X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-117-22002"

m
 
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-117-22002
 
| Well ID: 37-117-22002
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.573225, -77.051578 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.573225, -77.051578 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 06/12/2018
+
| Spud Date: 2018-06-12
 
|-
 
|-
| Permit Date: 5/31/2018
+
| Permit Date: 2018-05-31
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 93: Line 118:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2018-07
+
| 2018-M07
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 383.13 Tons
 
| style="text-align: right;" | 383.13 Tons
Line 99: Line 124:
 
| 301358
 
| 301358
 
|-
 
|-
| 2018-07
+
| 2018-M07
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 86.63 Bbl
 
| style="text-align: right;" | 86.63 Bbl
Line 105: Line 130:
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2018-07
+
| 2018-M07
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 530.00 Bbl
 
| style="text-align: right;" | 530.00 Bbl
Line 111: Line 136:
 
|  
 
|  
 
|-
 
|-
| 2018-07
+
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 272.62 Bbl
 
| style="text-align: right;" | 272.62 Bbl
Line 117: Line 142:
 
|  
 
|  
 
|-
 
|-
| 2018-07
+
| 2018-M07
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 0.70 Tons
 
| style="text-align: right;" | 0.70 Tons
Line 123: Line 148:
 
| 301358
 
| 301358
 
|-
 
|-
| 2018-08
+
| 2018-M08
 
| Drill Cuttings (in Tons) RWC 810
 
| Drill Cuttings (in Tons) RWC 810
 
| style="text-align: right;" | 735.50 Tons
 
| style="text-align: right;" | 735.50 Tons
Line 129: Line 154:
 
| 301358
 
| 301358
 
|-
 
|-
| 2018-08
+
| 2018-M08
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 366.67 Bbl
 
| style="text-align: right;" | 366.67 Bbl
Line 135: Line 160:
 
|  
 
|  
 
|-
 
|-
| 2018-09
+
| 2018-M09
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 455.83 Bbl
 
| style="text-align: right;" | 455.83 Bbl
Line 141: Line 166:
 
|  
 
|  
 
|-
 
|-
| 2018-09
+
| 2018-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 3.33 Bbl
 
| style="text-align: right;" | 3.33 Bbl
Line 147: Line 172:
 
|  
 
|  
 
|-
 
|-
| 2018-09
+
| 2018-M09
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| style="text-align: right;" | 121.03 Tons
 
| style="text-align: right;" | 121.03 Tons
Line 153: Line 178:
 
| 100955
 
| 100955
 
|-
 
|-
| 2018-09
+
| 2018-M09
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 5.57 Tons
 
| style="text-align: right;" | 5.57 Tons
Line 159: Line 184:
 
| 301358
 
| 301358
 
|-
 
|-
| 2018-10
+
| 2018-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 70.00 Bbl
 
| style="text-align: right;" | 70.00 Bbl
Line 165: Line 190:
 
|  
 
|  
 
|-
 
|-
| 2018-10
+
| 2018-M10
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 2.61 Tons
 
| style="text-align: right;" | 2.61 Tons
Line 171: Line 196:
 
| 301358
 
| 301358
 
|-
 
|-
| 2018-11
+
| 2018-M11
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 680.00 Bbl
 
| style="text-align: right;" | 680.00 Bbl
Line 177: Line 202:
 
|  
 
|  
 
|-
 
|-
| 2018-11
+
| 2018-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 105.00 Bbl
 
| style="text-align: right;" | 105.00 Bbl
Line 183: Line 208:
 
| WMGR119
 
| WMGR119
 
|-
 
|-
| 2018-11
+
| 2018-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 3,848.33 Bbl
 
| style="text-align: right;" | 3,848.33 Bbl
Line 189: Line 214:
 
|  
 
|  
 
|-
 
|-
| 2018-11
+
| 2018-M11
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 21.45 Tons
 
| style="text-align: right;" | 21.45 Tons
Line 195: Line 220:
 
| 301358
 
| 301358
 
|-
 
|-
| 2018-12
+
| 2018-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 76.67 Bbl
 
| style="text-align: right;" | 76.67 Bbl
Line 201: Line 226:
 
| PAS2D215BWAR
 
| PAS2D215BWAR
 
|-
 
|-
| 2018-12
+
| 2018-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
Line 207: Line 232:
 
|  
 
|  
 
|-
 
|-
| 2018-12
+
| 2018-M12
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| style="text-align: right;" | 211.64 Tons
 
| style="text-align: right;" | 211.64 Tons
Line 213: Line 238:
 
| 100955
 
| 100955
 
|-
 
|-
| 2018-12
+
| 2018-M12
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| style="text-align: right;" | 138.86 Tons
 
