X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-115-22392"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-115-22392
 
| Well ID: 37-115-22392
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.787331, -75.957872 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.787331, -75.957872 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 05/22/2018
+
| Spud Date: 2018-05-22
 
|-
 
|-
| Permit Date: 10/31/2017
+
| Permit Date: 2017-10-31
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 45: Line 45:
 
  | accessdate = 2019-05-16 }}</ref><ref>{{cite web
 
  | accessdate = 2019-05-16 }}</ref><ref>{{cite web
 
  | title = Oil and Gas Well Pad Report
 
  | title = Oil and Gas Well Pad Report
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-05-20
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Operator Name
 
!scope="col" | Gas Quantity (mcf)
 
!scope="col" | Gas Production Days
 
!scope="col" | Oil Quantity (bbl)
 
!scope="col" | Oil Production Days
 
!scope="col" | Water Quantity (bbl)
 
!scope="col" | Water Production Days
 
|-
 
| 2018
 
| [[CABOT OIL & GAS CORP]]
 
| style="text-align: right;" | 1,474,288.00
 
| style="text-align: right;" | 75
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
| 2019
 
| [[CABOT OIL & GAS CORP]]
 
| style="text-align: right;" | 1,512,014.00
 
| style="text-align: right;" | 90
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Production Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Waste Data ==
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Disposal Method
 
!scope="col" | Waste Facility ID
 
|-
 
| 2018-06
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 301.24 Tons
 
| LANDFILL
 
| 101247
 
|-
 
| 2018-06
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 3.20 Tons
 
| LANDFILL
 
| 101247
 
|-
 
| 2018-07
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 1,261.28 Tons
 
| LANDFILL
 
| 101247
 
|-
 
| 2018-08
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 12.69 Tons
 
| LANDFILL
 
| 101247
 
|-
 
| 2018-09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2.39 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2018-09
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| style="text-align: right;" | 0.05 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| 301333
 
|-
 
| 2018-09
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 0.73 Tons
 
| LANDFILL
 
| 101247
 
|-
 
| 2018-09
 
| Unused Fracturing Fluid Waste (in Tons) RWC 805
 
| style="text-align: right;" | 2.43 Tons
 
| LANDFILL
 
| 101247
 
|-
 
| 2018-09
 
| Waste Water Treatment Sludge (in Tons) RWC 804
 
| style="text-align: right;" | 8.96 Tons
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-10
 
| Other Oil & Gas Wastes (in Tons) RWC 899
 
| style="text-align: right;" | 0.09 Tons
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| 301333
 
|-
 
| 2018-10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 19,626.17 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2018-10
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 13.20 Tons
 
| LANDFILL
 
| 101247
 
|-
 
| 2018-10
 
| Waste Water Treatment Sludge (in Tons) RWC 804
 
| style="text-align: right;" | 104.90 Tons
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 10,509.83 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2018-11
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 5.63 Tons
 
| LANDFILL
 
| 101247
 
|-
 
| 2018-11
 
| Waste Water Treatment Sludge (in Tons) RWC 804
 
| style="text-align: right;" | 39.08 Tons
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 4,548.01 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2018-12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 43.48 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,864.75 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2019-01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 210.06 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE004
 
|-
 
| 2019-02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,123.61 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
| 2019-03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,887.37 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NE002
 
|-
 
|}
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Waste Reports
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-03-31
 
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
| accessdate = 2019-05-21 }}</ref>
 
== Inspection Data ==
 
==== Inspections Performed ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Inspection Category
 
!scope="col" | Inspection Date
 
!scope="col" | Inspection Type
 
!scope="col" | Inspection Result
 
!scope="col" | Inspection Comments
 
|-
 
| 2733202
 
| Primary Facility
 
| 2018-05-21
 
| Preoperation Inspection
 
| No Violations Noted
 
| Casey Baldwin and I performed a preop inspection on the Moore S pad.  The perimeter BMPs were all in place and operational, despite recent torrential rains.  The pad was under construction at the time of inspection.  The RCE was in place as was the entrance culvert.  The tank pad was not constructed yet however the perimeter BMPs were all installed.  I approve this preoperational inspection.  The wells associated with this site are the 115-22392- 115-22393, 115-22394 and 115-22395.
 
