X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-23066"

m
m
Line 11: Line 11:
 
| County: [[Summit_County,_Ohio|Summit]]
 
| County: [[Summit_County,_Ohio|Summit]]
 
|-
 
|-
| Municipality: [[Coventry_Township,_Summit_County,_Ohio|Coventry Township]]
+
| Municipality: [[Coventry Township,_Summit_County,_Ohio|Coventry Township]]
 
|-
 
|-
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]

Revision as of 05:43, 14 August 2019

Well Details

Well ID: 34-153-23066
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Coventry Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: LAKEVIEW ELEMENTARY UNIT
License Status: Producing
License Date: 2008-10-08
Spud Date: 2008-11-10
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2008-11-16
Well Total Depth: 4239 ft
Configuration: Vertical
Latitude: 41.008751033
Longitude: -81.52426617

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-10-08 Proposed Formations:CLINTON, Issued Date:10/8/2008, Expired Date:10/8/2009 6:00:00 AM, Drilling unit acres:47.01, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-11-16
Completion Report Received 2008-12-09
Correction to Well 2009-04-03 CORRECTION TO FOOTAGE, SHOULD BE "650'NL & 100'EL OF LOT 4, TRACT 12".
Construction Permit Expires 2009-10-08
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2009-01-27 4002 4080 35

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 99000 Gal 70000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 EVERFLOW EASTERN PTNS L P 0 0 0
2009 EVERFLOW EASTERN PTNS L P 10482 1246 358
2010 EVERFLOW EASTERN PTNS L P 15110 1647 365
2011 EVERFLOW EASTERN PTNS L P 10589 1305 365
2012 EVERFLOW EASTERN PTNS L P 7408 963 366
2013 EVERFLOW EASTERN PTNS L P 5600 986 365
2014 EVERFLOW EASTERN PTNS L P 5562 802 365
2015 EVERFLOW EASTERN PTNS L P 4051 697 365
2016 EVERFLOW EASTERN PTNS L P 0 0 0
2017 EVERFLOW EASTERN PTNS L P 2224 531 365
2018 EVERFLOW EASTERN PTNS L P 2087 526 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 EVERFLOW EASTERN PTNS L P Brine 0 0
2009 EVERFLOW EASTERN PTNS L P Brine 519 358
2010 EVERFLOW EASTERN PTNS L P Brine 359 365
2011 EVERFLOW EASTERN PTNS L P Brine 250 365
2012 EVERFLOW EASTERN PTNS L P Brine 133 366
2013 EVERFLOW EASTERN PTNS L P Brine 152 365
2014 EVERFLOW EASTERN PTNS L P Brine 103 365
2015 EVERFLOW EASTERN PTNS L P Brine 79 365
2016 EVERFLOW EASTERN PTNS L P Brine 22 0
2017 EVERFLOW EASTERN PTNS L P Brine 106 365
2018 EVERFLOW EASTERN PTNS L P Brine 22 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0440449040 2009-01-23 Production Wells No Violations The well is now in production and the required fencing and identification are in place. Preliminary restoration will be evaluated as soon as weather permits but is not required until this summer.
0554554973 2008-12-10 Drill / Deepen / Reopen No Violations The site has been graded, the wellhead fenced and the flowline installed.
0594391346 2008-11-12 Drill / Deepen / Reopen No Violations Wildcat switched over to fluid this afternoon after reaching the top of the Big Lime, as required by permit. The location is fenced and the pits are lined and in good condition. No violations at this time.
0707636156 2008-11-24 Drill / Deepen / Reopen No Violations The pits were solidified with 65 tons of cement dust on 11/22. The pits will be covered today with the frac scheduled for Monday 12/1. No violations at this time.
1002054984 2008-11-10 Drill / Deepen / Reopen No Violations Wildcat is on location and spudded the well today. The drilling pits are fenced and lined as required. No violations at this time.
1227212608 2008-11-18 Drill / Deepen / Reopen No Violations Wildcat moved off on 11/17. The location is fenced and the pits are lined and in good condition. Everflow plans to solidify the pits on Saturday 11/22.
1245956983 2009-06-17 Production Wells No Violations Left a voice mail on the home phone of the complaintant and asked that she call me with questions. Everflow has contacted North Coast Labs to collect a new water sample to compare with the pre-drilling results. I am waiting for these results.
1266956546 2010-02-18 Preliminary Restoration No Violations Preliminary restoration is approved.
1711599157 2008-11-14 Drill / Deepen / Reopen No Violations Wildcat is drilling ahead and should TD the well tomorrow. The pits are in good condition and the location is fenced. No violations at this time.

For data sources see[9]

References