| style="text-align: right;" | 138.86 Tons
Line 219: Line 244:
 
| 301358
 
| 301358
 
|-
 
|-
| 2018-12
+
| 2018-M12
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 1.66 Tons
 
| style="text-align: right;" | 1.66 Tons
Line 225: Line 250:
 
| 301358
 
| 301358
 
|-
 
|-
| 2019-01
+
| 2019-M01
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 128.33 Bbl
 
| style="text-align: right;" | 128.33 Bbl
Line 231: Line 256:
 
|  
 
|  
 
|-
 
|-
| 2019-01
+
| 2019-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,481.67 Bbl
 
| style="text-align: right;" | 1,481.67 Bbl
Line 237: Line 262:
 
|  
 
|  
 
|-
 
|-
| 2019-01
+
| 2019-M01
 
| Produced Fluid (in Tons) RWC 802
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 38.60 Tons
 
| style="text-align: right;" | 38.60 Tons
Line 243: Line 268:
 
| 301358
 
| 301358
 
|-
 
|-
| 2019-01
+
| 2019-M01
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| style="text-align: right;" | 23.41 Tons
 
| style="text-align: right;" | 23.41 Tons
Line 249: Line 274:
 
| 100955
 
| 100955
 
|-
 
|-
| 2019-01
+
| 2019-M01
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| style="text-align: right;" | 27.39 Tons
 
| style="text-align: right;" | 27.39 Tons
Line 255: Line 280:
 
| 301358
 
| 301358
 
|-
 
|-
| 2019-01
+
| 2019-M01
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 4.10 Tons
 
| style="text-align: right;" | 4.10 Tons
Line 261: Line 286:
 
| 301358
 
| 301358
 
|-
 
|-
| 2019-02
+
| 2019-M02
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 70.00 Bbl
 
| style="text-align: right;" | 70.00 Bbl
Line 267: Line 292:
 
|  
 
|  
 
|-
 
|-
| 2019-02
+
| 2019-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2,196.67 Bbl
 
| style="text-align: right;" | 2,196.67 Bbl
Line 273: Line 298:
 
|  
 
|  
 
|-
 
|-
| 2019-02
+
| 2019-M02
 
| Produced Fluid (in Tons) RWC 802
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 19.13 Tons
 
| style="text-align: right;" | 19.13 Tons
Line 279: Line 304:
 
| 100955
 
| 100955
 
|-
 
|-
| 2019-02
+
| 2019-M02
 
| Produced Fluid (in Tons) RWC 802
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 28.10 Tons
 
| style="text-align: right;" | 28.10 Tons
Line 285: Line 310:
 
| 301358
 
| 301358
 
|-
 
|-
| 2019-02
+
| 2019-M02
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| style="text-align: right;" | 13.73 Tons
 
| style="text-align: right;" | 13.73 Tons
Line 291: Line 316:
 
| 301358
 
| 301358
 
|-
 
|-
| 2019-02
+
| 2019-M02
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 1.32 Tons
 
| style="text-align: right;" | 1.32 Tons
Line 297: Line 322:
 
| 100955
 
| 100955
 
|-
 
|-
| 2019-02
+
| 2019-M02
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 15.34 Tons
 
| style="text-align: right;" | 15.34 Tons
Line 303: Line 328:
 
| 301358
 
| 301358
 
|-
 
|-
| 2019-03
+
| 2019-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,005.00 Bbl
 
| style="text-align: right;" | 1,005.00 Bbl
Line 309: Line 334:
 
| WMGR123NC022
 
| WMGR123NC022
 
|-
 
|-
| 2019-03
+
| 2019-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 1,703.67 Bbl
 
| style="text-align: right;" | 1,703.67 Bbl
Line 315: Line 340:
 
|  
 
|  
 
|-
 
|-
| 2019-03
+
| 2019-M03
 
| Produced Fluid (in Tons) RWC 802
 
| Produced Fluid (in Tons) RWC 802
 
| style="text-align: right;" | 5.66 Tons
 
| style="text-align: right;" | 5.66 Tons
Line 321: Line 346:
 
| 301358
 
| 301358
 
|-
 
|-
| 2019-03
+
| 2019-M03
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811
 
| style="text-align: right;" | 3.13 Tons
 
| style="text-align: right;" | 3.13 Tons
Line 327: Line 352:
 
| 301358
 
| 301358
 
|-
 
|-
| 2019-03
+
| 2019-M03
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| Synthetic Liner Materials (in Tons) RWC 806
 
| style="text-align: right;" | 24.26 Tons
 
| style="text-align: right;" | 24.26 Tons
Line 456: Line 481:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 15:31, 2 August 2019

