If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-115-22491 | | Well ID: 37-115-22491 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="15" | {{#display_map: 41.771450, -75.699997 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 21: | Line 21: | ||
| License Status: Active | | License Status: Active | ||
|- | |- | ||
− | | Spud Date: 07 | + | | Spud Date: 2018-07-02 |
|- | |- | ||
− | | Permit Date: | + | | Permit Date: 2018-03-22 |
|- | |- | ||
| Unconventional Well: Y | | Unconventional Well: Y | ||
Line 45: | Line 45: | ||
| accessdate = 2019-05-16 }}</ref><ref>{{cite web | | accessdate = 2019-05-16 }}</ref><ref>{{cite web | ||
| title = Oil and Gas Well Pad Report | | title = Oil and Gas Well Pad Report | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|publisher = [[Pennsylvania Department of Environmental Protection]] | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
| date = 2019-05-20 | | date = 2019-05-20 | ||
Line 324: | Line 60: | ||
|- | |- | ||
| 1 | | 1 | ||
− | | 12 | + | | 2018-12-22 |
− | | 01 | + | | 2019-01-13 |
| style="text-align: right;" | 7354 | | style="text-align: right;" | 7354 | ||
| style="text-align: right;" | 16,425,000.0 | | style="text-align: right;" | 16,425,000.0 | ||
Line 428: | Line 164: | ||
| style="text-align: right;" | 4021.87 | | style="text-align: right;" | 4021.87 | ||
|- | |- | ||
− | | quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides | + | | quaternary ammonium compounds,<br/> benzyl-C12-16-alkyldimethyl, chlorides |
| 68424-85-1 | | 68424-85-1 | ||
| style="text-align: right;" | 5.3 | | style="text-align: right;" | 5.3 | ||
Line 486: | Line 222: | ||
| rowspan="5"| Keane | | rowspan="5"| Keane | ||
| rowspan="5"| Biocide | | rowspan="5"| Biocide | ||
− | | quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides | + | | quaternary ammonium compounds,<br/> benzyl-C12-16-alkyldimethyl, chlorides |
| 68424-85-1 | | 68424-85-1 | ||
| style="text-align: right;" | 5.3 | | style="text-align: right;" | 5.3 | ||
Line 650: | Line 386: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-06-19 }}</ref> | | accessdate = 2019-06-19 }}</ref> | ||
+ | == Production Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Operator Name | ||
+ | !scope="col" | Gas Quantity (mcf) | ||
+ | !scope="col" | Gas Production Days | ||
+ | !scope="col" | Oil Quantity (bbl) | ||
+ | !scope="col" | Oil Production Days | ||
+ | !scope="col" | Water Quantity (bbl) | ||
+ | !scope="col" | Water Production Days | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[CABOT OIL & GAS CORP]] | ||
+ | | style="text-align: right;" | 763,091.00 | ||
+ | | style="text-align: right;" | 23 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Production Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Waste Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Period | ||
+ | !scope="col" | Waste Type | ||
+ | !scope="col" | Quantity | ||
+ | !scope="col" | Disposal Method | ||
+ | !scope="col" | Waste Facility ID | ||
+ | |- | ||
+ | | 2018-M07 | ||
+ | | Synthetic Liner Materials (in Tons) RWC 806 | ||
+ | | style="text-align: right;" | 5.75 Tons | ||
+ | | LANDFILL | ||
+ | | 101247 | ||
+ | |- | ||
+ | | 2018-M08 | ||
+ | | Drill Cuttings (in Tons) RWC 810 | ||
+ | | style="text-align: right;" | 474.61 Tons | ||
+ | | LANDFILL | ||
+ | | 101247 | ||
+ | |- | ||
+ | | 2018-M08 | ||
+ | | Synthetic Liner Materials (in Tons) RWC 806 | ||
+ | | style="text-align: right;" | 0.23 Tons | ||
+ | | LANDFILL | ||
+ | | 101247 | ||
+ | |- | ||
+ | | 2018-M11 | ||
+ | | Drill Cuttings (in Tons) RWC 810 | ||
+ | | style="text-align: right;" | 1,202.84 Tons | ||
+ | | LANDFILL | ||
+ | | 101247 | ||
+ | |- | ||
+ | | 2018-M12 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 58.57 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NE002 | ||
+ | |- | ||
+ | | 2018-M12 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 90.00 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NE004 | ||
+ | |- | ||
+ | | 2018-M12 | ||
+ | | Synthetic Liner Materials (in Tons) RWC 806 | ||
+ | | style="text-align: right;" | 6.15 Tons | ||
+ | | LANDFILL | ||
+ | | 101247 | ||
+ | |- | ||
+ | | 2019-M01 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 88.69 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NE002 | ||
