X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-167-29709"

m
m
Line 9: Line 9:
 
| State: Ohio
 
| State: Ohio
 
|-
 
|-
| County: [[Washington_County,_Ohio|Washington]]
+
| County: <County>
 
|-
 
|-
 
| Municipality: [[Liberty Township,_Washington_County,_Ohio|Liberty Township]]
 
| Municipality: [[Liberty Township,_Washington_County,_Ohio|Liberty Township]]

Revision as of 17:41, 13 August 2019

Well Details

Well ID: 34-167-29709
Loading map...
Country: United States
State: Ohio
County: <County>
Municipality: Liberty Township
Operator Name: GAS ENTERPRISE COMPANY INC
Well Pad ID:
Farm/Lease Name: R WILLIAMS
License Status: Producing
License Date: 2012-06-22
Spud Date: 2012-07-19
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC
Final Drill Date: 2012-07-27
Well Total Depth: 3438 ft
Configuration: Vertical
Latitude: 39.545611696
Longitude: -81.30688661

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2012-06-22 Proposed Formations:OHIO SHALE, Issued Date:6/22/2012, Expired Date:6/22/2014 12:00:00 PM, Drilling unit acres:79, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2012-07-27
Construction Permit Expires 2014-06-22
Completion Report Received 2015-03-31
Record Last Modified 2017-10-23

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-04-01 3150 3156 7
2015-04-01 3138 3145 9
2015-04-01 3170 3178 9
2015-04-01 3428 3438 11
2015-04-01 3410 3413 3

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-08-16 H2O 0 2300 Bbl 2000 Producers Service Corporation Ran acid ahead to break down well at 1138#, then dropped 75 balls, waited 30 min., then continued to frac the zone with acid, balls and sand.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 GAS ENTERPRISE COMPANY INC 0 0 365
2014 GAS ENTERPRISE COMPANY INC 697 0 365
2015 GAS ENTERPRISE COMPANY INC 935 848 365
2016 GAS ENTERPRISE COMPANY INC 396 832 365
2017 GAS ENTERPRISE COMPANY INC 551 438 365
2018 GAS ENTERPRISE COMPANY INC 1082 270 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 GAS ENTERPRISE COMPANY INC Brine 0 365
2014 GAS ENTERPRISE COMPANY INC Brine 152 365
2015 GAS ENTERPRISE COMPANY INC Brine 240 365
2016 GAS ENTERPRISE COMPANY INC Brine 240 365
2017 GAS ENTERPRISE COMPANY INC Brine 0 365
2018 GAS ENTERPRISE COMPANY INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0913202341 2012-07-24 Drill / Deepen / Reopen No Violations I was called out 7/19 for surface casing job but found rig still drilling. When hole cleaned up, surface casing was run but found tally incorrect and only had 1365 instead of 1550. This well took a lot of water to circulate, having to fill empty hole drilled too deep. 7/20 -Cement circulated just as water ran out - fell back slightly when shut in. Operator, Jim Williams added/topped off outside of casing with 12 sacks dry cement. Rig called this day to say broke down, going for parts and will be back drilling 7/25.
1067142077 2017-11-01 Production Wells No Violations The inspection this day revealed that this well is equipped with a pumping unit, 4 1/2 inch diameter production casing, and 2 inch diameter production tubing. The valves on the wellhead are open at the time of inspection. The tank battery for this well is equipped with two (2) 100 barrel steel tanks. There are no issues to report at this time and the well is in production at the time of inspection.
1297341434 2014-10-07 Drill / Deepen / Reopen No Violations Upon inspection, it was observed that the well location is still in need of stabilization. A new tank battery consisting of two 100 bbl production tanks has been installed on the hill above the well. I spoke with James Williams of Gas Enterprise Co. and he stated that the separator, drip, and meter would be moved up to the new tank battery location and the entire well location would be seeded and mulched to fit preliminary restoration requirements. I will go back to this location in dry conditions and take current GPS readings for the well head, tanks, and entry point.
1431519972 2015-05-12 Production Wells No Violations Upon inspection, it was observed that this well location is still noncompliant. The frac tanks have been removed and the location has been re-graded. The entire well location is still void of vegetation. I spoke recently with Mr. Jim Williams of Gas Enterprise Co. and he stated that he would be seeding and mulching the location this spring. I will contact Mr. Williams again and inquire about when he plans on having the location restored.
1439028328 2014-08-22 Preliminary Restoration Violations Noted Upon inspection, it was observed that the preliminary restoration for this well location is not complete. A large portion of the location is void of vegetation and is allowing sediment to runoff into the valley below. Due to heavy rain, I was able to observe soil being eroded away by overland flow. The lease road has been re-graded recently and there is a bulldozer on location. The area around the well itself needs to be re-graded and seeded/mulched to encourage stabilization of the soil before the growing season is over. I will contact Mr. Jim Williams of Gas Enterprise Co. and notify him of this situation. Gas Enterprise Co. will have until 9/19/2014 to complete the preliminary restoration.
1679054973 2014-10-07 Administrative Inspection No Violations Mr. James Williams of Gas Enterprise Co. called on 10/7/2014 inquiring about what needed done to this location to fit preliminary restoration requirements. I explained that all drilling/frac equipment needed to be removed from the location, the lease road must be maintained, and all disturbed soil must be regraded and stabilized with a vegetative cover. Mr. Williams agreed to work toward meeting the preliminary restoration requirements as soon as possible.
1954947192 2015-10-01 Preliminary Restoration No Violations Upon inspection, it was observed that preliminary restoration activities for this location have been successfully completed. The location has been graded, all frac tanks and drilling equipment have been removed, and there is a full vegetative cover throughout the location. The compliance notice dated 8/22/2014 can be closed out. Preliminary restoration passed 10/1/2015. I was accompanied on this inspection by Inspector Brian Sefcik.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
1439028328 US-OH-112690 2015-10-06 Failure to restore within six months

For data sources see[9]

References