X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-117-21407"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-117-21407
 
| Well ID: 37-117-21407
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.773703, -77.242778 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.773703, -77.242778 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 03/06/2012
+
| Spud Date: 2012-03-06
 
|-
 
|-
| Permit Date: 12/27/2011
+
| Permit Date: 2011-12-27
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 147: Line 172:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2012-1
+
| 2012-S01
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 193.40 Tons
 
| style="text-align: right;" | 193.40 Tons
Line 153: Line 178:
 
| 9312
 
| 9312
 
|-
 
|-
| 2012-2
+
| 2012-S02
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 2,044.59 Bbl
 
| style="text-align: right;" | 2,044.59 Bbl
Line 159: Line 184:
 
|  
 
|  
 
|-
 
|-
| 2012-2
+
| 2012-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 117.73 Bbl
 
| style="text-align: right;" | 117.73 Bbl
Line 165: Line 190:
 
|  
 
|  
 
|-
 
|-
| 2013-1
+
| 2013-S01
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 54.72 Bbl
 
| style="text-align: right;" | 54.72 Bbl
Line 171: Line 196:
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2013-1
+
| 2013-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 31.44 Bbl
 
| style="text-align: right;" | 31.44 Bbl
Line 177: Line 202:
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2013-1
+
| 2013-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,124.40 Bbl
 
| style="text-align: right;" | 1,124.40 Bbl
Line 183: Line 208:
 
|  
 
|  
 
|-
 
|-
| 2014-2
+
| 2014-S02
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 66.23 Tons
 
| style="text-align: right;" | 66.23 Tons
Line 189: Line 214:
 
| 301358
 
| 301358
 
|-
 
|-
| 2014-2
+
| 2014-S02
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 33.34 Bbl
 
| style="text-align: right;" | 33.34 Bbl
Line 195: Line 220:
 
|  
 
|  
 
|-
 
|-
| 2014-2
+
| 2014-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 8.35 Bbl
 
| style="text-align: right;" | 8.35 Bbl
Line 201: Line 226:
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2014-2
+
| 2014-S02
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 33.34 Bbl
 
| style="text-align: right;" | 33.34 Bbl
Line 207: Line 232:
 
|  
 
|  
 
|-
 
|-
| 2015-1
+
| 2015-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 76.88 Bbl
 
| style="text-align: right;" | 76.88 Bbl
Line 213: Line 238:
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2015-1
+
| 2015-S01
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 12.50 Bbl
 
| style="text-align: right;" | 12.50 Bbl
Line 219: Line 244:
 
|  
 
|  
 
|-
 
|-
| 2017-06
+
| 2017-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 57.29 Bbl
 
| style="text-align: right;" | 57.29 Bbl
Line 244: Line 269:
 
| 2110003
 
| 2110003
 
| Primary Facility
 
| Primary Facility
| 10/22/2012
+
| 2012-10-22
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 251: Line 276:
 
| 2358670
 
| 2358670
 
| Primary Facility
 
| Primary Facility
| 04/06/2015
+
| 2015-04-06
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 258: Line 283:
 
| 2406706
 
| 2406706
 
| Primary Facility
 
| Primary Facility
| 09/11/2015
+
| 2015-09-11
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 343: Line 368:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 15:30, 2 August 2019

Well Details

Well ID: 37-117-21407
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Charleston Township
Operator Name: SWEPI LP
Well Pad ID: 148781
Farm/Lease Name: LOPATOFSKY T 287 5H
License Status: Active
Spud Date: 2012-03-06
Permit Date: 2011-12-27
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.773703
Longitude: -77.242778

