary Facility
 
| Primary Facility
| 04/19/2013
+
| 2013-04-19
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 143: Line 168:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 09:21, 2 August 2019

Well Details

Well ID: 37-115-21286
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: New Milford Township
Operator Name: SWN PROD CO LLC
Well Pad ID:
Farm/Lease Name: TONYA EAST 5H
License Status:
Spud Date:
Permit Date: 2013-06-12
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.910025
Longitude: -75.656117

For data sources see[1][2][3]


Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2164173 Primary Facility 2013-04-19 Routine/Complete Inspection No Violations Noted pre-operations
2493532 Primary Facility 2016-06-13 Routine/Partial Inspection No Violations Noted

The Department was on site at the Tonya East 4H (#13 Pad) Well Site to conduct a Routine Partial Inspection. At the time of the inspection, the E&S Inspection Log indicated that Klemish conducted an inspection on 6/13/16 and that no attention was needed at the site. The E&S Plan Map had several redlines added to it and it also noted that the highlighted filter sock has been replaced with wood chip filter berms, all of the filter sock has been removed on the well site, and that the protective fence has also been removed. The Department walked the site and noted that the site appeared to meet temporary stabilization requirements.

2574266 Primary Facility 2017-03-21 Routine/Complete Inspection No Violations Noted The Department was on site to conduct an inspection. The E&S Inspection Log Site Checklist indicated that Ryan Klemish conducted the most recent inspection on 3/17/17. Upon my arrival I spoke to the gate guard but explained that I would only be inspecting the area along the access road where a crew was working. The site is currently being hydraulically fractured.

I spoke with Ed Stone and "Smoke" (Linde) who explained that they were repairing an area where a snow plow impacted the E&S controls. No obvious issues were discovered. The site was covered in approximately 2' of snow during the inspection.

2578173 Primary Facility 2017-03-23 Follow-up Inspection No Violations Noted The Department was on site to follow up on the Department's 3/21/17 inspection. The Department only inspected the area adjacent to the access road where the E&S controls were damaged.

For data sources see[4]

References