 
There were no violations.
 
|-
 
| 2733738
 
| Primary Facility
 
| 2018-05-23
 
| Drilling/Alteration
 
| No Violations Noted
 
| At time of inspection.
 
Met with company man Larry Cheatwood.
 
United Drilling was on site to drill and run the conductor pipe for the 2H, 4H, 6H and 8H wells.
 
The 2H was at TD at 103'.
 
There was an auger rig on the 4H at a depth of 20'.
 
The 6H was at a depth of 46'.
 
There was an air rig on the 8H at a depth of 84'.
 
The TD for all the wells will be 103'.
 
I took a walk around the location and there were no obvious concerns noticed.
 
There were no violations noted.
 
|-
 
| 2752373
 
| Primary Facility
 
| 2018-07-17
 
| Drilling/Alteration
 
| No Violations Noted
 
| At time of inspection.
 
Met with company man Tony Ketterling.
 
Nabors X36 rig was on site and finished drilling the vertical section of the well and pulled the pipe to put on there curve assembly.
 
There are four wells on site to be drilled, the surface and intermediate casings have been drilled and set on all four wells.
 
They are on the third well out of the four.
 
They drilled with WBM to 4939' then circulated the WBM out and loaded the hole with DOBM for the curve and lateral section of the well.
 
The proposed TD for the well is 18462'.
 
I took a walk around the location and there were no obvious concerns noticed.
 
There were no violations noted.
 
|-
 
| 2771560
 
| Primary Facility
 
| 2018-09-06
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| At time of inspection.
 
Met with company men Steve Barrett and Larry Fulmer.
 
Keane was on site to frac the 2H, 4H, 6H and 8H wells.
 
They were stimulating stage 32 out of 66 stages on the 8H and running a plug and perf in the 4H when I arrived on site.
 
There were 23 stages completed out of 59 on the 2H.
 
There were 29 stages completed out of 67 on the 4H.
 
There were 32 stages completed out of 70 on the 6H.
 
The water was being trucked to the site.
 
I took a walk around the location and there were no obvious concerns noticed.
 
There were no violations noted.
 
|-
 
| 2805974
 
| Primary Facility
 
| 2018-11-21
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| At time of inspection.
 
The well was recently completed and put in production.
 
The well tag was on the well and correct.
 
There was water 7.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar.
 
The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank.                                                                                                                                                                                                       
 
There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector  that was calibrated on 11/2/18. 
 
The production fluid was going to a 500bbl tank on containment and the containment appeared to be in good condition.
 
There were 16 empty 500bbl tanks that were used during the frac, 12 of those tanks were cleaned and not on containment and the other 4 tanks were on containment and the containment appeared to be in good condition.
 
|-
 
|}
 
<!--==== Violations Commited ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Inspection ID
 
!scope="col" | Violation ID
 
!scope="col" | Violation Date
 
!scope="col" | Date Resolved
 
!scope="col" | Violation Code
 
!scope="col" | Violation Type
 
!scope="col" | Violation Comments
 
|-
 
|}-->
 
<!--==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Penalty ID
 
!scope="col" | Penalty Code
 
!scope="col" | Penalty Status
 
!scope="col" | Penalty Date
 
!scope="col" | Enforcement Date
 
!scope="col" | Penalty Amount
 
!scope="col" | Amount Collected
 
|-
 
|}-->
 
For data sources see<ref>{{cite web
 
| title =Oil and Gas Compliance Report
 
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
|publisher = [[Pennsylvania Department of Environmental Protection]]
 
| date = 2019-05-20
 
| date = 2019-05-20
Line 353: Line 60:
 
|-
 
|-
 
| 1
 
| 1
| 08/23/2018
+
| 2018-08-23
| 09/23/2018
+
| 2018-09-23
 
| style="text-align: right;" | 6556.3
 
| style="text-align: right;" | 6556.3
 
| style="text-align: right;" | 25,253,600.0
 
| style="text-align: right;" | 25,253,600.0
Line 545: Line 252:
 
