If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Muskingum_County,_Ohio|Muskingum]] | | County: [[Muskingum_County,_Ohio|Muskingum]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Blue Rock Township,_Muskingum_County,_Ohio|Blue Rock Township]] |
|- | |- | ||
| Operator Name: [[J M ADAMS ROUSTABOUT PIPE]] | | Operator Name: [[J M ADAMS ROUSTABOUT PIPE]] |
Well ID: 34-119-23905 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.780623559,"lon":-81.84033334,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Blue Rock Township | |
Operator Name: J M ADAMS ROUSTABOUT PIPE | |
Well Pad ID: | |
Farm/Lease Name: HARLAN D | |
License Status: Producing | |
License Date: 1978-07-31 | |
Spud Date: 1978-08-08 | |
Spud Drilling Contractor: | |
Final Drill Date: 1978-08-18 | |
Well Total Depth: 1677 ft | |
Configuration: Vertical | |
Latitude: 39.780623559 | |
Longitude: -81.84033334 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1978-07-31 | 6 BENATTY CORP GeoDate 7/31/78 |
Original Spud | 1978-08-08 | R.I. 8-2-78 / P.B 1-30-79 ? PF * NO PRODUCING FORMATION |
Completed | 1978-08-18 | R.I. 8-2-78 / P.B 1-30-79 ? PF * NO PRODUCING FORMATION |
Reached Total Depth | 1978-08-18 | R.I. 8-2-78 / P.B 1-30-79 ? PF * NO PRODUCING FORMATION |
Plugged Back | 1979-01-30 | R.I. 8-2-78 / P.B 1-30-79 ? PF * NO PRODUCING FORMATION |
CO | 1995-01-20 | 182 BELDEN & BLAKE CO GeoDate 7/31/78 |
Change of Owner | 1997-09-10 | Operator changed from 1419, LEVENGOOD OIL & GAS(US)IN to 5935, DOVER ATWOOD CORP. |
Change of Owner | 1997-09-10 | Operator changed from 182, BELDEN & BLAKE CO to 1419, LEVENGOOD OIL & GAS(US)IN |
Change of Owner | 1999-06-04 | Operator changed from 5935, DOVER ATWOOD CORP. to 3388, ADAMS JM ROUSTABOUT/PIPE |
Record Last Modified | 2013-10-03 | R.I. 8-2-78 / P.B 1-30-79 ? PF * NO PRODUCING FORMATION |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4620 | 4630 | 12 |
2006-09-11 | 4716 | 4719 | 4 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 92000 Gal | 50000 |
For data sources see[4]