If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 21: | Line 21: | ||
| License Status: Producing | | License Status: Producing | ||
|- | |- | ||
− | | License Date: | + | | License Date: 2011-11-23 |
|- | |- | ||
| Spud Date: 2011-12-17 | | Spud Date: 2011-12-17 |
Well ID: 34-115-24663 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.652279554,"lon":-81.96888093,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morgan | |
Municipality: Deerfield Township | |
Operator Name: ARTEX OIL COMPANY | |
Well Pad ID: | |
Farm/Lease Name: LAPP-LEMON UNIT # 1 | |
License Status: Producing | |
License Date: 2011-11-23 | |
Spud Date: 2011-12-17 | |
Spud Drilling Contractor: WARREN DRLG | |
Final Drill Date: 2012-01-13 | |
Well Total Depth: 6456 ft | |
Configuration: Vertical | |
Latitude: 39.652279554 | |
Longitude: -81.96888093 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-11-23 | Proposed Formations:OHIO SHALE THRU KNOX, Issued Date:11/23/2011, Expired Date:11/22/2013 12:00:00 PM, Drilling unit acres:80, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2011-12-02 | CORRECTION TO FOOTAGE |
Correction to Well | 2011-12-09 | CORRECTION TO FOOTAGE. |
Reached Total Depth | 2012-01-13 | |
Completion Report Received | 2012-05-11 | |
Construction Permit Expires | 2013-11-22 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-05-11 | 6311 | 6355 | 35 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-01-23 | ACID | 15 | 9655 Gal | 0 | Producers Service Corporation | BOP tested and passed. Warren Drilling using BOP with 3 separate shut-offs - blind rams, pipe rams and annular. 1st 2 tested to 1000# and held, annular tested to 800# and held. |
2012-01-23 | ACID | 28 | 1000 Gal | 0 | Producers Service Corporation | 1st ran 1000 gal of 28% acid, followed by 7650 gal of 15%. Were flowing back this afternoon and next day, in production soon. Ave rate was 4 bbl/min., 4.2 bbl max. 2 3/8" tubing ran to 6260'. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | ARTEX OIL COMPANY | 1089 | 0 | 366 |
2013 | ARTEX OIL COMPANY | 1039 | 70 | 365 |
2014 | ARTEX OIL COMPANY | 288 | 0 | 365 |
2015 | ARTEX OIL COMPANY | 0 | 0 | 365 |
2016 | ARTEX OIL COMPANY | 0 | 0 | 365 |
2017 | ARTEX OIL COMPANY | 0 | 0 | 365 |
2018 | ARTEX OIL COMPANY | 0 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | ARTEX OIL COMPANY | Brine | 5007 | 366 |
2013 | ARTEX OIL COMPANY | Brine | 411 | 365 |
2014 | ARTEX OIL COMPANY | Brine | 118 | 365 |
2015 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2016 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2017 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2018 | ARTEX OIL COMPANY | Brine | 36 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0698715745 | 2014-06-04 | Drill / Deepen / Reopen | No Violations | There is heavy equipment on location. The pit has been filled and the operator has recently graded the location. The well is currently in production and there is a current chart on the meter. There is one 100 and one 210 bbl tank in the dike. Operator needs to build up the dike. Site does not yet meet preliminary restoration requirements. |
1326804047 | 2012-01-17 | Drill / Deepen / Reopen | No Violations | Talked to Heath (ARTEX) who informed me that they finished drilling this well on 1/15/12 and cemented casing. I was not notified of these activities. Total depth of this well was 6456. |
1340619799 | 2012-06-21 | Preliminary Restoration | No Violations
-liner above ground and asked them to remove all of it. Tank still needs painted, good identification on ladder, current chart shows well is selling gas. Well is equipped with pumping unit. | |
1347463731 | 2012-09-12 | Preliminary Restoration | No Violations | Preliminary Restoration passed on 9-12-12 by Patrick Shreve. Company man Frank Riggle was present on day of inspection. |
For data sources see[9]