+ | |- | ||
+ | | 2019-M01 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 381.68 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NE004 | ||
+ | |- | ||
+ | | 2019-M02 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 1,318.31 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NE002 | ||
+ | |- | ||
+ | | 2019-M02 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 665.17 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NE004 | ||
+ | |- | ||
+ | | 2019-M02 | ||
+ | | Synthetic Liner Materials (in Tons) RWC 806 | ||
+ | | style="text-align: right;" | 1.45 Tons | ||
+ | | LANDFILL | ||
+ | | 101247 | ||
+ | |- | ||
+ | | 2019-M02 | ||
+ | | Unused Fracturing Fluid Waste (in Tons) RWC 805 | ||
+ | | style="text-align: right;" | 2.83 Tons | ||
+ | | LANDFILL | ||
+ | | 101247 | ||
+ | |- | ||
+ | | 2019-M02 | ||
+ | | Waste Water Treatment Sludge (in Tons) RWC 804 | ||
+ | | style="text-align: right;" | 66.36 Tons | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | | 2019-M03 | ||
+ | | Other Oil & Gas Wastes (in Tons) RWC 899 | ||
+ | | style="text-align: right;" | 0.08 Tons | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | 301333 | ||
+ | |- | ||
+ | | 2019-M03 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 4,861.76 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NE002 | ||
+ | |- | ||
+ | | 2019-M03 | ||
+ | | Produced Fluid (in Barrels) RWC 802 | ||
+ | | style="text-align: right;" | 6,317.69 Bbl | ||
+ | | RESIDUAL WASTE PROCESSING FACILITY | ||
+ | | WMGR123NE004 | ||
+ | |- | ||
+ | | 2019-M03 | ||
+ | | Synthetic Liner Materials (in Tons) RWC 806 | ||
+ | | style="text-align: right;" | 16.43 Tons | ||
+ | | LANDFILL | ||
+ | | 101247 | ||
+ | |- | ||
+ | | 2019-M03 | ||
+ | | Waste Water Treatment Sludge (in Tons) RWC 804 | ||
+ | | style="text-align: right;" | 21.56 Tons | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Waste Reports | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-03-31 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Inspection Data == | ||
+ | ==== Inspections Performed ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Inspection Category | ||
+ | !scope="col" | Inspection Date | ||
+ | !scope="col" | Inspection Type | ||
+ | !scope="col" | Inspection Result | ||
+ | !scope="col" | Inspection Comments | ||
+ | |- | ||
+ | | 2748416 | ||
+ | | Primary Facility | ||
+ | | 2018-07-03 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | At time of inspection. | ||
+ | On site for a new spud inspection. | ||
+ | Met with company man David Dewberry. | ||
+ | United Drilling was on site to drill and run the conductor pipe for the 1H, 2H,3H, 5H, 7H, 8H and 10H wells. | ||
+ | There was one auger rig and two air rigs running when I arrived on site. | ||
+ | There was an air rig on the 1H at a depth of 7.5'. | ||
+ | The 2H was drilled to a depth of 105' and the auger rig was going in to clean out to bottom and run the conductor pipe. | ||
+ | The 3H was completed and the conductor pipe was in the hole at a depth of 105'. | ||
+ | The 5H was at a depth of 8'. | ||
+ | The 7H was at a depth of 6.5'. | ||
+ | The second air rig was rigging up on the 8H which was at a depth of 8.5'. | ||
+ | The 10H was drilled to a depth of 105'. | ||
+ | I took a walk around the location and there were no obvious concerns noticed. | ||
+ | There were no violations noted. | ||
+ | |- | ||
+ | | 2750986 | ||
+ | | Primary Facility | ||
+ | | 2018-07-09 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Today's inspection was conducted as part of an investigation into a nearby water supply complaint in which the water well was impacted by a heavy sediment load on 7/3/18. As Photo #2 shows, new wells have recently been spud on this pad. A review of the most recent Department Drilling Inspection, Inspection Record No. 2748434 found that conductor pipe was installed on 7/3/18 for 7 wells, the 1H, 2H, 3H, 5H, 7H, 8H, and the 10H. The conductors were all drilled to a depth of approximately 105'. During the 7/3/18 inspection, the inspector noted that 3 Rigs were being operated, one auger rig and two air rigs. No E&S issues were identified. No violations noted. | ||