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 SWEPI LP 0.00 0 0.00 0 0.00 0
2012 SWEPI LP 0.00 0 0.00 0 0.00 0
2013 SWEPI LP 0.00 0 0.00 0 0.00 0
2014 SWEPI LP 0.00 0 0.00 0 0.00 0
2015 SWEPI LP 0.00 0 0.00 0 0.00 0
2016 SWEPI LP 0.00 0 0.00 0 0.00 0
2017 SWEPI LP 0.00 0 0.00 0 0.00 0
2019 SWEPI LP 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2012-S01 Drill Cuttings (in Tons) 193.40 Tons LANDFILL 9312
2012-S02 Fracing Fluid Waste (in Barrels) 2,044.59 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S02 Produced Fluid (in Barrels) 117.73 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Fracing Fluid Waste (in Barrels) 54.72 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013-S01 Produced Fluid (in Barrels) 31.44 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013-S01 Produced Fluid (in Barrels) 1,124.40 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Drill Cuttings (in Tons) 66.23 Tons LANDFILL 301358
2014-S02 Drilling Fluid Waste (in Barrels) 33.34 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 8.35 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014-S02 Produced Fluid (in Barrels) 33.34 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 76.88 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015-S01 Produced Fluid (in Barrels) 12.50 Bbl REUSE OTHER THAN ROAD SPREADING
2017-M06 Produced Fluid (in Barrels) RWC 802 57.29 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2110003 Primary Facility 2012-10-22 Routine/Complete Inspection No Violations Noted
2358670 Primary Facility 2015-04-06 Routine/Complete Inspection No Violations Noted
2406706 Primary Facility 2015-09-11 Routine/Complete Inspection No Violations Noted
2463208 Primary Facility 2016-03-09 Routine/Complete Inspection No Violations Noted Routine inspection. The 1V, 1H - 3H and 23H wells have been drilled. Conductors have been set for the 4H - 6H wells. The 23H well is in production. The pad has not been restored, although is permanently stabilized. Some erosion observed at the southeast pad corner; requested that the erosion feature be repaired. Department received a request from SWEPI on 1/11/16 to extend the restoration requirements for the site. TLT
2538507 Primary Facility 2016-11-16 Site Restoration No Violations Noted Restoration inspection. Notice of Termination (NOT) received on 11/14/16. The Well Site Restoration Report (WSRR) was received on 11/16/16 and covers the 1V, 1H - 6H and 23H wells. Interim site restoration completed between July - August 2016. Post construction stormwater management (PCSM) BMP’s have been installed. Areas disturbed during the construction of the PCSM BMPs are permanently stabilized as per 25 Pa Code §102.22(a)(2) and temporary E&S controls have been removed. Recommend approval of the NOT. The WSRR was acknowledged on 11/21/16. TLT
2735114 Primary Facility 2018-05-29 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of the SWEPI LP- Lopatofsky Unit 287 located in Charlestown Township, Tioga County on May 29, 2018 at 1400 hrs. the weather is sunny and 89°.

The NOT was terminated on 11/22/2016. The 1V, 1H - 3H and 23H wells have been drilled. The 1H-3H and the 23H appear to be in production. The tank and containment onsite inspection log was last updated May 28, 2018. No issues were noted. The access road and rock Lined ditches appear to be in good shape. Some minor erosion was observed at the top of the rock channel spanning from the center of the pad to the infiltration basin.

No violations were noted at this time. I departed the site at 1440 hrs.

2735531 Primary Facility 2018-05-30 Routine/Complete Inspection No Violations Noted Warm/windy at time of inspection.
2790314 Primary Facility 2018-10-17 Routine/Complete Inspection No Violations Noted Cool/rainy windy at time of inspection.
2826370 Primary Facility 2019-01-14 Routine/Complete Inspection No Violations Noted The DEP conducted a routine inspection of SWEPI's Lopatofsky 287 Well Pad in Charleston Twp, Tioga County on 1/14/2019 at 1120 hours. The inspection was conducted to assess site conditions. Weather: 21 degrees and sunny.

There are currently 4 wells onsite capable of producing with one Highland production tank. The site remains stabilized and no erosional issues were observed. PCSM BMPs remain in place and appear functional. All fluids on the pad surface were frozen solid today.

I departed the site at 1145 hours. No violations noted today.

For data sources see[6]

References