If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Licking_County,_Ohio|Licking]] | | County: [[Licking_County,_Ohio|Licking]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Eden Township,_Licking_County,_Ohio|Eden Township]] |
|- | |- | ||
| Operator Name: [[LBJ DRILLING CO INC]] | | Operator Name: [[LBJ DRILLING CO INC]] |
Well ID: 34-089-24905 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.211242116,"lon":-82.28348901,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Licking | |
Municipality: Eden Township | |
Operator Name: LBJ DRILLING CO INC | |
Well Pad ID: | |
Farm/Lease Name: BAKER PAUL & ANNA LOUISE | |
License Status: Producing | |
License Date: 1984-02-23 | |
Spud Date: 1984-03-16 | |
Spud Drilling Contractor: CO TOOLS | |
Final Drill Date: 1984-03-21 | |
Well Total Depth: 2915 ft | |
Configuration: Vertical | |
Latitude: 40.211242116 | |
Longitude: -82.28348901 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1984-02-23 | Issued Date 2/23/84 Expired Date 8/21/84 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 02915 Proposed Drill Depth 02915 |
Original Spud | 1984-03-16 | |
Completed | 1984-03-21 | |
Reached Total Depth | 1984-03-21 | |
CO | 1984-03-27 | 226 LBJ DRILLING CO INC GeoDate 2/23/84 |
Completion Report Received | 1984-04-05 | |
Construction Permit Expires | 1984-08-21 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 2830 | 2872 | 18 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 0 | 0 | FRAC WATER,SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | LBJ DRILLING CO INC | 2028 | 2373 | 0 |
1985 | LBJ DRILLING CO INC | 854 | 225 | 365 |
1986 | LBJ DRILLING CO INC | 4665 | 973 | 365 |
1987 | LBJ DRILLING CO INC | 304 | 881 | 365 |
1988 | LBJ DRILLING CO INC | 1664 | 348 | 365 |
1989 | LBJ DRILLING CO INC | 425 | 537 | 365 |
1990 | LBJ DRILLING CO INC | 0 | 721 | 365 |
1991 | LBJ DRILLING CO INC | 0 | 563 | 365 |
1992 | LBJ DRILLING CO INC | 0 | 40 | 365 |
1993 | LBJ DRILLING CO INC | 0 | 407 | 365 |
1994 | LBJ DRILLING CO INC | 0 | 311 | 365 |
1995 | LBJ DRILLING CO INC | 0 | 165 | 365 |
1997 | LBJ DRILLING CO INC | 377 | 0 | 365 |
1998 | LBJ DRILLING CO INC | 726 | 0 | 365 |
2000 | LBJ DRILLING CO INC | 627 | 0 | 365 |
2001 | LBJ DRILLING CO INC | 0 | 29 | 365 |
2002 | LBJ DRILLING CO INC | 0 | 36 | 365 |
2003 | LBJ DRILLING CO INC | 0 | 39 | 365 |
2005 | LBJ DRILLING CO INC | 0 | 65 | 365 |
2011 | LBJ DRILLING CO INC | 0 | 888 | 365 |
2012 | LBJ DRILLING CO INC | 0 | 952 | 366 |
2013 | LBJ DRILLING CO INC | 0 | 692 | 365 |
2014 | LBJ DRILLING CO INC | 0 | 340 | 365 |
2015 | LBJ DRILLING CO INC | 0 | 1015 | 365 |
2016 | LBJ DRILLING CO INC | 0 | 518 | 365 |
2017 | LBJ DRILLING CO INC | 0 | 637 | 365 |
2018 | LBJ DRILLING CO INC | 0 | 340 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | LBJ DRILLING CO INC | Brine | 0 | 0 |
1985 | LBJ DRILLING CO INC | Brine | 1210 | 365 |
1986 | LBJ DRILLING CO INC | Brine | 985 | 365 |
1987 | LBJ DRILLING CO INC | Brine | 725 | 365 |
1988 | LBJ DRILLING CO INC | Brine | 290 | 365 |
1989 | LBJ DRILLING CO INC | Brine | 545 | 365 |
1990 | LBJ DRILLING CO INC | Brine | 555 | 365 |
1991 | LBJ DRILLING CO INC | Brine | 500 | 365 |
1992 | LBJ DRILLING CO INC | Brine | 505 | 365 |
1993 | LBJ DRILLING CO INC | Brine | 320 | 365 |
1994 | LBJ DRILLING CO INC | Brine | 240 | 365 |
1995 | LBJ DRILLING CO INC | Brine | 80 | 365 |
1997 | LBJ DRILLING CO INC | Brine | 80 | 365 |
1998 | LBJ DRILLING CO INC | Brine | 470 | 365 |
2000 | LBJ DRILLING CO INC | Brine | 135 | 365 |
2001 | LBJ DRILLING CO INC | Brine | 0 | 365 |
2002 | LBJ DRILLING CO INC | Brine | 150 | 365 |
2003 | LBJ DRILLING CO INC | Brine | 145 | 365 |
2005 | LBJ DRILLING CO INC | Brine | 300 | 365 |
2011 | LBJ DRILLING CO INC | Brine | 975 | 365 |
2012 | LBJ DRILLING CO INC | Brine | 895 | 366 |
2013 | LBJ DRILLING CO INC | Brine | 525 | 365 |
2014 | LBJ DRILLING CO INC | Brine | 1195 | 365 |
2015 | LBJ DRILLING CO INC | Brine | 665 | 365 |
2016 | LBJ DRILLING CO INC | Brine | 110 | 365 |
2017 | LBJ DRILLING CO INC | Brine | 350 | 365 |
2018 | LBJ DRILLING CO INC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
000PL13709 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0980218089 | 2018-01-16 | Production Wells | No Violations | My inspection revealed that the well was equipped with a pumping unit and gas motor. The well was pumping during inspection. The tank battery consists of (2) 100 barrel tanks inside an earthen dike. I took GPS readings at the well and tank battery. Identification was posted at the tank battery. Time of inspection: 1:10 PM. Weather: 12*F, Partly cloudy/7 snow. |
For data sources see[9]