X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-23026"

m
m
Line 11: Line 11:
 
| County: [[Summit_County,_Ohio|Summit]]
 
| County: [[Summit_County,_Ohio|Summit]]
 
|-
 
|-
| Municipality: Northampton Township
+
| Municipality: [[Cuyahoga Falls City,_Summit_County,_Ohio|Cuyahoga Falls City]]
 
|-
 
|-
 
| Operator Name: [[SOUND ENERGY CO INC]]
 
| Operator Name: [[SOUND ENERGY CO INC]]

Revision as of 05:39, 14 August 2019

Well Details

Well ID: 34-153-23026
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Cuyahoga Falls City
Operator Name: SOUND ENERGY CO INC
Well Pad ID:
Farm/Lease Name: BATH CREEK
License Status: Producing
License Date: 2007-11-16
Spud Date: 2007-12-21
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2008-01-03
Well Total Depth: 3888 ft
Configuration: Vertical
Latitude: 41.153568330
Longitude: -81.51506291

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2007-11-16 Proposed Formations:CLINTON, Issued Date:11/16/2007, Expired Date:11/15/2008 6:00:00 AM, Drilling unit acres:44.85, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-01-03
Completion Report Received 2008-02-19
Construction Permit Expires 2008-11-15
Change of Owner 2015-07-06 Operator changed from 7626, M & M ROYALTY LTD to 4327, SOUND ENERGY CO INC
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-05-27 3694 3770 49

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1500 Bbl 60000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 M & M ROYALTY LTD 1853 1007 212
2009 M & M ROYALTY LTD 2614 730 365
2010 M & M ROYALTY LTD 1907 490 365
2011 M & M ROYALTY LTD 1721 463 365
2012 M & M ROYALTY LTD 1100 0 366
2013 M & M ROYALTY LTD 793 0 365
2014 M & M ROYALTY LTD 437 112 365
2015 SOUND ENERGY CO INC 0 0 0
2016 SOUND ENERGY CO INC 999 552 365
2017 SOUND ENERGY CO INC 707 216 365
2018 SOUND ENERGY CO INC 628 114 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 M & M ROYALTY LTD Brine 378 212
2009 M & M ROYALTY LTD Brine 411 365
2010 M & M ROYALTY LTD Brine 226 365
2011 M & M ROYALTY LTD Brine 197 365
2012 M & M ROYALTY LTD Brine 41 366
2013 M & M ROYALTY LTD Brine 0 365
2014 M & M ROYALTY LTD Brine 0 365
2015 SOUND ENERGY CO INC Brine 0 0
2016 SOUND ENERGY CO INC Brine 248 365
2017 SOUND ENERGY CO INC Brine 158 365
2018 SOUND ENERGY CO INC Brine 149 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
1193687101 2007-12-17 Drill / Deepen / Reopen No Violations Independence Excavating has started building the lease road and the drilling location. The rig should be arriving on the 21st.
1201815388 2008-01-24 Drill / Deepen / Reopen No Violations Turbo Excavating and Chem Tech are on site to start solidifying the drilling pits.
1312081283 2008-08-11 Production Wells No Violations I received photos from Dave Ritter (Summit Soil & Water) showing sediment running off of the driveway leading to this location. There was no evidence of sedimentation in the road ditch. I called and left a message for Dave that I will ask the company to seed the exposed banks of the road cut. Preliminary restoration is not due until the end of September.
1435038273 2008-05-07 Drill / Deepen / Reopen No Violations Turbo Excavating is on site to lay the flowline. The tank battery location has been moved several hundred feet east of where it was proposed with the application. The company will need to submit a revised aerial photograph and map to reflect the new location.
1483597966 2008-01-30 Drill / Deepen / Reopen No Violations The pits have been solidified and closed and the site has been rough graded. The lease road and location are in good condition. The complaint from Mr. Finan has been resolved with the removal of the trackhoe and bulldozer from the lease road.
1765023430 2010-02-05 Drill / Deepen / Reopen No Violations checked site for tour on Senate Bill 165.
1959361201 2008-09-18 Preliminary Restoration No Violations Preliminary restoration is due by the end of the month. Grading and seeding still need to be finished around the entrance and the lease road to the tank battery. I called Mike Weinsz and informed him of what needed to be done.

For data sources see[9]

References