X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-22848"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-22848
 
| Well ID: 37-125-22848
| style="height=100%; align=center" rowspan="14" | {{#display_map: 40.067719, -80.114298 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.067719, -80.114298 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 03/06/2008
+
| Spud Date: 2008-03-06
 
|-
 
|-
| Permit Date: 7/16/2007
+
| Permit Date: 2007-07-16
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
Line 49: Line 49:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
<!--== Fracking Activities ==
 +
==== Fracking Jobs ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Job Start Date
 +
!scope="col" | Job End Date
 +
!scope="col" | True Vertical Depth (ft)
 +
!scope="col" | Total Water Volume (gal)
 +
!scope="col" | Total Non-Water Volume (gal)
 +
|-
 +
|}-->
 +
<!--==== Fluid Composition Data ====
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Job Number
 +
!scope="col" | Trade Name
 +
!scope="col" | Supplier
 +
!scope="col" | Purpose
 +
!scope="col" | Ingredient Name
 +
!scope="col" | CAS Number
 +
!scope="col" | Additive Percentage by Mass
 +
!scope="col" | Job Percentage by Mass
 +
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 63: Line 88:
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2008
 
| 2008
Line 74: Line 99:
 
| style="text-align: right;" | 164
 
| style="text-align: right;" | 164
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2009
 
| 2009
Line 83: Line 108:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2010
 
| 2010
Line 92: Line 117:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2011
 
| 2011
Line 103: Line 128:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2012
 
| 2012
Line 110: Line 135:
 
| style="text-align: right;" | 323
 
| style="text-align: right;" | 323
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013
 
| 2013
Line 119: Line 144:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2014
 
| 2014
Line 128: Line 153:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2015
 
| 2015
Line 137: Line 162:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2016
 
| 2016
Line 146: Line 171:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2017
 
| 2017
Line 155: Line 180:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2018
 
| 2018
Line 164: Line 189:
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
| style="text-align: right;" |  
+
| style="text-align: right;" | 0
 
|-
 
|-
 
|}
 
|}
Line 183: Line 208:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-0
+
| 2010-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 390.00 Bbl
 
| style="text-align: right;" | 390.00 Bbl
Line 189: Line 214:
 
|  
 
|  
 
|-
 
|-
| 2011-0
+
| 2011-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 113.00 Bbl
 
| style="text-align: right;" | 113.00 Bbl
Line 195: Line 220:
 
|  
 
|  
 
|-
 
|-
| 2012-0
+
| 2012-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 224.00 Bbl
 
| style="text-align: right;" | 224.00 Bbl
Line 201: Line 226:
 
| 34-167-29395
 
| 34-167-29395
 
|-
 
|-
| 2013-0
+
| 2013-A00
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 55.00 Bbl
 
| style="text-align: right;" | 55.00 Bbl
Line 207: Line 232:
 
| 34-167-29395
 
| 34-167-29395
 
|-
 
|-
| 2017-0
+
| 2017-A00
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 72.00 Bbl
 
| style="text-align: right;" | 72.00 Bbl
Line 232: Line 257:
 
| 1697226
 
| 1697226
 
| Primary Facility
 
| Primary Facility
| 04/02/2008
+
| 2008-04-02
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 239: Line 264:
 
| 1706718
 
| 1706718
 
| Primary Facility
 
| Primary Facility
| 03/27/2008
+
| 2008-03-27
 
| Routine/Complete Inspection
 
| Routine/Complete Inspection
 
| Violation(s) Noted
 
| Violation(s) Noted
Line 246: Line 271:
 
| 1707638
 
| 1707638
 
| Primary Facility
 
| Primary Facility
| 05/19/2008
+
| 2008-05-19
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Outstanding Violations - Viols Req'd
 
| Outstanding Violations - Viols Req'd
Line 253: Line 278:
 
| 1716168
 
| 1716168
 
| Primary Facility
 
| Primary Facility
| 06/19/2008
+
| 2008-06-19
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Administratively Closed
 
| Administratively Closed
Line 260: Line 285:
 
| 1720673
 
| 1720673
 
| Primary Facility
 
| Primary Facility
| 07/15/2008
+
| 2008-07-15
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| Outstanding Violations - No Viols Req'd
 
| Outstanding Violations - No Viols Req'd
Line 267: Line 292:
 
| 1729596
 
| 1729596
 
| Primary Facility
 
| Primary Facility
| 08/21/2008
+
| 2008-08-21
 
| Compliance Evaluation
 
| Compliance Evaluation
 
| No Violations Noted
 
| No Violations Noted
Line 293: Line 318:
 