+ | |- | ||
+ | | 2763305 | ||
+ | | Primary Facility | ||
+ | | 2018-08-14 | ||
+ | | Drilling/Alteration | ||
+ | | No Violations Noted | ||
+ | | At time of inspection. | ||
+ | Met with company man Will Dean. | ||
+ | PD 181 was on site to drill and set the surface and intermediate casings. | ||
+ | There are two existing wells on site that are temporarily plugged and there are seven new wells on site to be drilled. | ||
+ | They are on the sixth of the seven wells. | ||
+ | They were drilling the hole for the surface casing with WBM on the 7H when I arrived on site. | ||
+ | I took a walk around the location and there were no obvious concerns noticed. | ||
+ | The holes in the containment that were noticed in the last inspection were repaired. | ||
+ | There were no violations noted. | ||
+ | |- | ||
+ | | 2830122 | ||
+ | | Primary Facility | ||
+ | | 2019-01-22 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | At time of inspection. | ||
+ | Met with company man Andy Rodriguez. | ||
+ | Keane was on site to frac the 1H, 2H, 3H, 5H, 7H, 8H and 10H wells. | ||
+ | They were stimulating stage 10 out of 50 stages on the 10H and running a plug and perf in the 2H when I arrived on site. | ||
+ | The 1H was completed with 51 stages. | ||
+ | There were 20 stages completed out of 58 on the 2H. | ||
+ | There were 49 stages completed out of 50 on the 3H. | ||
+ | There were 49 stages completed out of 51 on the 5H. | ||
+ | There were 21 stages completed out of 23 on the 7H. | ||
+ | The 8H wasn't started but will have 30 stages. | ||
+ | The water was being trucked to the site. | ||
+ | I took a walk around the location and there were no obvious concerns noticed. | ||
+ | There were no violations noted. | ||
+ | |- | ||
+ | | 2850442 | ||
+ | | Primary Facility | ||
+ | | 2019-03-07 | ||
+ | | Routine/Complete Inspection | ||
+ | | No Violations Noted | ||
+ | | Today's inspection was conducted as a routine inspection. Present during the inspection was Cabot Site Supervisor Steve Gillman. Stimulation activities have been completed and site is currently being demobilized. Production equipment installation is also occurring. Overall the site appears to have good stabilization. No E&S issues identified. No violations noted. | ||
+ | |- | ||
+ | |} | ||
+ | <!--==== Violations Commited ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Inspection ID | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Violation Date | ||
+ | !scope="col" | Date Resolved | ||
+ | !scope="col" | Violation Code | ||
+ | !scope="col" | Violation Type | ||
+ | !scope="col" | Violation Comments | ||
+ | |- | ||
+ | |}--> | ||
+ | <!--==== Penalties Applied ==== | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Violation ID | ||
+ | !scope="col" | Penalty ID | ||
+ | !scope="col" | Penalty Code | ||
+ | !scope="col" | Penalty Status | ||
+ | !scope="col" | Penalty Date | ||
+ | !scope="col" | Enforcement Date | ||
+ | !scope="col" | Penalty Amount | ||
+ | !scope="col" | Amount Collected | ||
+ | |- | ||
+ | |}--> | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title =Oil and Gas Compliance Report | ||
+ | |publisher = [[Pennsylvania Department of Environmental Protection]] | ||
+ | | date = 2019-05-20 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2019-05-21 }}</ref> | ||
==References== | ==References== | ||
<references/> | <references/> |
Well ID: 37-115-22491 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.77145,"lon":-75.699997,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Harford Township | |
Operator Name: CABOT OIL & GAS CORP | |
Well Pad ID: 147696 | |
Farm/Lease Name: ADAMS J 001 | |
License Status: Active | |
Spud Date: 2018-07-02 | |
Permit Date: 2018-03-22 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.771450 | |
Longitude: -75.699997 |
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-12-22 | 2019-01-13 | 7354 | 16,425,000.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Sand (Proppant) | Keane | Proppant | Crystalline silica: Quartz (SiO2) | 14808-60-7 | 100 | 15.1717 | 24,647,000.0 |
Hydrochloric Acid (15%) | Keane | Acidizing | Water | 7732-18-5 | 7.5 | 0.0236082 | 38352.4 | |
Hydrochloric Acid | 7647-01-0 | 15 | 0.0472164 | 76704.9 | ||||
