X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-053-28138"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-053-28138
 
| Well ID: 37-053-28138
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.625212, -79.137991 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.625212, -79.137991 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 07/03/2006
+
| Spud Date: 2006-07-03
 
|-
 
|-
| Permit Date: 12/19/2005
+
| Permit Date: 2005-12-19
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 67: Line 92:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2007
 
| 2007
Line 74: Line 99:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 85: Line 110:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 94: Line 119:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 101: Line 126:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 130: Line 155:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 139: Line 164:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 148: Line 173:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 157: Line 182:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 166: Line 191:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 183: Line 208:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2006-0
+
| 2006-A00
 
| Brine
 
| Brine
 
| style="text-align: right;" | 120.00 Bbl
 
| style="text-align: right;" | 120.00 Bbl
Line 189: Line 214:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2008-0
+
| 2008-A00
 
| Brine
 
| Brine
 
| style="text-align: right;" | 31.00 Bbl
 
| style="text-align: right;" | 31.00 Bbl
Line 195: Line 220:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 48.00 Bbl
 
| style="text-align: right;" | 48.00 Bbl
Line 201: Line 226:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 38.00 Bbl
 
| style="text-align: right;" | 38.00 Bbl
Line 207: Line 232:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1.65 Bbl
 
| style="text-align: right;" | 1.65 Bbl
Line 213: Line 238:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2013-0
+
| 2013-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 14.87 Bbl
 
| style="text-align: right;" | 14.87 Bbl
Line 219: Line 244:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2014-0
+
| 2014-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 16.49 Bbl
 
| style="text-align: right;" | 16.49 Bbl
Line 225: Line 250:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2016-0
+
| 2016-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 16.96 Bbl
 
| style="text-align: right;" | 16.96 Bbl
Line 231: Line 256:
 
|  
 
|  
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 16.52 Bbl
 
| style="text-align: right;" | 16.52 Bbl
Line 237: Line 262:
 
|  
 
|  
 
|-
 
|-
| 2018-0
+
| 2018-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 23.26 Bbl
 
| style="text-align: right;" | 23.26 Bbl
Line 262: Line 287:
 
| 1552172
 
| 1552172
 
| Primary Facility
 
| Primary Facility
| 07/24/2006
+
| 2006-07-24
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 269: Line 294:
 
| 1565954
 
| 1565954
 
| Primary Facility
 
| Primary Facility
| 08/10/2006
+
| 2006-08-10
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 276: Line 301:
 
| 1770757
 
| 1770757
 
| Primary Facility
 
| Primary Facility
| 02/23/2009
+
| 2009-02-23
 
| Administrative/File Review
 
| Administrative/File Review
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 283: Line 308:
 
| 1832346
 
| 1832346
 
| Primary Facility
 
| Primary Facility
| 09/28/2009
+
| 2009-09-28
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 290: Line 315:
 
| 1845913
 
| 1845913
 
| Primary Facility
 
| Primary Facility
| 11/16/2009
+
| 2009-11-16
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 309: Line 334:
 
| 494136
 
| 494136
 
| 07/24/2006
 
| 07/24/2006
| 08/10/2006
+
| 2006-07-24
 
| 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table
 
| 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table
 
| Administrative
 
| Administrative
Line 317: Line 342:
 
| 494137
 
| 494137
 
| 07/24/2006
 
| 07/24/2006
| 08/10/2006
+
| 2006-07-24
 
| 78.57 - Failure to post pit approval number
 
| 78.57 - Failure to post pit approval number
 
| Administrative
 
| Administrative
Line 325: Line 350:
 
| 556821
 
| 556821
 
| 02/23/2009
 
| 02/23/2009
| 04/07/2009
+
| 2009-02-23
 
| 212WELLRCD - Failure to submit well record within 30 days of completion of drilling
 
| 212WELLRCD - Failure to submit well record within 30 days of completion of drilling
 
| Administrative
 
| Administrative
Line 333: Line 358:
 
| 572706
 
| 572706
 
| 09/28/2009
 
| 09/28/2009
| 11/16/2009
+
| 2009-09-28
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| 201TAG - Failure to install, in a permanent manner, the permit number on a completed well
 
| Administrative
 
| Administrative
Line 355: Line 380:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/18/2006
+
| 2006-09-18
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 363: Line 388:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 09/18/2006
+
| 2006-09-18
| 09/18/2006
+
| 2006-09-18
 
| style="text-align: right;" | $12,220.00
 
| style="text-align: right;" | $12,220.00
 
| style="text-align: right;" | $12,220.00
 
| style="text-align: right;" | $12,220.00
Line 373: Line 398:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 09/18/2006
+
| 2006-09-18
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 381: Line 406:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 09/18/2006
+
| 2006-09-18
| 09/18/2006
+
| 2006-09-18
 
| style="text-align: right;" | $12,220.00
 
| style="text-align: right;" | $12,220.00
 
| style="text-align: right;" | $12,220.00
 
| style="text-align: right;" | $12,220.00
Line 391: Line 416:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 11/18/2009
+
| 2009-11-18
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 400: Line 425:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 11/16/2009
+
| 2009-11-16
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 411: Line 436:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 20:43, 2 August 2019