| 536281
 
| 536281
 
| 04/02/2008
 
| 04/02/2008
| 08/21/2008
+
| 2008-04-02
 
| 102.4INADPLN - E&S Plan not adequate
 
| 102.4INADPLN - E&S Plan not adequate
 
| Administrative
 
| Administrative
Line 301: Line 326:
 
| 536282
 
| 536282
 
| 04/02/2008
 
| 04/02/2008
| 08/21/2008
+
| 2008-04-02
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 309: Line 334:
 
| 536283
 
| 536283
 
| 04/02/2008
 
| 04/02/2008
| 08/21/2008
+
| 2008-04-02
 
| 78.56LINER - Improperly lined pit
 
| 78.56LINER - Improperly lined pit
 
| Administrative
 
| Administrative
Line 317: Line 342:
 
| 539113
 
| 539113
 
| 03/27/2008
 
| 03/27/2008
| 04/02/2008
+
| 2008-03-27
 
| 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt
 
| 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 325: Line 350:
 
| 539114
 
| 539114
 
| 03/27/2008
 
| 03/27/2008
| 04/02/2008
+
| 2008-03-27
 
| 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith
 
| 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith
 
| Administrative
 
| Administrative
Line 333: Line 358:
 
| 539346
 
| 539346
 
| 05/19/2008
 
| 05/19/2008
| 08/21/2008
+
| 2008-05-19
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d)
 
| Environmental Health & Safety
 
| Environmental Health & Safety
Line 355: Line 380:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/21/2008
+
| 2008-08-21
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 363: Line 388:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 11/26/2008
+
| 2008-11-26
| 11/26/2008
+
| 2008-11-26
 
| style="text-align: right;" | $35,100.00
 
| style="text-align: right;" | $35,100.00
 
| style="text-align: right;" | $35,100.00
 
| style="text-align: right;" | $35,100.00
Line 373: Line 398:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/21/2008
+
| 2008-08-21
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 381: Line 406:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 11/26/2008
+
| 2008-11-26
| 11/26/2008
+
| 2008-11-26
 
| style="text-align: right;" | $35,100.00
 
| style="text-align: right;" | $35,100.00
 
| style="text-align: right;" | $35,100.00
 
| style="text-align: right;" | $35,100.00
Line 391: Line 416:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/21/2008
+
| 2008-08-21
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 399: Line 424:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 11/26/2008
+
| 2008-11-26
| 11/26/2008
+
| 2008-11-26
 
| style="text-align: right;" | $35,100.00
 
| style="text-align: right;" | $35,100.00
 
| style="text-align: right;" | $35,100.00
 
| style="text-align: right;" | $35,100.00
Line 409: Line 434:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/21/2008
+
| 2008-08-21
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 417: Line 442:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 11/26/2008
+
| 2008-11-26
| 11/26/2008
+
| 2008-11-26
 
| style="text-align: right;" | $35,100.00
 
| style="text-align: right;" | $35,100.00
 
| style="text-align: right;" | $35,100.00
 
| style="text-align: right;" | $35,100.00
Line 427: Line 452:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/21/2008
+
| 2008-08-21
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 435: Line 460:
 
| CACP - Consent Assessment of Civil Penalty
 
| CACP - Consent Assessment of Civil Penalty
 
| Comply/Closed
 
| Comply/Closed
| 11/26/2008
+
| 2008-11-26
| 11/26/2008
+
| 2008-11-26
 
| style="text-align: right;" | $35,100.00
 
| style="text-align: right;" | $35,100.00
 
| style="text-align: right;" | $35,100.00
 
| style="text-align: right;" | $35,100.00
Line 445: Line 470:
 
| Comply/Closed
 
| Comply/Closed
 
|  
 
|  
| 08/21/2008
+
| 2008-08-21
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
Line 456: Line 481:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Job Start Date
 
!scope="col" | Job End Date
 
!scope="col" | True Vertical Depth (ft)
 
!scope="col" | Total Water Volume (gal)
 
!scope="col" | Total Non-Water Volume (gal)
 
|-
 
|}-->
 
<!--==== Fluid Composition Data ====
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Job Number
 
!scope="col" | Trade Name
 
!scope="col" | Supplier
 
!scope="col" | Purpose
 
!scope="col" | Ingredient Name
 
!scope="col" | CAS Number
 
!scope="col" | Additive Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
|-
 
|}-->
 
 
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Pennsylvania Wells]]
 
[[Category:Pennsylvania Wells]]