| style="text-align: right;" | 184.141
 
| style="text-align: right;" | 184.141
 
|-
 
|-
| quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides
+
| quaternary ammonium compounds,<br/> benzyl-C12-16-alkyldimethyl, chlorides
 
| 68424-85-1
 
| 68424-85-1
 
| style="text-align: right;" | 5.3
 
| style="text-align: right;" | 5.3
Line 633: Line 340:
 
| style="text-align: right;" | 1710.96
 
| style="text-align: right;" | 1710.96
 
|-
 
|-
| quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides
+
| quaternary ammonium compounds,<br/> benzyl-C12-16-alkyldimethyl, chlorides
 
| 68424-85-1
 
| 68424-85-1
 
| style="text-align: right;" | 5.3
 
| style="text-align: right;" | 5.3
Line 667: Line 374:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
== Production Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Operator Name
 +
!scope="col" | Gas Quantity (mcf)
 +
!scope="col" | Gas Production Days
 +
!scope="col" | Oil Quantity (bbl)
 +
!scope="col" | Oil Production Days
 +
!scope="col" | Water Quantity (bbl)
 +
!scope="col" | Water Production Days
 +
|-
 +
| 2018
 +
| [[CABOT OIL & GAS CORP]]
 +
| style="text-align: right;" | 1,474,288.00
 +
| style="text-align: right;" | 75
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[CABOT OIL & GAS CORP]]
 +
| style="text-align: right;" | 1,512,014.00
 +
| style="text-align: right;" | 90
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Production Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Waste Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Period
 +
!scope="col" | Waste Type
 +
!scope="col" | Quantity
 +
!scope="col" | Disposal Method
 +
!scope="col" | Waste Facility ID
 +
|-
 +
| 2018-M06
 +
| Drill Cuttings (in Tons) RWC 810
 +
| style="text-align: right;" | 301.24 Tons
 +
| LANDFILL
 +
| 101247
 +
|-
 +
| 2018-M06
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 3.20 Tons
 +
| LANDFILL
 +
| 101247
 +
|-
 +
| 2018-M07
 +
| Drill Cuttings (in Tons) RWC 810
 +
| style="text-align: right;" | 1,261.28 Tons
 +
| LANDFILL
 +
| 101247
 +
|-
 +
| 2018-M08
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 12.69 Tons
 +
| LANDFILL
 +
| 101247
 +
|-
 +
| 2018-M09
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 2.39 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE002
 +
|-
 +
| 2018-M09
 +
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 +
| style="text-align: right;" | 0.05 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 301333
 +
|-
 +
| 2018-M09
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 0.73 Tons
 +
| LANDFILL
 +
| 101247
 +
|-
 +
| 2018-M09
 +
| Unused Fracturing Fluid Waste (in Tons) RWC 805
 +
| style="text-align: right;" | 2.43 Tons
 +
| LANDFILL
 +
| 101247
 +
|-
 +
| 2018-M09
 +
| Waste Water Treatment Sludge (in Tons) RWC 804
 +
| style="text-align: right;" | 8.96 Tons
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018-M10
 +
| Other Oil & Gas Wastes (in Tons) RWC 899
 +
| style="text-align: right;" | 0.09 Tons
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| 301333
 +
|-
 +
| 2018-M10
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 19,626.17 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE002
 +
|-
 +
| 2018-M10
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 13.20 Tons
 +
| LANDFILL
 +
| 101247
 +
|-
 +
| 2018-M10
 +
| Waste Water Treatment Sludge (in Tons) RWC 804
 +
| style="text-align: right;" | 104.90 Tons
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018-M11
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 10,509.83 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE002
 +
|-
 +
| 2018-M11
 +
| Synthetic Liner Materials (in Tons) RWC 806
 +
| style="text-align: right;" | 5.63 Tons
 +
| LANDFILL
 +
| 101247
 +
|-
 +
| 2018-M11
 +
| Waste Water Treatment Sludge (in Tons) RWC 804
 +
| style="text-align: right;" | 39.08 Tons
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2018-M12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 4,548.01 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE002
 +
|-
 +
| 2018-M12
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 43.48 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 +
|-
 +
| 2019-M01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 2,864.75 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE002
 +
|-
 +
| 2019-M01
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 210.06 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE004
 +
|-
 +
| 2019-M02
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 2,123.61 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE002
 +
|-
 +
| 2019-M03
 +
| Produced Fluid (in Barrels) RWC 802
 +
| style="text-align: right;" | 1,887.37 Bbl
 +
| RESIDUAL WASTE PROCESSING FACILITY
 +
| WMGR123NE002
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Waste Reports
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-03-31
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 +
== Inspection Data ==
