X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-099-20810"

m
m
Line 11: Line 11:
 
| County: [[Mahoning_County,_Ohio|Mahoning]]
 
| County: [[Mahoning_County,_Ohio|Mahoning]]
 
|-
 
|-
| Municipality: [[Goshen_Township,_Mahoning_County,_Ohio|Goshen Township]]
+
| Municipality: [[Goshen Township,_Mahoning_County,_Ohio|Goshen Township]]
 
|-
 
|-
 
| Operator Name: [[DRY HOLE PRODUCING LP]]
 
| Operator Name: [[DRY HOLE PRODUCING LP]]

Revision as of 15:29, 14 August 2019

Well Details

Well ID: 34-099-20810
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Goshen Township
Operator Name: DRY HOLE PRODUCING LP
Well Pad ID:
Farm/Lease Name: FAULK-KING
License Status: Producing
License Date: 1977-12-01
Spud Date: 1978-01-23
Spud Drilling Contractor:
Final Drill Date: 1978-01-31
Well Total Depth: 5652 ft
Configuration: Vertical
Latitude: 40.969418653
Longitude: -80.90332683

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1977-12-01 504 UNITED PETROLEUM CORP GeoDate 12/1/77
Original Spud 1978-01-23 R.I. 4-20-77, R.I. 12-7-77 IP.A.F. & 4.5 BO
Completed 1978-01-31 R.I. 4-20-77, R.I. 12-7-77 IP.A.F. & 4.5 BO
Reached Total Depth 1978-01-31 R.I. 4-20-77, R.I. 12-7-77 IP.A.F. & 4.5 BO
Construction Permit Expires 1978-12-01 R.I. 4-20-77, R.I. 12-7-77 IP.A.F. & 4.5 BO
Change of Owner 2000-08-24 Operator changed from 504, UNITED PETROLEUM CORP to 4312, DRY HOLE PRODUCING
Record Last Modified 2013-10-03 R.I. 4-20-77, R.I. 12-7-77 IP.A.F. & 4.5 BO

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 5378 5448 17

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 1097 Bbl 75000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1988 EVERFLOW EASTERN PTNS L P 1300 0 184
1990 EVERFLOW EASTERN PTNS L P 2146 159 365
1991 EVERFLOW EASTERN PTNS L P 1281 72 365
1992 EVERFLOW EASTERN PTNS L P 1011 0 365
1993 EVERFLOW EASTERN PTNS L P 1564 8442 365
1994 EVERFLOW EASTERN PTNS L P 1724 81 365
1995 EVERFLOW EASTERN PTNS L P 1160 78 365
1996 EVERFLOW EASTERN PTNS L P 475 0 365
1997 EVERFLOW EASTERN PTNS L P 651 81 365
1998 EVERFLOW EASTERN PTNS L P 789 0 365
1999 EVERFLOW EASTERN PTNS L P 583 75 365
2000 EVERFLOW EASTERN PTNS L P 457 57 365
2004 DRY HOLE PRODUCING LP 133 43 365
2005 DRY HOLE PRODUCING LP 766 0 365
2006 DRY HOLE PRODUCING LP 976 44 365
2007 DRY HOLE PRODUCING LP 615 0 365
2008 DRY HOLE PRODUCING LP 335 29 365
2009 DRY HOLE PRODUCING LP 363 0 365
2010 DRY HOLE PRODUCING LP 322 0 365
2011 DRY HOLE PRODUCING LP 347 0 365
2012 DRY HOLE PRODUCING LP 414 0 366
2013 DRY HOLE PRODUCING LP 448 0 365
2014 DRY HOLE PRODUCING LP 0 355 365
2015 DRY HOLE PRODUCING LP 365 0 365
2016 DRY HOLE PRODUCING LP 343 0 365
2017 DRY HOLE PRODUCING LP 143 0 364
2018 DRY HOLE PRODUCING LP 783 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1988 EVERFLOW EASTERN PTNS L P Brine 0 184
1990 EVERFLOW EASTERN PTNS L P Brine 45 365
1991 EVERFLOW EASTERN PTNS L P Brine 25 365
1992 EVERFLOW EASTERN PTNS L P Brine 0 365
1993 EVERFLOW EASTERN PTNS L P Brine 0 365
1994 EVERFLOW EASTERN PTNS L P Brine 0 365
1995 EVERFLOW EASTERN PTNS L P Brine 55 365
1996 EVERFLOW EASTERN PTNS L P Brine 0 365
1997 EVERFLOW EASTERN PTNS L P Brine 0 365
1998 EVERFLOW EASTERN PTNS L P Brine 0 365
1999 EVERFLOW EASTERN PTNS L P Brine 0 365
2000 EVERFLOW EASTERN PTNS L P Brine 40 365
2004 DRY HOLE PRODUCING LP Brine 5 365
2005 DRY HOLE PRODUCING LP Brine 0 365
2006 DRY HOLE PRODUCING LP Brine 0 365
2007 DRY HOLE PRODUCING LP Brine 0 365
2008 DRY HOLE PRODUCING LP Brine 19 365
2009 DRY HOLE PRODUCING LP Brine 0 365
2010 DRY HOLE PRODUCING LP Brine 0 365
2011 DRY HOLE PRODUCING LP Brine 0 365
2012 DRY HOLE PRODUCING LP Brine 0 366
2013 DRY HOLE PRODUCING LP Brine 0 365
2014 DRY HOLE PRODUCING LP Brine 0 365
2015 DRY HOLE PRODUCING LP Brine 0 365
2016 DRY HOLE PRODUCING LP Brine 0 365
2017 DRY HOLE PRODUCING LP Brine 0 364
2018 DRY HOLE PRODUCING LP Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0594642690 2008-02-27 Production Wells Violations Noted I performed a random field inspection. I GPSd both the wellhead and the tank battery. The ID sign was posted. There was no dike around the tank battery. The owner/pumper stopped by(Jay Adams) to change the well chart. I talked about putting in a dike. He wasnt sure that a dike was needed because the well was an old. I told him he needed one installed.
1163502050 2008-05-13 Production Wells No Violations I performed a status check on an NOV. The dike around the tank battery has not been done yet. I called Mr. Jay Adams and Jay stated that he would get to it this week, weather permiting. I agreed. Case continues.
1887462362 2006-05-23 Production Wells No Violations The tank battery consists of 1-100 bbl storage tank, 1-separator and NO dike.
2098721795 2008-06-05 Production Wells Violations Noted I performed a NOV follow-up inspection. The dike has been installed. The ID signs were up and a Keep out sign posted. A lock was installed on the stock tank. This well has pasted NOV.

Violations Commited

Inspection ID Violation ID Violation Date Violation Code Violation Comments
0594642690 US-OH-126698 2008-02-27 No SPCC dike/or failure to keep dike free of water or oil
2098721795 US-OH-121426 2008-06-05 No SPCC dike/or failure to keep dike free of water or oil

For data sources see[9]

References