Well Details

Well ID: 37-053-28138
Loading map...
Country: United States
State: Pennsylvania
County: Forest
Municipality: Howe Township
Operator Name: CAMERON ENERGY CO
Well Pad ID:
Farm/Lease Name: SOUTHWELL 27
License Status: Active
Spud Date: 2006-07-03
Permit Date: 2005-12-19
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.625212
Longitude: -79.137991

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 ALLIANCE PETROLEUM CORP 176.00 365 59.00 365 0.00 0
2007 ALLIANCE PETROLEUM CORP 1,595.00 365 0.00 0 0.00 0
2008 ALLIANCE PETROLEUM CORP 613.00 365 82.00 365 0.00 0
2010 ALLIANCE PETROLEUM CO LLC 340.40 365 37.17 365 0.00 0
2011 ALLIANCE PETROLEUM CO LLC 19.53 365 0.00 0 0.00 0
2012 EVERGREEN RESOURCE CO 55.89 120 4.59 120 0.10 120
2013 EVERGREEN RESOURCE CO 214.57 365 49.81 365 0.36 365
2014 CAMERON ENERGY CO 201.51 365 46.83 365 0.00 0
2015 CAMERON ENERGY CO 211.67 365 36.01 365 0.00 0
2016 CAMERON ENERGY CO 91.78 365 65.78 365 0.00 0
2017 CAMERON ENERGY CO 108.52 365 60.16 365 0.00 0
2018 CAMERON ENERGY CO 108.91 365 72.68 365 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2006-A00 Brine 120.00 Bbl Brine or Industrial Waste Treatment Plt PA0102784
2008-A00 Brine 31.00 Bbl Brine or Industrial Waste Treatment Plt PA0102784
2010-A00 Produced Fluid (in Barrels) 48.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011-A00 Produced Fluid (in Barrels) 38.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2012-A00 Produced Fluid (in Barrels) 1.65 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2013-A00 Produced Fluid (in Barrels) 14.87 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014-A00 Produced Fluid (in Barrels) 16.49 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016-A00 Produced Fluid (in Barrels) RWC 802 16.96 Bbl REUSE OTHER THAN ROAD SPREADING
2017-A00 Produced Fluid (in Barrels) RWC 802 16.52 Bbl REUSE OTHER THAN ROAD SPREADING
2018-A00 Produced Fluid (in Barrels) RWC 802 23.26 Bbl REUSE OTHER THAN ROAD SPREADING

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1552172 Primary Facility 2006-07-24 Routine/Complete Inspection Violation(s) Noted
1565954 Primary Facility 2006-08-10 Compliance Evaluation No Violations Noted
1770757 Primary Facility 2009-02-23 Administrative/File Review Violation(s) Noted
1832346 Primary Facility 2009-09-28 Routine/Complete Inspection Violation(s) Noted
1845913 Primary Facility 2009-11-16 Compliance Evaluation No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1552172 494136 07/24/2006 2006-07-24 78.56PITCNST - Impoundment not structurally sound, impermeable, 3rd party protected, greater than 20" of seasonal high ground water table Administrative Torn pit liner
1552172 494137 07/24/2006 2006-07-24 78.57 - Failure to post pit approval number Administrative 78.57(a) - discharge of frac water to ground
1770757 556821 02/23/2009 2009-02-23 212WELLRCD - Failure to submit well record within 30 days of completion of drilling Administrative
1832346 572706 09/28/2009 2009-09-28 201TAG - Failure to install, in a permanent manner, the permit number on a completed well Administrative No well tag.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
494136 210693 NOV - Notice of Violation Comply/Closed 2006-09-18
494136 212595 CACP - Consent Assessment of Civil Penalty Comply/Closed 2006-09-18 2006-09-18 $12,220.00 $12,220.00
494137 210693 NOV - Notice of Violation Comply/Closed 2006-09-18
494137 212595 CACP - Consent Assessment of Civil Penalty Comply/Closed 2006-09-18 2006-09-18 $12,220.00 $12,220.00
556821 245499 NOV - Notice of Violation Comply/Closed 2009-11-18
572706 251105 NOV - Notice of Violation Comply/Closed 2009-11-16

For data sources see[6]

References