 +
==== Inspections Performed ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Inspection Category
 +
!scope="col" | Inspection Date
 +
!scope="col" | Inspection Type
 +
!scope="col" | Inspection Result
 +
!scope="col" | Inspection Comments
 +
|-
 +
| 2733202
 +
| Primary Facility
 +
| 2018-05-21
 +
| Preoperation Inspection
 +
| No Violations Noted
 +
| Casey Baldwin and I performed a preop inspection on the Moore S pad.  The perimeter BMPs were all in place and operational, despite recent torrential rains.  The pad was under construction at the time of inspection.  The RCE was in place as was the entrance culvert.  The tank pad was not constructed yet however the perimeter BMPs were all installed.  I approve this preoperational inspection.  The wells associated with this site are the 115-22392- 115-22393, 115-22394 and 115-22395.
 +
 +
There were no violations.
 +
|-
 +
| 2733738
 +
| Primary Facility
 +
| 2018-05-23
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At time of inspection.
 +
Met with company man Larry Cheatwood.
 +
United Drilling was on site to drill and run the conductor pipe for the 2H, 4H, 6H and 8H wells.
 +
The 2H was at TD at 103'.
 +
There was an auger rig on the 4H at a depth of 20'.
 +
The 6H was at a depth of 46'.
 +
There was an air rig on the 8H at a depth of 84'.
 +
The TD for all the wells will be 103'.
 +
I took a walk around the location and there were no obvious concerns noticed.
 +
There were no violations noted.
 +
|-
 +
| 2752373
 +
| Primary Facility
 +
| 2018-07-17
 +
| Drilling/Alteration
 +
| No Violations Noted
 +
| At time of inspection.
 +
Met with company man Tony Ketterling.
 +
Nabors X36 rig was on site and finished drilling the vertical section of the well and pulled the pipe to put on there curve assembly.
 +
There are four wells on site to be drilled, the surface and intermediate casings have been drilled and set on all four wells.
 +
They are on the third well out of the four.
 +
They drilled with WBM to 4939' then circulated the WBM out and loaded the hole with DOBM for the curve and lateral section of the well.
 +
The proposed TD for the well is 18462'.
 +
I took a walk around the location and there were no obvious concerns noticed.
 +
There were no violations noted.
 +
|-
 +
| 2771560
 +
| Primary Facility
 +
| 2018-09-06
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At time of inspection.
 +
Met with company men Steve Barrett and Larry Fulmer.
 +
Keane was on site to frac the 2H, 4H, 6H and 8H wells.
 +
They were stimulating stage 32 out of 66 stages on the 8H and running a plug and perf in the 4H when I arrived on site.
 +
There were 23 stages completed out of 59 on the 2H.
 +
There were 29 stages completed out of 67 on the 4H.
 +
There were 32 stages completed out of 70 on the 6H.
 +
The water was being trucked to the site.
 +
I took a walk around the location and there were no obvious concerns noticed.
 +
There were no violations noted.
 +
|-
 +
| 2805974
 +
| Primary Facility
 +
| 2018-11-21
 +
| Routine/Complete Inspection
 +
| No Violations Noted
 +
| At time of inspection.
 +
The well was recently completed and put in production.
 +
The well tag was on the well and correct.
 +
There was water 7.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar.
 +
The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank.                                                                                                                                                                                                       
 +
There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector  that was calibrated on 11/2/18. 
 +
The production fluid was going to a 500bbl tank on containment and the containment appeared to be in good condition.
 +
There were 16 empty 500bbl tanks that were used during the frac, 12 of those tanks were cleaned and not on containment and the other 4 tanks were on containment and the containment appeared to be in good condition.
 +
|-
 +
|}
 +
<!--==== Violations Commited ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Inspection ID
 +
!scope="col" | Violation ID
 +
!scope="col" | Violation Date
 +
!scope="col" | Date Resolved
 +
!scope="col" | Violation Code
 +
!scope="col" | Violation Type
 +
!scope="col" | Violation Comments
 +
|-
 +
|}-->
 +
<!--==== Penalties Applied ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Violation ID
 +
!scope="col" | Penalty ID
 +
!scope="col" | Penalty Code
 +
!scope="col" | Penalty Status
 +
!scope="col" | Penalty Date
 +
!scope="col" | Enforcement Date
 +
!scope="col" | Penalty Amount
 +
!scope="col" | Amount Collected
 +
|-
 +
|}-->
 +
For data sources see<ref>{{cite web
 +
| title =Oil and Gas Compliance Report
 +
|publisher = [[Pennsylvania Department of Environmental Protection]]
 +
| date = 2019-05-20
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2019-05-21 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>

