If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Trumbull_County,_Ohio|Trumbull]] | | County: [[Trumbull_County,_Ohio|Trumbull]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Brookfield Township,_Trumbull_County,_Ohio|Brookfield Township]] |
|- | |- | ||
| Operator Name: [[ENERGY EXPLORATION & DEVELOPME]] | | Operator Name: [[ENERGY EXPLORATION & DEVELOPME]] |
Well ID: 34-155-23153 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.260570296,"lon":-80.61323082,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Trumbull | |
Municipality: Brookfield Township | |
Operator Name: ENERGY EXPLORATION & DEVELOPME | |
Well Pad ID: | |
Farm/Lease Name: AMY-BOYLE ENTERPRISES UNIT | |
License Status: Producing | |
License Date: 1987-12-15 | |
Spud Date: 1988-01-13 | |
Spud Drilling Contractor: [[EPC [EASTERN PETROLEUM]]] | |
Final Drill Date: 1988-01-19 | |
Well Total Depth: 5015 ft | |
Configuration: Vertical | |
Latitude: 41.260570296 | |
Longitude: -80.61323082 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1987-12-15 | 1919 EXPLORATION ENERGY INC GeoDate 12/15/87 |
Oil and Gas | 1987-12-15 | Issued Date 12/15/87 Expired Date 12/14/88 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05015 Proposed Drill Depth 05015 |
Original Spud | 1988-01-13 | |
Completed | 1988-01-19 | |
Reached Total Depth | 1988-01-19 | |
Completion Report Received | 1988-02-19 | |
Construction Permit Expires | 1988-12-14 | |
Change of Owner | 2001-03-30 | Operator changed from 1919, EXPLORATION ENERGY INC to 6929, ENERGY EXPLORATION & DEVELOP. |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4852 | 4908 | 19 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 1333 | 0 | CCF N2 | ||
H2O | 0 | 2100 Bbl | 60000 | |||
ACID | 0 | 1000 Gal | 0 | FRAC: H2O,SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL3299 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0497791405 | 2014-03-17 | UrbanProduction Wells | No Violations | My inspection found the well in production. The well was equipped with a plunger lift unit. The tank battery consisted of two, 100 barrel production tanks and two, locked separators. The met containment requirements. Two, identification signs were posted on the production tank. Bull plugs were properly installed on the load line. The lease road was in stable condition. The tank battery location was shared with permit number 2-3154. The well was placed into production prior to House Bill 278. |
For data sources see[9]