If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Hardin_County,_Ohio|Hardin]] | | County: [[Hardin_County,_Ohio|Hardin]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Goshen Township,_Hardin_County,_Ohio|Goshen Township]] |
|- | |- | ||
| Operator Name: [[ENERVEST OPERATING LLC]] | | Operator Name: [[ENERVEST OPERATING LLC]] |
Well ID: 34-065-20143 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.685442475,"lon":-83.45248379,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Hardin | |
Municipality: Goshen Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: DIETZ J ETAL | |
License Status: Final Restoration | |
License Date: 2016-06-23 | |
Spud Date: 2007-05-02 | |
Spud Drilling Contractor: ALPHA DRILLING | |
Final Drill Date: 2007-05-04 | |
Well Total Depth: 1709 ft | |
Configuration: Vertical | |
Latitude: 40.685442475 | |
Longitude: -83.45248379 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-09-12 | Proposed Formations:TRENTON, Issued Date:9/12/2005, Expired Date:9/12/2006 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EW |
APP | 2006-09-01 | Proposed Formations:TRENTON, Issued Date:9/1/2006, Expired Date:9/1/2007 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EW |
Reached Total Depth | 2007-05-04 | |
Completion Report Received | 2008-12-22 | |
Change of Owner | 2009-12-14 | Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC |
APP | 2016-06-23 | Proposed Formations:TRENTON LIMESTONE, Issued Date:6/23/2016, Expired Date:6/23/2018 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2017-05-30 | |
Construction Permit Expires | 2018-06-23 | |
Record Last Modified | 2018-08-13 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-01-22 | 1310 | 1311 | 12 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 850 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | EXCO - NORTH COAST ENERGY INC | 0 | 0 | 0 |
2008 | EXCO - NORTH COAST ENERGY INC | 0 | 0 | 366 |
2009 | EXCO - NORTH COAST ENERGY INC | 0 | 0 | 0 |
2010 | ENERVEST OPERATING LLC | 0 | 0 | 0 |
2011 | ENERVEST OPERATING LLC | 0 | 0 | 0 |
2012 | ENERVEST OPERATING LLC | 0 | 0 | 0 |
2013 | ENERVEST OPERATING LLC | 0 | 0 | 365 |
2014 | ENERVEST OPERATING LLC | 0 | 0 | 0 |
2015 | ENERVEST OPERATING LLC | 0 | 0 | 1 |
2016 | ENERVEST OPERATING LLC | 0 | 0 | 3 |
2017 | ENERVEST OPERATING LLC | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | EXCO - NORTH COAST ENERGY INC | Brine | 0 | 0 |
2008 | EXCO - NORTH COAST ENERGY INC | Brine | 0 | 366 |
2009 | EXCO - NORTH COAST ENERGY INC | Brine | 0 | 0 |
2010 | ENERVEST OPERATING LLC | Brine | 0 | 0 |
2011 | ENERVEST OPERATING LLC | Brine | 0 | |
2012 | ENERVEST OPERATING LLC | Brine | 0 | 0 |
2013 | ENERVEST OPERATING LLC | Brine | 0 | 365 |
2014 | ENERVEST OPERATING LLC | Brine | 0 | 0 |
2015 | ENERVEST OPERATING LLC | Brine | 0 | 1 |
2016 | ENERVEST OPERATING LLC | Brine | 0 | 3 |
2017 | ENERVEST OPERATING LLC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0429409713 | 2016-07-01 | Production Wells | Violations Noted | Production equipment has been removed from site and well casing with 2 inch valve remains. Plugging permit has been issued and received. Soybeans are planted between well site and entry to field. |
0457498232 | 2007-05-03 | Drill / Deepen / Reopen | No Violations | Inspect drill site and collect surface cement ticket. Drilling at 917 feet. Surface casing set at 336 feet. |
1150170536 | 2017-06-01 | Final Restoration | No Violations | Site has been leveled and well casing has been cut off below the surface and removed. Will need a landowner waiver to approve final restoration for the stone apron at road. |
1204644048 | 2008-03-04 | Production Wells | No Violations | Site not restored, covered w/water from recent rains. Pits due in October of 2007. Preliminary due February of 2008. |
1209051959 | 2008-04-24 | Preliminary Restoration | Violations Noted | Chk well and drilling site.
> Drilling pit not closed, pit liner no longer functional. > Preliminary restoration not done. > Pits due in October of 2007. Preliminary due February of 2008. |
1210183285 | 2008-05-07 | Production Wells | No Violations | Chk on pit closure.
At 10:43 AM I received a call form Bob Creger, he stated that the drilling pit has been closed and that as soon as the contractor can get to the site. He will put the top soil back and grade the site. Chk the status of drilling pit closure. Pit has been closed. (Site is wet) Needs more work. |
1211464767 | 2008-05-22 | Production Wells | No Violations | On site to chk on progress of preliminary restoration. Pits closed, needs to have the top soil put back and graded. |
1213201841 | 2008-06-11 | Production Wells | No Violations | Preliminary Restoration done. Notice of Violation Resolved.
> Drilling pits closed, top soil put back and graded. |
1378037650 | 2017-05-23 | Administrative Inspection | No Violations | Met with representative from Enervest about the requirements to plug well. Representative stated plans to plug well in very near future. Asked for advance notice before service rig is on site. |
1488560874 | 2017-03-03 | Production Wells | No Violations | No identification at site. Well consist of 13.375 drive pipe, 9.625 conductor casing at the surface and 7 inch surface casing. The production casing extends above the surface and has three manual valves in the closed position. There is no production equipment on site and well does have a pending plugging permit. |
1518229229 | 2017-05-30 | Plug / Plug Back | No Violations | Well was plugged by the placing of three cement plugs. Cement was installed by pumping and the used of the 4.5 inch production casing to place the plugs at the proper depths. The production casing was ripped at a depth of approximately 611 deep and removed from well. After approximately 45 minutes after the surface plug was placed, it was witnessed to slump to a depth of approximately 30 inches. |
1523286827 | 2018-04-09 | Final Restoration | No Violations | Have not received landowner waiver for the stone apron that was installed when well was originally drilled. Contacted representative of operator and he will send a copy of the landowner waiver so that final restoration can be completed. Final restoration is not approved at the present time. |
1531768385 | 2018-07-16 | Final Restoration | No Violations | Final restoration is approved. Landowner waiver has been received in order to leave steel culvert in place. |
2073189064 | 2017-05-26 | Plug / Plug Back | No Violations | Plugging contractor installed fresh water to well in order to be able to pull tubing. Tubing is removed from well and plugging procedure will continue next week. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0429409713 | US-OH-124591 | 2016-07-26 | 9-9-05(A)10 | Failure to legibly identify well |
0429409713 | US-OH-124592 | 2016-07-26 | NONE | Well shall be plugged |
1209051959 | US-OH-105450 | 2008-04-24 | Failure to fill pits within 5 mos. (CHANGE) (REPLACE) | |
1209051959 | US-OH-105451 | 2008-04-24 | Failure to restore land surface within 9 mos. (CHANGE) (REPLACE) |
For data sources see[9]