Revision as of 11:19, 2 August 2019

Well Details

Well ID: 37-115-22392
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Jessup Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 154612
Farm/Lease Name: MOORE, S. 2
License Status: Active
Spud Date: 2018-05-22
Permit Date: 2017-10-31
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.787331
Longitude: -75.957872

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-08-23 2018-09-23 6556.3 25,253,600.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Acid Inhibitor, KAI-12 Keane Acid Inhibitor isoproyl alcohol 67-63-0 5 0.00003818 92.07
formic acid 64-18-6 10 0.00007635 184.141
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000152704 368.282
Cinnamaldehyde 104-55-2 10 0.00007635 184.141
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007635 184.141
Ethylene glycol 107-21-1 40 0.000305409 736.563
Ethoxylated alcohol 68131-39-5 10 0.00007635 184.141
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor Water 7732-18-5 95 0.0168848 40721.7
organic phosphonic salts 15827-60-8 15 0.00266603 6429.74
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 12.2531 29,551,200.0
Other Chemical(s) Listed Above See Trade Name(s) List didecyldimethylammonium chloride 7173-51-5 8 0.000709433 1710.96
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00101901 2457.57
ethanal 64-17-5 2.8 0.000249236 601.09
Glutaral 111-30-8 26.7 0.00237665 5731.83
Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0203801 49151.4
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000152704 368.282
Water 7732-18-5 7.5 0.017521 42256
organic phosphonic salts 15827-60-8 15 0.00266603 6429.74
Ethoxylated alcohol 68131-39-5 10 0.00007635 184.141
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007635 184.141
formic acid 64-18-6 10 0.00007635 184.141
Ammonium Chloride 12125-02-9 1.5 0.00152851 3686.36
Citric acid 77-92-9 30 0.000645153 1555.93
oleic acid diethanolamide 93-83-4 1.5 0.00152851 3686.36
isoproyl alcohol 67-63-0 5 0.00003818 92.07
Cinnamaldehyde 104-55-2 10 0.00007635 184.141
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000472659 1139.93
Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 7.5 0.017521 42256
Hydrochloric Acid 7647-01-0 15 0.0350421 84512.1
Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.000107526 259.323
Citric acid 77-92-9 30 0.000645153 1555.93
Friction Reducer, KFR-16FW Keane Friction Reducer Ammonium Chloride 12125-02-9 1.5 0.00152851 3686.36
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00101901 2457.57
oleic acid diethanolamide 93-83-4 1.5 0.00152851 3686.36
Water 7732-18-5 60 0.0611404 147454
Petroleum distillate, Hydrotreated Light 64742-47-8 20 0.0203801 49151.4
Biocide, MBC-516 Keane Biocide Glutaral 111-30-8 26.7 0.00237665 5731.83
didecyldimethylammonium chloride 7173-51-5 8 0.000709433 1710.96
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000472659 1139.93
ethanal 64-17-5 2.8 0.000249236 601.09
Water 7732-18-5 56.7 0.00504881 12176.4
Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.3818 210,741,000.0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 CABOT OIL & GAS CORP 1,474,288.00 75 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 1,512,014.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-M06 Drill Cuttings (in Tons) RWC 810 301.24 Tons LANDFILL 101247
2018-M06 Synthetic Liner Materials (in Tons) RWC 806 3.20 Tons LANDFILL 101247
2018-M07 Drill Cuttings (in Tons) RWC 810 1,261.28 Tons LANDFILL 101247
2018-M08 Synthetic Liner Materials (in Tons) RWC 806 12.69 Tons LANDFILL 101247
2018-M09 Produced Fluid (in Barrels) RWC 802 2.39 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M09 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 0.05 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018-M09 Synthetic Liner Materials (in Tons) RWC 806 0.73 Tons LANDFILL 101247
2018-M09 Unused Fracturing Fluid Waste (in Tons) RWC 805 2.43 Tons LANDFILL 101247
2018-M09 Waste Water Treatment Sludge (in Tons) RWC 804 8.96 Tons REUSE (AT WELL PAD)
2018-M10 Other Oil & Gas Wastes (in Tons) RWC 899 0.09 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018-M10 Produced Fluid (in Barrels) RWC 802 19,626.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M10 Synthetic Liner Materials (in Tons) RWC 806 13.20 Tons LANDFILL 101247
2018-M10 Waste Water Treatment Sludge (in Tons) RWC 804 104.90 Tons REUSE (AT WELL PAD)
2018-M11 Produced Fluid (in Barrels) RWC 802 10,509.83 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M11 Synthetic Liner Materials (in Tons) RWC 806 5.63 Tons LANDFILL 101247
2018-M11 Waste Water Treatment Sludge (in Tons) RWC 804 39.08 Tons REUSE (AT WELL PAD)
2018-M12 Produced Fluid (in Barrels) RWC 802 4,548.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M12 Produced Fluid (in Barrels) RWC 802 43.48 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Barrels) RWC 802 2,864.75 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019-M01 Produced Fluid (in Barrels) RWC 802 210.06 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019-M02 Produced Fluid (in Barrels) RWC 802 2,123.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019-M03 Produced Fluid (in Barrels) RWC 802 1,887.37 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2733202 Primary Facility 2018-05-21 Preoperation Inspection No Violations Noted Casey Baldwin and I performed a preop inspection on the Moore S pad. The perimeter BMPs were all in place and operational, despite recent torrential rains. The pad was under construction at the time of inspection. The RCE was in place as was the entrance culvert. The tank pad was not constructed yet however the perimeter BMPs were all installed. I approve this preoperational inspection. The wells associated with this site are the 115-22392- 115-22393, 115-22394 and 115-22395.