Other Chemical(s) | Listed Above | See Trade Name(s) List | alcohols, C 12-16, ethoxylated | 68551-12-2 | 1 | 0.00111863 | 1817.26 | |
Glutaral | 111-30-8 | 26.7 | 0.00232866 | 3783.01 | ||||
ethanal | 64-17-5 | 2.8 | 0.000244204 | 396.72 | ||||
Ethoxylated alcohol | 68131-39-5 | 10 | 0.000103045 | 167.401 | ||||
Ammonium Chloride | 12125-02-9 | 1.5 | 0.00167795 | 2725.89 | ||||
Methanol | 67-56-1 | 20 | 0.00330093 | 5362.5 | ||||
Water | 7732-18-5 | 7.5 | 0.0236082 | 38352.4 | ||||
Petroleum distillate, Hydrotreated Light | 64742-47-8 | 20 | 0.0223726 | 36345.2 | ||||
organic phosphonic salts | 15827-60-8 | 15 | 0.0024757 | 4021.87 | ||||
quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000463116 | 752.35 | ||||
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.00069511 | 1129.23 | ||||
oleic acid diethanolamide | 93-83-4 | 1.5 | 0.00167795 | 2725.89 | ||||
dipropylene gylcol, monomethyl ether | 34590-94-8 | 20 | 0.00020609 | 334.801 | ||||
formic acid | 64-18-6 | 10 | 0.000103045 | 167.401 | ||||
Citric acid | 77-92-9 | 30 | 0.00086977 | 1412.97 | ||||
Cinnamaldehyde | 104-55-2 | 10 | 0.000103045 | 167.401 | ||||
Tar bases, quinoline derivs., benzyl chloride-quaternized | 72480-70-7 | 10 | 0.000103045 | 167.401 | ||||
isoproyl alcohol | 67-63-0 | 5 | 0.00005152 | 83.7 | ||||
Biocide, MBC-516 | Keane | Biocide | quaternary ammonium compounds, benzyl-C12-16-alkyldimethyl, chlorides |
68424-85-1 | 5.3 | 0.000463116 | 752.35 | |
didecyldimethylammonium chloride | 7173-51-5 | 8 | 0.00069511 | 1129.23 | ||||
Glutaral | 111-30-8 | 26.7 | 0.00232866 | 3783.01 | ||||
Water | 7732-18-5 | 56.7 | 0.00494688 | 8036.41 | ||||
ethanal | 64-17-5 | 2.8 | 0.000244204 | 396.72 | ||||
Water | Cabot | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 84.3725 | 137,066,000.0 | |
Scale Inhibitor, KSI-19 | Keane | Scale Inhibitor | Water | 7732-18-5 | 65 | 0.010728 | 17428.1 | |
Methanol | 67-56-1 | 20 | 0.00330093 | 5362.5 | ||||
organic phosphonic salts | 15827-60-8 | 15 | 0.0024757 | 4021.87 | ||||
Acid Inhibitor, KAI-12 | Keane | Acid Inhibitor | Ethylene glycol | 107-21-1 | 40 | 0.00041218 | 669.603 | |
isoproyl alcohol | 67-63-0 | 5 | 0.00005152 | 83.7 | ||||
formic acid | 64-18-6 | 10 | 0.000103045 | 167.401 | ||||
dipropylene gylcol, monomethyl ether | 34590-94-8 | 20 | 0.00020609 | 334.801 | ||||
Ethoxylated alcohol | 68131-39-5 | 10 | 0.000103045 | 167.401 | ||||
Tar bases, quinoline derivs., benzyl chloride-quaternized | 72480-70-7 | 10 | 0.000103045 | 167.401 | ||||
Cinnamaldehyde | 104-55-2 | 10 | 0.000103045 | 167.401 | ||||
Iron Control, KFEAC-20/30 | Keane | Iron Control | Acetic acid | 64-19-7 | 5 | 0.000144962 | 235.496 | |
Citric acid | 77-92-9 | 30 | 0.00086977 | 1412.97 | ||||
Friction Reducer, KFR-16FW | Keane | Friction Reducer | Petroleum distillate, Hydrotreated Light | 64742-47-8 | 20 | 0.0223726 | 36345.2 | |
oleic acid diethanolamide | 93-83-4 | 1.5 | 0.00167795 | 2725.89 | ||||
Ammonium Chloride | 12125-02-9 | 1.5 | 0.00167795 | 2725.89 | ||||
alcohols, C 12-16, ethoxylated | 68551-12-2 | 1 | 0.00111863 | 1817.26 | ||||
Water | 7732-18-5 | 60 | 0.0671179 | 109036 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2019 | CABOT OIL & GAS CORP | 763,091.00 | 23 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2018-M07 | Synthetic Liner Materials (in Tons) RWC 806 | 5.75 Tons | LANDFILL | 101247 |
2018-M08 | Drill Cuttings (in Tons) RWC 810 | 474.61 Tons | LANDFILL | 101247 |
2018-M08 | Synthetic Liner Materials (in Tons) RWC 806 | 0.23 Tons | LANDFILL | 101247 |
2018-M11 | Drill Cuttings (in Tons) RWC 810 | 1,202.84 Tons | LANDFILL | 101247 |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 58.57 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 90.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2018-M12 | Synthetic Liner Materials (in Tons) RWC 806 | 6.15 Tons | LANDFILL | 101247 |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 88.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 381.68 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 1,318.31 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 665.17 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2019-M02 | Synthetic Liner Materials (in Tons) RWC 806 | 1.45 Tons | LANDFILL | 101247 |
