If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Meigs_County,_Ohio|Meigs]] | | County: [[Meigs_County,_Ohio|Meigs]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Chester Township,_Meigs_County,_Ohio|Chester Township]] |
|- | |- | ||
| Operator Name: [[RAINBOW OIL & GAS]] | | Operator Name: [[RAINBOW OIL & GAS]] |
Well ID: 34-105-23730 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.116865857,"lon":-81.91569923,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Chester Township | |
Operator Name: RAINBOW OIL & GAS | |
Well Pad ID: | |
Farm/Lease Name: GEORGE PARKER (ERP #9) | |
License Status: Producing | |
License Date: 2018-06-05 | |
Spud Date: 2014-06-07 | |
Spud Drilling Contractor: CO TOOLS | |
Final Drill Date: 2014-10-27 | |
Well Total Depth: 1850 ft | |
Configuration: Vertical | |
Latitude: 39.116865857 | |
Longitude: -81.91569923 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-10-17 | Proposed Formations:BEREA, Issued Date:10/17/2013, Expired Date:10/17/2015 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:POOL |
Last Compliance Report | 2014-07-07 | |
Reached Total Depth | 2014-10-27 | |
Completion Report Received | 2016-08-01 | |
APP | 2018-06-05 | Proposed Formations:BEREA- BEDFORD SHALE, Issued Date:6/5/2018, Expired Date:6/4/2020 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:EOR, Proposed Well Class:ERP |
Record Last Modified | 2019-06-11 | |
Construction Permit Expires | 2020-06-04 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-08-04 | 1782 | 1787 | 14 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | RAINBOW OIL & GAS | 190 | 45 | 185 |
2017 | RAINBOW OIL & GAS | 0 | 0 | 0 |
2018 | RAINBOW OIL & GAS | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | RAINBOW OIL & GAS | Brine | 43 | 185 |
2017 | RAINBOW OIL & GAS | Brine | 0 | 0 |
2018 | RAINBOW OIL & GAS | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0222604508 | 2014-09-25 | Drill / Deepen / Reopen | No Violations | Not working today. |
0414453524 | 2014-06-24 | Drill / Deepen / Reopen | No Violations | Not working, the pit is in good condition. |
0419921487 | 2014-11-04 | Drill / Deepen / Reopen | No Violations | Pit still open, rig and pipe trailer still on site. |
0952068234 | 2017-10-05 | Production Wells | No Violations | Inspection today indicated that well was in production and pumpjack was running when myself and county inspector arrived on site to check wellsite for compatibility to be converted to a enhanced recovery project. |
0975937883 | 2018-10-31 | Enhanced Recovery Project | No Violations | Convert to ERP. Appalachian wire line on site to perf the production casing from 1788 feet to 1824 feet with 37 shots. |
1021579987 | 2015-02-05 | Preliminary Restoration | No Violations | The pits have been filled as part of the preliminary restoration requirements. Site not graded and drilling equipment still on site. |
1078918168 | 2015-07-23 | Drill / Deepen / Reopen | No Violations | Follow up to 1435857584. The rig and some of the equipment had been moved from the site. The remainder of the equipment will be moved off today. |
1085135886 | 2014-06-20 | Drill / Deepen / Reopen | No Violations | Not working. The pit is in good condition. |
1131550346 | 2019-01-08 | Production Wells | No Violations | Permit to convert to enhanced recovery well. No activity on site. The well is shut in with a 4.5 inch by 2 inch swedge with a 2 inch valve (shut) and a 2 inch plug. The access road gate was closed. |
1147820244 | 2014-10-21 | Drill / Deepen / Reopen | No Violations | Not drilling today. |
1183921690 | 2014-10-27 | Drill / Deepen / Reopen | No Violations | I was on location to witness Formation Cement set the 4.5 casing using 33 sacks of Class A EA-2 cement. The bottom of the casing was set at 1832. |
1402166228 | 2014-06-07 | Drill / Deepen / Reopen | No Violations | Witnessed surface casing cement job. 450 feet of new 7 casing set in 458 feet of 8 3/4 borehole with 115 sacks of Class A cement. Circulation established and good returns seen at the surface and stayed up. |
1403032182 | 2014-06-17 | Drill / Deepen / Reopen | No Violations | Arrived on site to administer casing pressure test and Annular Disposal fresh water surface casing pressure test. I was unable to administer the tests due to a malfunction on the pump at the rig. |
1405604150 | 2014-07-17 | Drill / Deepen / Reopen | No Violations | Drilling below the surface casing. |
1408565521 | 2014-08-19 | Drill / Deepen / Reopen | No Violations | Well has been drilled to total depth but is caving in. Company is trying to decide whether or not to plug well on active drilling permit. |
1409764069 | 2014-08-29 | Drill / Deepen / Reopen | No Violations | Currently running production casing. Well total depth was reached at 1850 feet, plan to run casing to 1845 feet. |
1410900305 | 2014-09-16 | Drill / Deepen / Reopen | No Violations | Production casing not run yet, the pit is holding but has been open for much longer than anticipated. |
1411565972 | 2014-09-24 | Drill / Deepen / Reopen | No Violations | Not currently working. |
1424893901 | 2015-02-25 | Drill / Deepen / Reopen | No Violations | I was on location with Inspector Josh Garland. The well is currently shut in and the rig is still in place. |
1424895296 | 2015-02-24 | Drill / Deepen / Reopen | No Violations | The pits have been filled as part of the preliminary restoration requirements. Site not graded and drilling equipment still on site. |
1435857584 | 2015-07-01 | Preliminary Restoration | Violations Noted | All the drilling equipment is still on site. The pit is closed but the site has not been graded or reseeded. All drilling equipment must be removed from the site, the ground must be graded, and vegetative cover must be established in order to prevent erosion. |
1587643230 | 2014-06-30 | Drill / Deepen / Reopen | No Violations | Not working today, pit is in good shape. |
1627870663 | 2014-07-01 | Drill / Deepen / Reopen | No Violations | Witnessed surface casing pressure test. 300 psi were held on the surface casing with no loss in pressure over the required 30 minute testing period. |
1687725226 | 2019-04-09 | Production Wells | No Violations | Permit to convert to ERP. No activity on the site. Access road gate is closed. |
1746417878 | 2014-07-24 | Drill / Deepen / Reopen | No Violations | Currently drilling at 1350 feet. The pit level is being monitored as the company drills through the Big Injun sand. |
1928701421 | 2014-11-14 | Drill / Deepen / Reopen | No Violations | Pits still open, drilling rig and pipe trailer on site. |
1956064827 | 2015-08-06 | Preliminary Restoration | No Violations | Follow up to 1435857584. Drilling pits closed, site graded and seeded, drilling equipment removed from site. |
2056182667 | 2017-10-27 | Enhanced Recovery Project | No Violations | Inspected site for possible conversion to a Enhanced Recovery Project . |
2121319167 | 2014-05-29 | Drill / Deepen / Reopen | No Violations | Well not spudded yet. Checking on site and pit construction. A large pit has been constructed on the side of the location to hold the water that will be used for drilling. |
2126828069 | 2014-06-18 | Drill / Deepen / Reopen | No Violations | Drill rig is having mechanical problems and they are waiting to test the surface casing until the rig is operational. I talked to Jeff Burke about the water truck that he recently purchased. The truck is labeled for Roscoe Mills UIC # 25-388. I told Jeff that he needs to get registered as a brine hauler. Jeff told me that he is only hauling fresh water for drilling at this time. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1435857584 | US-OH-112726 | 2016-02-05 | Failure to restore within six months |
For data sources see[8]