If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Summit_County,_Ohio|Summit]] | | County: [[Summit_County,_Ohio|Summit]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Coventry Township,_Summit_County,_Ohio|Coventry Township]] |
|- | |- | ||
| Operator Name: [[EVERFLOW EASTERN PTNS L P]] | | Operator Name: [[EVERFLOW EASTERN PTNS L P]] |
Well ID: 34-153-23066 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.008751033,"lon":-81.52426617,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Coventry Township | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: LAKEVIEW ELEMENTARY UNIT | |
License Status: Producing | |
License Date: 2008-10-08 | |
Spud Date: 2008-11-10 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2008-11-16 | |
Well Total Depth: 4239 ft | |
Configuration: Vertical | |
Latitude: 41.008751033 | |
Longitude: -81.52426617 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-10-08 | Proposed Formations:CLINTON, Issued Date:10/8/2008, Expired Date:10/8/2009 6:00:00 AM, Drilling unit acres:47.01, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2008-11-16 | |
Completion Report Received | 2008-12-09 | |
Correction to Well | 2009-04-03 | CORRECTION TO FOOTAGE, SHOULD BE "650'NL & 100'EL OF LOT 4, TRACT 12". |
Construction Permit Expires | 2009-10-08 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-01-27 | 4002 | 4080 | 35 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 99000 Gal | 70000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | EVERFLOW EASTERN PTNS L P | 0 | 0 | 0 |
2009 | EVERFLOW EASTERN PTNS L P | 10482 | 1246 | 358 |
2010 | EVERFLOW EASTERN PTNS L P | 15110 | 1647 | 365 |
2011 | EVERFLOW EASTERN PTNS L P | 10589 | 1305 | 365 |
2012 | EVERFLOW EASTERN PTNS L P | 7408 | 963 | 366 |
2013 | EVERFLOW EASTERN PTNS L P | 5600 | 986 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | 5562 | 802 | 365 |
2015 | EVERFLOW EASTERN PTNS L P | 4051 | 697 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | 0 | 0 | 0 |
2017 | EVERFLOW EASTERN PTNS L P | 2224 | 531 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | 2087 | 526 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | EVERFLOW EASTERN PTNS L P | Brine | 0 | 0 |
2009 | EVERFLOW EASTERN PTNS L P | Brine | 519 | 358 |
2010 | EVERFLOW EASTERN PTNS L P | Brine | 359 | 365 |
2011 | EVERFLOW EASTERN PTNS L P | Brine | 250 | 365 |
2012 | EVERFLOW EASTERN PTNS L P | Brine | 133 | 366 |
2013 | EVERFLOW EASTERN PTNS L P | Brine | 152 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | Brine | 103 | 365 |
2015 | EVERFLOW EASTERN PTNS L P | Brine | 79 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | Brine | 22 | 0 |
2017 | EVERFLOW EASTERN PTNS L P | Brine | 106 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | Brine | 22 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0440449040 | 2009-01-23 | Production Wells | No Violations | The well is now in production and the required fencing and identification are in place. Preliminary restoration will be evaluated as soon as weather permits but is not required until this summer. |
0554554973 | 2008-12-10 | Drill / Deepen / Reopen | No Violations | The site has been graded, the wellhead fenced and the flowline installed. |
0594391346 | 2008-11-12 | Drill / Deepen / Reopen | No Violations | Wildcat switched over to fluid this afternoon after reaching the top of the Big Lime, as required by permit. The location is fenced and the pits are lined and in good condition. No violations at this time. |
0707636156 | 2008-11-24 | Drill / Deepen / Reopen | No Violations | The pits were solidified with 65 tons of cement dust on 11/22. The pits will be covered today with the frac scheduled for Monday 12/1. No violations at this time. |
1002054984 | 2008-11-10 | Drill / Deepen / Reopen | No Violations | Wildcat is on location and spudded the well today. The drilling pits are fenced and lined as required. No violations at this time. |
1227212608 | 2008-11-18 | Drill / Deepen / Reopen | No Violations | Wildcat moved off on 11/17. The location is fenced and the pits are lined and in good condition. Everflow plans to solidify the pits on Saturday 11/22. |
1245956983 | 2009-06-17 | Production Wells | No Violations | Left a voice mail on the home phone of the complaintant and asked that she call me with questions. Everflow has contacted North Coast Labs to collect a new water sample to compare with the pre-drilling results. I am waiting for these results. |
1266956546 | 2010-02-18 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1711599157 | 2008-11-14 | Drill / Deepen / Reopen | No Violations | Wildcat is drilling ahead and should TD the well tomorrow. The pits are in good condition and the location is fenced. No violations at this time. |
For data sources see[9]