Well Details

Well ID: 37-117-22002
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Liberty Township
Operator Name: ROCKDALE MARCELLUS LLC
Well Pad ID: 148455
Farm/Lease Name: GUILLAUME UNIT 714 4H
License Status: Active
Spud Date: 2018-06-12
Permit Date: 2018-05-31
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.573225
Longitude: -77.051578

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 ROCKDALE MARCELLUS LLC 946,324.00 61 0.00 0 0.00 0
2019 ROCKDALE MARCELLUS LLC 1,633,095.00 90 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-M07 Drill Cuttings (in Tons) RWC 810 383.13 Tons LANDFILL 301358
2018-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 86.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 530.00 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 272.62 Bbl REUSE (AT WELL PAD)
2018-M07 Synthetic Liner Materials (in Tons) RWC 806 0.70 Tons LANDFILL 301358
2018-M08 Drill Cuttings (in Tons) RWC 810 735.50 Tons LANDFILL 301358
2018-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 366.67 Bbl REUSE (AT WELL PAD)
2018-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 455.83 Bbl REUSE (AT WELL PAD)
2018-M09 Produced Fluid (in Barrels) RWC 802 3.33 Bbl REUSE (AT WELL PAD)
2018-M09 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 121.03 Tons LANDFILL 100955
2018-M09 Synthetic Liner Materials (in Tons) RWC 806 5.57 Tons LANDFILL 301358
2018-M10 Produced Fluid (in Barrels) RWC 802 70.00 Bbl REUSE (AT WELL PAD)
2018-M10 Synthetic Liner Materials (in Tons) RWC 806 2.61 Tons LANDFILL 301358
2018-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 680.00 Bbl REUSE (AT WELL PAD)
2018-M11 Produced Fluid (in Barrels) RWC 802 105.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR119
2018-M11 Produced Fluid (in Barrels) RWC 802 3,848.33 Bbl REUSE (AT WELL PAD)
2018-M11 Synthetic Liner Materials (in Tons) RWC 806 21.45 Tons LANDFILL 301358
2018-M12 Produced Fluid (in Barrels) RWC 802 76.67 Bbl INJECTION DISPOSAL WELL PAS2D215BWAR
2018-M12 Produced Fluid (in Barrels) RWC 802 100.00 Bbl REUSE (AT WELL PAD)
2018-M12 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 211.64 Tons LANDFILL 100955
2018-M12 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 138.86 Tons LANDFILL 301358
2018-M12 Synthetic Liner Materials (in Tons) RWC 806 1.66 Tons LANDFILL 301358
2019-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 128.33 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Barrels) RWC 802 1,481.67 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Tons) RWC 802 38.60 Tons LANDFILL 301358
2019-M01 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 23.41 Tons LANDFILL 100955
2019-M01 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 27.39 Tons LANDFILL 301358
2019-M01 Synthetic Liner Materials (in Tons) RWC 806 4.10 Tons LANDFILL 301358
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 70.00 Bbl REUSE (AT WELL PAD)
2019-M02 Produced Fluid (in Barrels) RWC 802 2,196.67 Bbl REUSE (AT WELL PAD)
2019-M02 Produced Fluid (in Tons) RWC 802 19.13 Tons LANDFILL 100955
2019-M02 Produced Fluid (in Tons) RWC 802 28.10 Tons LANDFILL 301358
2019-M02 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 13.73 Tons LANDFILL 301358
2019-M02 Synthetic Liner Materials (in Tons) RWC 806 1.32 Tons LANDFILL 100955
2019-M02 Synthetic Liner Materials (in Tons) RWC 806 15.34 Tons LANDFILL 301358
2019-M03 Produced Fluid (in Barrels) RWC 802 1,005.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2019-M03 Produced Fluid (in Barrels) RWC 802 1,703.67 Bbl REUSE (AT WELL PAD)
2019-M03 Produced Fluid (in Tons) RWC 802 5.66 Tons LANDFILL 301358
2019-M03 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 3.13 Tons LANDFILL 301358
2019-M03 Synthetic Liner Materials (in Tons) RWC 806 24.26 Tons LANDFILL 301358

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2748731 Primary Facility 2018-06-29 Routine/Complete Inspection No Violations Noted Weather was 75° and sunny at time of inspection. Met with Rockdale Marcellus representative Jimmy Larson on location. Well is a spud conductor. Well has a steel plate welded over with the well number on it. Cellar has some standing water and no bubbling was noted at time of inspection. No violations were noted at time of inspection.
2750152 Primary Facility 2018-07-10 Drilling/Alteration No Violations Noted The weather is 85 Deg. F and sunny at the time of inspection. Routine inspection of Rockdale Marcellus LLC., Guillaume 714 Pad, well # 4H on July 10, 2018.

