If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Summit_County,_Ohio|Summit]] | | County: [[Summit_County,_Ohio|Summit]] | ||
|- | |- | ||
− | | Municipality: | + | | Municipality: [[Akron City,_Summit_County,_Ohio|Akron City]] |
|- | |- | ||
| Operator Name: [[EVERFLOW EASTERN PTNS L P]] | | Operator Name: [[EVERFLOW EASTERN PTNS L P]] |
Well ID: 34-153-22816 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.124011213,"lon":-81.53720755,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Akron City | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: GRIMM UNIT | |
License Status: Producing | |
License Date: 1995-06-08 | |
Spud Date: 1995-06-26 | |
Spud Drilling Contractor: J & J DIRECTIONAL SERVICE | |
Final Drill Date: 1995-07-27 | |
Well Total Depth: 4330 ft | |
Configuration: Directional | |
Latitude: 41.124011213 | |
Longitude: -81.53720755 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1995-06-08 | 84 EVERFLOW EASTERN PTNS L P GeoDate 6/8/95 |
Oil and Gas | 1995-06-08 | Issued Date 6/8/95 Expired Date 6/7/96 Acres 0072650 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04330 Proposed Drill Depth 04330 |
Original Spud | 1995-06-25 | CHG TGT 4-5-97 |
Completed | 1995-07-27 | CHG TGT 4-5-97 |
Reached Total Depth | 1995-07-27 | CHG TGT 4-5-97 |
Completion Report Received | 1995-09-22 | CHG TGT 4-5-97 |
Construction Permit Expires | 1996-06-07 | CHG TGT 4-5-97 |
Record Last Modified | 2017-02-15 | CHG TGT 4-5-97 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4066 | 4159 | 0 |
2006-09-11 | 4090 | 4161 | 95 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 121000 Gal | 80000 | FRAC W/121M GAL WATER & 80M# SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0301131449 | 2005-01-03 | Production Wells | No Violations | Status check inspection - no violations at this time. |
1174970371 | 2008-01-31 | Production Wells | No Violations | Status check inspection - no violations at this time. |
1545925193 | 2018-12-27 | UrbanProduction Wells | No Violations | Access was graveled to the wellhead and tank battery. The wellhead was constructed to operated as a plunger lift well. The wellhead was surrounded with a locked chain link fence. Legible signage was posted. The tank battery was surrounded with an earthen dike and locked chain link fence. Legible I. D. signage was posted. The tank battery consisted of one (1) 210 barrel stock tank, two (2) 100 barrel tank and one (1) 50 barrel tank and one (1) 2410 separator. The load lines were plugged and the oil line locked. |
For data sources see[9]