There were no violations.

2733738 Primary Facility 2018-05-23 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Larry Cheatwood. United Drilling was on site to drill and run the conductor pipe for the 2H, 4H, 6H and 8H wells. The 2H was at TD at 103'. There was an auger rig on the 4H at a depth of 20'. The 6H was at a depth of 46'. There was an air rig on the 8H at a depth of 84'. The TD for all the wells will be 103'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2752373 Primary Facility 2018-07-17 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Tony Ketterling. Nabors X36 rig was on site and finished drilling the vertical section of the well and pulled the pipe to put on there curve assembly. There are four wells on site to be drilled, the surface and intermediate casings have been drilled and set on all four wells. They are on the third well out of the four. They drilled with WBM to 4939' then circulated the WBM out and loaded the hole with DOBM for the curve and lateral section of the well. The proposed TD for the well is 18462'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2771560 Primary Facility 2018-09-06 Routine/Complete Inspection No Violations Noted At time of inspection.

Met with company men Steve Barrett and Larry Fulmer. Keane was on site to frac the 2H, 4H, 6H and 8H wells. They were stimulating stage 32 out of 66 stages on the 8H and running a plug and perf in the 4H when I arrived on site. There were 23 stages completed out of 59 on the 2H. There were 29 stages completed out of 67 on the 4H. There were 32 stages completed out of 70 on the 6H. The water was being trucked to the site. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2805974 Primary Facility 2018-11-21 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was recently completed and put in production. The well tag was on the well and correct. There was water 7.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 11/2/18. The production fluid was going to a 500bbl tank on containment and the containment appeared to be in good condition. There were 16 empty 500bbl tanks that were used during the frac, 12 of those tanks were cleaned and not on containment and the other 4 tanks were on containment and the containment appeared to be in good condition.

For data sources see[7]

References