X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-083-24617"

m
m
Line 11: Line 11:
 
| County: [[Knox_County,_Ohio|Knox]]
 
| County: [[Knox_County,_Ohio|Knox]]
 
|-
 
|-
| Municipality: [[Clay_Township,_Knox_County,_Ohio|Clay Township]]
+
| Municipality: [[Clay Township,_Knox_County,_Ohio|Clay Township]]
 
|-
 
|-
 
| Operator Name: [[R & J WELL SERVICE LLC]]
 
| Operator Name: [[R & J WELL SERVICE LLC]]

Revision as of 16:03, 12 August 2019

Well Details

Well ID: 34-083-24617
Loading map...
Country: United States
State: Ohio
County: Knox
Municipality: Clay Township
Operator Name: R & J WELL SERVICE LLC
Well Pad ID:
Farm/Lease Name: VAUTERS HOLLY
License Status: Producing
License Date: 2014-07-22
Spud Date: 2014-07-23
Spud Drilling Contractor: CO TOOLS
Final Drill Date: 2015-03-10
Well Total Depth: 2817 ft
Configuration: Vertical
Latitude: 40.269731792
Longitude: -82.30770372

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-07-22 Proposed Formations:CLINTON, Issued Date:7/22/2014, Expired Date:7/21/2016 12:00:00 PM, Drilling unit acres:174.7, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2015-03-10
Completion Report Received 2015-07-02
Construction Permit Expires 2016-07-21
Record Last Modified 2019-06-11

For data sources see[2]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2015-04-27 H2O 0 1625 Bbl 30333 Producers Service Corporation

For data sources see[3]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2015 R & J WELL SERVICE LLC 0 2458 240
2016 R & J WELL SERVICE LLC 0 1505 365
2017 R & J WELL SERVICE LLC 0 868 365
2018 R & J WELL SERVICE LLC 0 620 365

For data sources see[4] [5]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2015 R & J WELL SERVICE LLC Brine 1050 240
2016 R & J WELL SERVICE LLC Brine 600 365
2017 R & J WELL SERVICE LLC Brine 350 365
2018 R & J WELL SERVICE LLC Brine 160 365

For data sources see[6] [7]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0012680316 2015-02-18 Drill / Deepen / Reopen No Violations Drilling operations have resumed they are currently 2670 feet with the construction of the wells main bore.
0111775441 2015-01-05 Drill / Deepen / Reopen No Violations Drilling operations are ongoing they are presently 2360 feet deep with the main well bore.
0126545645 2014-09-12 Drill / Deepen / Reopen No Violations Cemenco Service Inc. on site to cement 8 5/8 surface casing today.
0138877775 2015-01-29 Drill / Deepen / Reopen No Violations Rig is setting idle waiting on repair of tools.
0308207711 2014-12-12 Drill / Deepen / Reopen No Violations The rig is setting idle waiting on repair parts for the fuel pump. No one was on site today during my inspection.
0363565997 2014-11-18 Drill / Deepen / Reopen No Violations Drilling operations are ongoing they are 2200 feet deep with the construction of the well bore.
0456473544 2014-09-09 Drill / Deepen / Reopen No Violations Drilling operations are on going. They were drilling during this inspection no violations, they are currently at 350 feet and drilling.
0609605725 2015-05-13 Production Wells No Violations They are in the process of finishing setting up the tank battery with the final plumbing in of the well. The location is partially reclaimed and the pit still has to finish being closed in.
0711128349 2015-04-28 Production Wells No Violations They are in the process of running rods and tubing into the well today after being fracked.
0755691168 2014-12-02 Drill / Deepen / Reopen No Violations Inspect drill location. Drill rig setup and idle. No personnel on location.
1002858073 2014-11-07 Drill / Deepen / Reopen No Violations Drilling operations are on going they are 2000 feet deep with the construction of this well bore.
1019029309 2015-02-27 Drill / Deepen / Reopen No Violations Drilling operations are ongoing they are 2675 feet deep at the top of the Clinton sands. They have stopped drilling and are in the process of preparing to run the 4 1/2 inch production casing before finishing the well and fracking.
1147671840 2014-07-29 Drill / Deepen / Reopen No Violations The rig is rigged up on location final preparations are being done to start this well.
1150006396 2014-10-29 Drill / Deepen / Reopen No Violations Drilling operations are ongoing they are 1750 feet deep with the construction of this well.
1264631133 2014-08-26 Drill / Deepen / Reopen No Violations There was no one on site during this inspection. They are currently in the process of setting the rest of the drive pipe. The drive pipe is currently at 107 feet.
1316958833 2014-09-22 Drill / Deepen / Reopen No Violations Drilling operations were ongoing during this inspection they are currently 610 feet deep with the construction of this well.
1338444579 2014-09-19 Drill / Deepen / Reopen No Violations Drilling operations were ongoing during this inspection, they are currently 560 feet deep with the construction of this well.
1354896496 2015-01-06 Drill / Deepen / Reopen No Violations They are in the process of fishing out tools that were lost down hole during this inspection.
1400376266 2015-01-15 Drill / Deepen / Reopen No Violations Drilling operations are ongoing there was no one present at the location during this inspection. No violations
1408417449 2014-08-13 Drill / Deepen / Reopen No Violations This hole was spudded on 7/23/2014, no one was on site during this inspection.
1425657785 2015-03-02 Drill / Deepen / Reopen No Violations Drilling operations are on going they are in the process of running 4 1/2 inch production casing set at 2765 feet.
1444930129 2015-10-04 Preliminary Restoration No Violations This well is in production, the location has been reclaimed. The pits have been filled and covered, all the drilling equipment has been removed from this location and the area is free of debris. This well meets the requirements for the preliminary restoration.
1527974747 2014-10-16 Drill / Deepen / Reopen No Violations Drilling operations are on going they were drilling during this inspection. They are currently 1425 feet deep in the construction of this well.
1559298058 2014-10-06 Drill / Deepen / Reopen No Violations Drilling operations are ongoing the intermediate string is set and they are 1031 feet deep in the construction of this well.
1603081664 2014-12-23 Drill / Deepen / Reopen No Violations Drilling operations are ongoing they are 2230 feet deep with the construction of the main bore.
1672154116 2014-09-08 Drill / Deepen / Reopen No Violations Drilling operations are on going they are at 325 feet and drilling. No violations during this inspection.
1777731949 2014-08-01 Drill / Deepen / Reopen No Violations The rig is on location rigged up ready to spud in new hole.
1780069363 2014-10-15 Drill / Deepen / Reopen No Violations Drilling operations were ongoing during this inspection they are currently 1375 feet deep with the construction of this well.
1832104255 2014-09-17 Drill / Deepen / Reopen No Violations The rig was setting idle. No one was on site during this inspection.
1979340017 2014-11-25 Drill / Deepen / Reopen No Violations Drilling operations are ongoing they are 2200 feet deep with the construction of the well bore.
2136735601 2015-03-03 Drill / Deepen / Reopen No Violations Cemenco Service llc. Was on site to cement in the 4 1/2 inch production casing today.

For data sources see[8]

References