X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-155-23784"

m
m
Line 11: Line 11:
 
| County: [[Trumbull_County,_Ohio|Trumbull]]
 
| County: [[Trumbull_County,_Ohio|Trumbull]]
 
|-
 
|-
| Municipality: [[Weathersfield_Township,_Trumbull_County,_Ohio|Weathersfield Township]]
+
| Municipality: [[Weathersfield Township,_Trumbull_County,_Ohio|Weathersfield Township]]
 
|-
 
|-
 
| Operator Name: [[OHIO VALLEY ENERGY SYSTEM CORP]]
 
| Operator Name: [[OHIO VALLEY ENERGY SYSTEM CORP]]

Revision as of 14:22, 14 August 2019

Well Details

Well ID: 34-155-23784
Loading map...
Country: United States
State: Ohio
County: Trumbull
Municipality: Weathersfield Township
Operator Name: OHIO VALLEY ENERGY SYSTEM CORP
Well Pad ID:
Farm/Lease Name: MT CARMEL
License Status: Producing
License Date: 2005-04-21
Spud Date: 2005-06-24
Spud Drilling Contractor: CAPSTAR DRILLING
Final Drill Date: 2005-07-02
Well Total Depth: 5039 ft
Configuration: Vertical
Latitude: 41.185975686
Longitude: -80.73448616

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2005-04-21 Proposed Formations:CLINTON, Issued Date:4/21/2005, Expired Date:4/21/2006 6:00:00 AM, Drilling unit acres:40.71, Proposed Well Type:OG, Proposed Well Class:POOL
Correction to Well 2005-06-10 FOOTAGE CORRECTION, SHOULD BE "165'SL & 410'EL OF LOT 5".
Original Spud 2005-06-24
Completed 2005-07-02
Reached Total Depth 2005-07-02
Completion Report Received 2005-08-15
Construction Permit Expires 2006-04-21
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2005-10-06 4762 4826 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 15 114000 Gal 80000 1000 GALLONS IC ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2005 OHIO VALLEY ENERGY SYSTEM CORP 0 146 28
2006 OHIO VALLEY ENERGY SYSTEM CORP 17673 280 345
2007 OHIO VALLEY ENERGY SYSTEM CORP 13823 331 364
2008 OHIO VALLEY ENERGY SYSTEM CORP 20755 122 365
2009 OHIO VALLEY ENERGY SYSTEM CORP 12581 157 365
2010 OHIO VALLEY ENERGY SYSTEM CORP 9963 54 365
2011 OHIO VALLEY ENERGY SYSTEM CORP 8985 72 365
2012 OHIO VALLEY ENERGY SYSTEM CORP 8412 0 366
2013 OHIO VALLEY ENERGY SYSTEM CORP 6876 63 365
2014 OHIO VALLEY ENERGY SYSTEM CORP 7865 56 365
2015 OHIO VALLEY ENERGY SYSTEM CORP 8217 0 365
2016 OHIO VALLEY ENERGY SYSTEM CORP 8004 71 365
2017 OHIO VALLEY ENERGY SYSTEM CORP 7491 0 365
2018 OHIO VALLEY ENERGY SYSTEM CORP 6998 61 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2005 OHIO VALLEY ENERGY SYSTEM CORP Brine 0 28
2006 OHIO VALLEY ENERGY SYSTEM CORP Brine 50 345
2007 OHIO VALLEY ENERGY SYSTEM CORP Brine 150 364
2008 OHIO VALLEY ENERGY SYSTEM CORP Brine 45 365
2009 OHIO VALLEY ENERGY SYSTEM CORP Brine 39 365
2010 OHIO VALLEY ENERGY SYSTEM CORP Brine 0 365
2011 OHIO VALLEY ENERGY SYSTEM CORP Brine 45 365
2012 OHIO VALLEY ENERGY SYSTEM CORP Brine 0 366
2013 OHIO VALLEY ENERGY SYSTEM CORP Brine 0 365
2014 OHIO VALLEY ENERGY SYSTEM CORP Brine 0 365
2015 OHIO VALLEY ENERGY SYSTEM CORP Brine 0 365
2016 OHIO VALLEY ENERGY SYSTEM CORP Brine 0 365
2017 OHIO VALLEY ENERGY SYSTEM CORP Brine 0 365
2018 OHIO VALLEY ENERGY SYSTEM CORP Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0047309193 2011-09-21 UrbanPreliminary Restoration No Violations Preliminary Restoration meets all requirements.
0141982644 2005-06-30 Drill / Deepen / Reopen No Violations On site to take photos of rig and surrounding area . Capstar drilling at 2497 .
0982144855 2005-06-25 Drill / Deepen / Reopen No Violations Test B.O.P. at 600 psi with no loss after 15 minutes .
1935640914 2012-10-24 Preliminary Restoration No Violations I completed a Preliminary Restoration. I researched our database and found that ODNR Inspector Steve Ochs completed the Preliminary Restoration on 9/21/2011. The tank battery was surrounded by a chain link fence with slats, the proper dike, and contained one, 100 barrel oil storage tank with an activated charcoal filter, low-pressure relief valve, and lightning arrestor, one, 50 barrel brine storage tank, a separator, and the proper identification. The well was equipped with a plunger lift unit surrounded by a chain link fence with slats. I noticed no spills or leaks. The lease road was the parking lot for the school.

For data sources see[9]

References