Revision as of 07:49, 3 August 2019

Well Details

Well ID: 37-125-22848
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: North Bethlehem Township
Operator Name: K PETROLEUM INC
Well Pad ID:
Farm/Lease Name: HIXENBAUGH 4-P093
License Status: Active
Spud Date: 2008-03-06
Permit Date: 2007-07-16
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.067719
Longitude: -80.114298

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2007 0.00 0 0.00 0 0.00 0
2008 MTN V OIL & GAS INC 8,162.00 164 0.00 0 0.00 0
2009 MTN V OIL & GAS INC 14,730.00 365 0.00 0 0.00 0
2010 MTN V OIL & GAS INC 10,067.00 365 0.00 0 0.00 0
2011 HAYDEN HARPER ENERGY KA LLC 6,482.24 365 9.67 365 0.00 0
2012 HAYDEN HARPER ENERGY KA LLC 5,285.00 323 0.00 0 0.00 0
2013 HAYDEN HARPER ENERGY KA LLC 2,530.62 365 0.00 0 0.00 0
2014 HAYDEN HARPER ENERGY KA LLC 2,403.00 365 0.00 0 0.00 0
2015 K PETROLEUM INC 387.00 365 0.00 0 0.00 0
2016 K PETROLEUM INC 829.00 365 0.00 0 0.00 0
2017 K PETROLEUM INC 822.00 365 0.00 0 0.00 0
2018 K PETROLEUM INC 742.35 365 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2010-A00 Produced Fluid (in Barrels) 390.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011-A00 Produced Fluid (in Barrels) 113.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2012-A00 Produced Fluid (in Barrels) 224.00 Bbl INJECTION DISPOSAL WELL 34-167-29395
2013-A00 Produced Fluid (in Barrels) 55.00 Bbl INJECTION DISPOSAL WELL 34-167-29395
2017-A00 Produced Fluid (in Barrels) RWC 802 72.00 Bbl INJECTION DISPOSAL WELL 34-167-29395

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1697226 Primary Facility 2008-04-02 Routine/Complete Inspection Violation(s) Noted
1706718 Primary Facility 2008-03-27 Routine/Complete Inspection Violation(s) Noted
1707638 Primary Facility 2008-05-19 Compliance Evaluation Outstanding Violations - Viols Req'd
1716168 Primary Facility 2008-06-19 Compliance Evaluation Administratively Closed
1720673 Primary Facility 2008-07-15 Compliance Evaluation Outstanding Violations - No Viols Req'd
1729596 Primary Facility 2008-08-21 Compliance Evaluation No Violations Noted Violations have now been resolved (after 4.5 months)
2532617 Primary Facility 2016-09-20 Routine/Complete Inspection No Violations Noted Routine-complete inspection

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1697226 536281 04/02/2008 2008-04-02 102.4INADPLN - E&S Plan not adequate Administrative
1697226 536282 04/02/2008 2008-04-02 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety
1697226 536283 04/02/2008 2008-04-02 78.56LINER - Improperly lined pit Administrative
1706718 539113 03/27/2008 2008-03-27 301CSL - Stream discharge of IW, includes drill cuttings, oil, brine and/or silt Environmental Health & Safety
1706718 539114 03/27/2008 2008-03-27 91.33A - Failure to notify DEP of pollution incident. No phone call made forthwith Administrative
1707638 539346 05/19/2008 2008-05-19 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
536281 232438 NOV - Notice of Violation Comply/Closed 2008-08-21
536281 240703 CACP - Consent Assessment of Civil Penalty Comply/Closed 2008-11-26 2008-11-26 $35,100.00 $35,100.00
536282 232438 NOV - Notice of Violation Comply/Closed 2008-08-21
536282 240703 CACP - Consent Assessment of Civil Penalty Comply/Closed 2008-11-26 2008-11-26 $35,100.00 $35,100.00
536283 232438 NOV - Notice of Violation Comply/Closed 2008-08-21
536283 240703 CACP - Consent Assessment of Civil Penalty Comply/Closed 2008-11-26 2008-11-26 $35,100.00 $35,100.00
539113 233850 NOV - Notice of Violation Comply/Closed 2008-08-21
539113 240703 CACP - Consent Assessment of Civil Penalty Comply/Closed 2008-11-26 2008-11-26 $35,100.00 $35,100.00
539114 233850 NOV - Notice of Violation Comply/Closed 2008-08-21
539114 240703 CACP - Consent Assessment of Civil Penalty Comply/Closed 2008-11-26 2008-11-26 $35,100.00 $35,100.00
539346 233985 NOV - Notice of Violation Comply/Closed 2008-08-21

For data sources see[6]

References