Currently intermediate casing 9-5/8" cemented at 2022 ft. Verified cement PTRs (surface and intermediate strings), permit, WOC time and driller's log. No violations are noted at time of inspection. Wellsite looks neat and well organized. DEP Representative - Ulyana Trynovich, Richard Becher, Oil and Gas Inspectors. Rockdale Marcellus LLC. Representative ¿ Jimmy Larson, DSM.

2752939 Primary Facility 2018-07-16 Routine/Complete Inspection No Violations Noted Weather was 88° and sunny at time of inspection. Met with Rockdale Marcellus representative Luke Chesner and Matthew Knight on location. Rig was currently in the process of moving from this well to the 4H. Once drilling was complete the well was loaded with 12 lb. oil based mud and a retrievable plug was set in the intermediate casing. No violations were noted at time of inspection.
2760473 Primary Facility 2018-08-06 Routine/Complete Inspection No Violations Noted Weather was 74 degrees and sunny at time of inspection. Met with Rockdale Marcellus representative Danny Brooks. Well was shut in at time of inspection. Cellar conditions did not appear to have changed from previous inspection. Conducted a walk around inspection of location. No violations noted at time of inspection.
2762762 Primary Facility 2018-08-13 Routine/Complete Inspection No Violations Noted Weather was 66° and raining at time of inspection. Met with Rockdale Marcellus representative Danny Brooks. Rig was in the process of drilling the 8 1/2" hole for the production casing. They were expecting to TD later this evening and were estimating to cement the production casing later on 8/14/2018. Conducted a walk around inspection of location. No violations were noted at time of inspection.
2763039 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted Routine Inspection; 8/1/2018.

I entered the site at 10:30 and inspected the stormwater controls along the access road. The area is well vegetated and temporary E&S controls are in the process of being removed. On the well pad, I talked to Mr. Carrasco (rig manager) from Patterson -UTI and we walked the site. At the time of the inspection, the BOP stack was installed on the Guillaume 6H (117-22003) but flow line was not yet connected. The derrick was up but cuttings management/backyard is still being rigged-up. Containment is in good condition and the wooden rig mats are also in good condition. Drilling additives and potential contaminants are stored in containment or have additional individual containment/cover. After walking the site, I talked to Danny Brooks (company man) and discussed the containment, maintenance, and the other two wells planned for the site. Overall, the site is in good condition. No violations noted.

2765043 Primary Facility 2018-08-20 Routine/Complete Inspection No Violations Noted Weather was 66° and cloudy at time of inspection. Met with Rockdale Marcellus representative Jim Tracey. At time of inspection well had been completed to TD. A nightcap was installed on the well and the rig skidded over to the 2H to complete it. Reviewed the cement job log from the production casing and no discrepancies we noted. Conducted a walk around inspection of location. No violations were noted at time of inspection.
2771414 Primary Facility 2018-09-06 Routine/Complete Inspection No Violations Noted Weather was 77° and sunny at time of inspection. Met with Rockdale Marcellus representative Levi Lee on location. Well was shut in at time of inspection. There were no annulus vents plumbed to surface at time of inspection. Crews were on location preparing it for stimulation operations. Conducted a walk around inspection of location. No violations noted at time of inspection.
2778819 Primary Facility 2018-09-24 Routine/Complete Inspection No Violations Noted Weather was 62° and partly sunny at time of inspection. Met with Rockdale Marcellus representative Luke on location. Well was shut in at time of inspection. There were no annulus vents plumbed to surface at time of inspection. Crews were on location preparing it for stimulation operations. Conducted a walk around inspection of location. No violations noted at time of inspection.
2811838 Primary Facility 2018-11-29 Routine/Complete Inspection No Violations Noted On 11/29/18 an inspection was conducted to assess site conditions and to check on the progress of the cleanup of a spill reported on 10/24/18 (CTS# 337795). No Rockdale reps were present upon arrival on location. At the time of the inspection, fracing operations had been completed & the wells were flowing back. A small battery of tanks on secondary containment were present near the well heads. The secondary containment from the frac had already been removed. A large aboveground storage tank (AST) is present on the NE corner of the pad. The tank is double-walled and plastic-lined. The SE corner of the pad was being excavated at the time of the inspection. Adjacent to this area of excavation were multiple roll-off containers containing excavated soil. In another area between the frac tank battery near the well heads & the AST, 2 more roll-off boxes were present. A separate area appeared to have been excavated adjacent to the AST on the NW side. Several puddles were present all over the pad & most but not all w

For data sources see[6]

References