X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-053-28464"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-053-28464
 
| Well ID: 37-053-28464
| style="height=100%; align=center" rowspan="14" | {{#display_map: 41.593257, -79.012701 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.593257, -79.012701 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 08/06/2007
+
| Spud Date: 2007-08-06
 
|-
 
|-
| Permit Date: 9/27/2006
+
| Permit Date: 2006-09-27
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 76: Line 101:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 85: Line 110:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 130: Line 155:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 139: Line 164:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 156: Line 181:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 9.50 Bbl
 
| style="text-align: right;" | 9.50 Bbl
Line 162: Line 187:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 39.63 Bbl
 
| style="text-align: right;" | 39.63 Bbl
Line 168: Line 193:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 10.00 Bbl
 
| style="text-align: right;" | 10.00 Bbl
Line 174: Line 199:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2014-0
+
| 2014-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 3.48 Bbl
 
| style="text-align: right;" | 3.48 Bbl
Line 180: Line 205:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2016-0
+
| 2016-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 8.88 Bbl
 
| style="text-align: right;" | 8.88 Bbl
Line 186: Line 211:
 
| PA0102784
 
| PA0102784
 
|-
 
|-
| 2016-0
+
| 2016-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 9.75 Bbl
 
| style="text-align: right;" | 9.75 Bbl
Line 192: Line 217:
 
|  
 
|  
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 38.75 Bbl
 
| style="text-align: right;" | 38.75 Bbl
Line 198: Line 223:
 
| PA0023213
 
| PA0023213
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 37.56 Bbl
 
| style="text-align: right;" | 37.56 Bbl
Line 204: Line 229:
 
| WMGR123NW005
 
| WMGR123NW005
 
|-
 
|-
| 2018-0
+
| 2018-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 6.25 Bbl
 
| style="text-align: right;" | 6.25 Bbl
Line 229: Line 254:
 
| 1583886
 
| 1583886
 
| Primary Facility
 
| Primary Facility
| 12/04/2006
+
| 2006-12-04
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 236: Line 261:
 
| 1586480
 
| 1586480
 
| Primary Facility
 
| Primary Facility
| 12/13/2006
+
| 2006-12-13
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 243: Line 268:
 
| 1613175
 
| 1613175
 
| Primary Facility
 
| Primary Facility
| 04/03/2007
+
| 2007-04-03
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 250: Line 275:
 
| 1620694
 
| 1620694
 
| Primary Facility
 
| Primary Facility
| 04/26/2007
+
| 2007-04-26
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 257: Line 282:
 
| 1669753
 
| 1669753
 
| Primary Facility
 
| Primary Facility
| 12/05/2007
+
| 2007-12-05
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 264: Line 289:
 
| 1690001
 
| 1690001
 
| Primary Facility
 
| Primary Facility
| 03/07/2008
+
| 2008-03-07
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 271: Line 296:
 
| 1737459
 
| 1737459
 
| Primary Facility
 
| Primary Facility
| 09/18/2008
+
| 2008-09-18
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| No Violations Noted
 
| No Violations Noted
Line 297: Line 322:
 
| 503721
 
| 503721
 
| 12/04/2006
 
| 12/04/2006
| 04/26/2007
+
| 2006-12-04
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 330: Line 355:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 21:18, 2 August 2019

Well Details

Well ID: 37-053-28464
Loading map...
Country: United States
State: Pennsylvania
County: Forest
Municipality: Howe Township
Operator Name: BULL RUN RESOURCES LLC
Well Pad ID:
Farm/Lease Name: EVANS E18
License Status: Active
Spud Date: 2007-08-06
Permit Date: 2006-09-27
Unconventional Well: N
Configuration: Vertical Well
Latitude: 41.593257
Longitude: -79.012701

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 0.00 0 0.00 0 0.00 0
2010 CATALYST ENERGY INC 4,431.00 365 496.00 365 0.00 0
2011 CATALYST ENERGY INC 3,733.63 365 365.75 365 0.00 0
2012 CATALYST ENERGY INC 203.88 366 19.38 366 10.00 366
2014 CATALYST ENERGY INC 54.00 210 36.28 210 14.69 210
2015 CATALYST ENERGY INC 236.62 182 69.56 182 3.65 182
2016 CATALYST ENERGY INC 292.63 335 57.64 335 0.99 335
2017 CATALYST ENERGY INC 374.75 365 95.58 365 0.00 0
2018 BULL RUN RESOURCES LLC 316.63 365 55.00 365 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-A00 Produced Fluid (in Barrels) 9.50 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011-A00 Produced Fluid (in Barrels) 39.63 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2012-A00 Produced Fluid (in Barrels) 10.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2014-A00 Produced Fluid (in Barrels) 3.48 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016-A00 Produced Fluid (in Barrels) RWC 802 8.88 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2016-A00 Produced Fluid (in Barrels) RWC 802 9.75 Bbl STORAGE PENDING DISPOSAL OR REUSE
2017-A00 Produced Fluid (in Barrels) RWC 802 38.75 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0023213
2017-A00 Produced Fluid (in Barrels) RWC 802 37.56 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005
2018-A00 Produced Fluid (in Barrels) RWC 802 6.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW005

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1583886 Primary Facility 2006-12-04 Compliance Evaluation Violation(s) Noted
1586480 Primary Facility 2006-12-13 Routine/Complete Inspection No Violations Noted
1613175 Primary Facility 2007-04-03 Compliance Evaluation Outstanding Violations - No Viols Req'd
1620694 Primary Facility 2007-04-26 Compliance Evaluation No Violations Noted
1669753 Primary Facility 2007-12-05 Routine/Complete Inspection No Violations Noted
1690001 Primary Facility 2008-03-07 Routine/Complete Inspection No Violations Noted
1737459 Primary Facility 2008-09-18 Routine/Complete Inspection No Violations Noted
2493772 Primary Facility 2016-06-16 Routine/Complete Inspection No Violations Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1583886 503721 12/04/2006 2006-12-04 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety BMPs not fully implemented.

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
503721 223260 CDEC - Consent Decree $400,000.00 $375,000.00

For data sources see[6]

References