X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-117-21983"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-117-21983
 
| Well ID: 37-117-21983
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.633336, -77.121714 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.633336, -77.121714 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 09/04/2018
+
| Spud Date: 2018-09-04
 
|-
 
|-
| Permit Date: 4/26/2018
+
| Permit Date: 2018-04-26
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 84: Line 109:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2018-09
+
| 2018-M09
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 5.29 Tons
 
| style="text-align: right;" | 5.29 Tons
Line 90: Line 115:
 
| 8-0728-0004/013
 
| 8-0728-0004/013
 
|-
 
|-
| 2018-09
+
| 2018-M09
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 11.60 Tons
 
| style="text-align: right;" | 11.60 Tons
Line 96: Line 121:
 
| 8-4630-00010/00
 
| 8-4630-00010/00
 
|-
 
|-
| 2019-01
+
| 2019-M01
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 370.05 Tons
 
| style="text-align: right;" | 370.05 Tons
Line 102: Line 127:
 
| 101243
 
| 101243
 
|-
 
|-
| 2019-01
+
| 2019-M01
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 1,187.31 Tons
 
| style="text-align: right;" | 1,187.31 Tons
Line 108: Line 133:
 
| 301358
 
| 301358
 
|-
 
|-
| 2019-03
+
| 2019-M03
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 7.68 Tons
 
| style="text-align: right;" | 7.68 Tons
Line 191: Line 216:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 15:29, 2 August 2019

Well Details

Well ID: 37-117-21983
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Liberty Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 155180
Farm/Lease Name: HUGHES (02-204-04) E 4H
License Status: Active
Spud Date: 2018-09-04
Permit Date: 2018-04-26
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.633336
Longitude: -77.121714

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-M09 Drill Cuttings (in Tons) RWC 810 5.29 Tons LANDFILL 8-0728-0004/013
2018-M09 Drill Cuttings (in Tons) RWC 810 11.60 Tons LANDFILL 8-4630-00010/00
2019-M01 Drill Cuttings (in Tons) RWC 810 370.05 Tons LANDFILL 101243
2019-M01 Drill Cuttings (in Tons) RWC 810 1,187.31 Tons LANDFILL 301358
2019-M03 Synthetic Liner Materials (in Tons) RWC 806 7.68 Tons LANDFILL 8-0728-0004/013

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2755643 Primary Facility 2018-06-27 Routine/Complete Inspection No Violations Noted Pre-Operational Inspection; 6/27/2018.

At the time of the inspection, perimeter E&S controls were installed, trees were cut/removed and earthmoving had begun. Overall, the site is in good condition. No violations noted.

2769022 Primary Facility 2018-08-29 Preoperation Inspection No Violations Noted I met with Repsol Construction Foreman, Johnny Pazzaglia, on site. He explained that they installed a rock lined ditch (photo 4) in the channel that was planned to be vegetated, because a ground water spring is flowing water through it. Water in the ditch is 0.03mS/cm w an Oakton PCSTestr 35 today.

E&S controls are in place to comply w: A^§ 3258. (a.1) Preoperation inspections.--The operator may not commence drilling activities until the DEP has conducted an inspection of the unconventional well site after the installation of erosion and sediment control measures. JLP

2779765 Primary Facility 2018-09-26 Routine/Complete Inspection No Violations Noted Weather was 64° and raining at time of inspection. There were no Repsol representatives on location at time of inspection. Well is a spud conductor only. Well has a rectangular concrete and steel cellar installed. Conductor casing and the mouse hole were set at time of inspection. The cellar was covered with a steel grate. No violations were noted at time of inspection.
2824622 Primary Facility 2019-01-09 Routine/Complete Inspection No Violations Noted I met Trent Henderson of Repsol when I arrived. Patterson rig 278 on location running casing in the 6H well. The rig will be skidding to the 4H next. Overall condition of the containment appeared to be excellent, and the contained areas were quite clean and neat. The cuttings backyard was also very clean.

For data sources see[6]

References