2019-M02 | Unused Fracturing Fluid Waste (in Tons) RWC 805 | 2.83 Tons | LANDFILL | 101247 |
2019-M02 | Waste Water Treatment Sludge (in Tons) RWC 804 | 66.36 Tons | REUSE (AT WELL PAD) | |
2019-M03 | Other Oil & Gas Wastes (in Tons) RWC 899 | 0.08 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301333 |
2019-M03 | Produced Fluid (in Barrels) RWC 802 | 4,861.76 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE002 |
2019-M03 | Produced Fluid (in Barrels) RWC 802 | 6,317.69 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NE004 |
2019-M03 | Synthetic Liner Materials (in Tons) RWC 806 | 16.43 Tons | LANDFILL | 101247 |
2019-M03 | Waste Water Treatment Sludge (in Tons) RWC 804 | 21.56 Tons | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2748416 | Primary Facility | 2018-07-03 | Drilling/Alteration | No Violations Noted | At time of inspection.
On site for a new spud inspection. Met with company man David Dewberry. United Drilling was on site to drill and run the conductor pipe for the 1H, 2H,3H, 5H, 7H, 8H and 10H wells. There was one auger rig and two air rigs running when I arrived on site. There was an air rig on the 1H at a depth of 7.5'. The 2H was drilled to a depth of 105' and the auger rig was going in to clean out to bottom and run the conductor pipe. The 3H was completed and the conductor pipe was in the hole at a depth of 105'. The 5H was at a depth of 8'. The 7H was at a depth of 6.5'. The second air rig was rigging up on the 8H which was at a depth of 8.5'. The 10H was drilled to a depth of 105'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2750986 | Primary Facility | 2018-07-09 | Routine/Complete Inspection | No Violations Noted | Today's inspection was conducted as part of an investigation into a nearby water supply complaint in which the water well was impacted by a heavy sediment load on 7/3/18. As Photo #2 shows, new wells have recently been spud on this pad. A review of the most recent Department Drilling Inspection, Inspection Record No. 2748434 found that conductor pipe was installed on 7/3/18 for 7 wells, the 1H, 2H, 3H, 5H, 7H, 8H, and the 10H. The conductors were all drilled to a depth of approximately 105'. During the 7/3/18 inspection, the inspector noted that 3 Rigs were being operated, one auger rig and two air rigs. No E&S issues were identified. No violations noted. |
2763305 | Primary Facility | 2018-08-14 | Drilling/Alteration | No Violations Noted | At time of inspection.
Met with company man Will Dean. PD 181 was on site to drill and set the surface and intermediate casings. There are two existing wells on site that are temporarily plugged and there are seven new wells on site to be drilled. They are on the sixth of the seven wells. They were drilling the hole for the surface casing with WBM on the 7H when I arrived on site. I took a walk around the location and there were no obvious concerns noticed. The holes in the containment that were noticed in the last inspection were repaired. There were no violations noted. |
2830122 | Primary Facility | 2019-01-22 | Routine/Complete Inspection | No Violations Noted | At time of inspection.
Met with company man Andy Rodriguez. Keane was on site to frac the 1H, 2H, 3H, 5H, 7H, 8H and 10H wells. They were stimulating stage 10 out of 50 stages on the 10H and running a plug and perf in the 2H when I arrived on site. The 1H was completed with 51 stages. There were 20 stages completed out of 58 on the 2H. There were 49 stages completed out of 50 on the 3H. There were 49 stages completed out of 51 on the 5H. There were 21 stages completed out of 23 on the 7H. The 8H wasn't started but will have 30 stages. The water was being trucked to the site. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted. |
2850442 | Primary Facility | 2019-03-07 | Routine/Complete Inspection | No Violations Noted | Today's inspection was conducted as a routine inspection. Present during the inspection was Cabot Site Supervisor Steve Gillman. Stimulation activities have been completed and site is currently being demobilized. Production equipment installation is also occurring. Overall the site appears to have good stabilization. No E&S issues identified. No violations noted. |
For data sources see[7]