If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Trumbull_County,_Ohio|Trumbull]] | | County: [[Trumbull_County,_Ohio|Trumbull]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Weathersfield Township,_Trumbull_County,_Ohio|Weathersfield Township]] |
|- | |- | ||
| Operator Name: [[ENERVEST OPERATING LLC]] | | Operator Name: [[ENERVEST OPERATING LLC]] |
Well ID: 34-155-23006 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.141090154,"lon":-80.77625036,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Weathersfield Township | |
Operator Name: ENERVEST OPERATING LLC | |
Well Pad ID: | |
Farm/Lease Name: LEGLER | |
License Status: Producing | |
License Date: 1991-12-20 | |
Spud Date: 1986-09-24 | |
Spud Drilling Contractor: ARMSTRONG DRLG | |
Final Drill Date: 1986-10-01 | |
Well Total Depth: 5007 ft | |
Configuration: Vertical | |
Latitude: 41.141090154 | |
Longitude: -80.77625036 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1986-09-23 | 1702 LOMA ENTERPRISES INC GeoDate 9/23/86 |
Oil and Gas | 1986-09-23 | Issued Date 9/23/86 Expired Date 9/23/87 Acres 0000000 Tool Type RTA Proposed Formation Proposed Depth 05007 Proposed Drill Depth 05007 |
Original Spud | 1986-09-24 | CHG ACREAGE 12-21-91 |
Completed | 1986-10-01 | CHG ACREAGE 12-21-91 |
Reached Total Depth | 1986-10-01 | CHG ACREAGE 12-21-91 |
Completion Report Received | 1986-10-15 | CHG ACREAGE 12-21-91 |
CO | 1991-12-20 | 1702 LOMA ENTERPRISES INC GeoDate 12/20/91 |
Oil and Gas | 1991-12-20 | Issued Date 12/20/91 Expired Date 12/19/92 Acres 0040000 Tool Type RTA Proposed Formation CLINTON Proposed Depth Proposed Drill Depth |
Construction Permit Expires | 1992-12-19 | CHG ACREAGE 12-21-91 |
Change of Owner | 1999-10-14 | Operator changed from 1702, LOMA ENTERPRISES INC to 1388, NORTH COAST ENERGY INC |
Change of Owner | 2010-05-06 | Operator changed from 1388, EXCO - NORTH COAST ENERGY INC to 7578, ENERVEST OPERATING LLC |
Record Last Modified | 2017-02-15 | CHG ACREAGE 12-21-91 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4782 | 4886 | 2 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 220 Mscf | 0 | |||
H2O | 0 | 74000 Gal | 600 | |||
ACID | 0 | 500 Gal | 0 | FRAC: H2O,SAND,N2 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL3412 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0716294383 | 2014-04-16 | UrbanProduction Wells | No Violations | My inspection found the well in production. The well was equipped with a plunger lift unit. The tank battery consisted of a 100 barrel production tank and a separator. The dike was weathered and not capable of meeting containment requirements. A bull plug was installed on the load line. There was a 16 day production chart inside the separator. An identification sign was properly posted. The lease road was in stable condition with a locked, gate at the entrance. The well was placed into production prior to House Bill 278. I called Larry, the field supervisor. I instructed Larry to build a new dike. |
1399346315 | 2016-08-01 | UrbanProduction Wells | No Violations | At the time of my inspection, I found the well in production. The well is equipped with a plunger lift assembly. The tank battery has a storage tank and separator. A dike surrounds the tank. An identification sign is posted. The load line is secure with a bull plug. The access road is in stable condition with a locked gate at the entrance.
The equipment on the site consists of the following:
|
For data sources see[9]