X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-099-22969"

m
m
Line 11: Line 11:
 
| County: [[Mahoning_County,_Ohio|Mahoning]]
 
| County: [[Mahoning_County,_Ohio|Mahoning]]
 
|-
 
|-
| Municipality: [[Austintown_Township,_Mahoning_County,_Ohio|Austintown Township]]
+
| Municipality: [[Austintown Township,_Mahoning_County,_Ohio|Austintown Township]]
 
|-
 
|-
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]

Revision as of 19:38, 14 August 2019

Well Details

Well ID: 34-099-22969
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Austintown Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: WOLFE UNIT
License Status: Producing
License Date: 2004-06-01
Spud Date: 2004-12-05
Spud Drilling Contractor: ROSE RUN DRILLING
Final Drill Date: 2004-12-12
Well Total Depth: 5601 ft
Configuration: Directional
Latitude: 41.068163198
Longitude: -80.74818968

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2004-06-01 84 EVERFLOW EASTERN PTNS L P Proposed Formation CLINTON Issued Date 6/1/2004 Expired Date 6/1/2005 6:00:00 AM
Inspector Comments Cement Job 2004-12-05 No predicted sand and gravel encountered. Hole took fluid but circulated cement. Approximately 20 bbls of returns. Cement stayed up.Cement Ticket Notes Inspector Reporting PATRICK JONNIE
Original Spud 2004-12-05 RBDMS Rec
Completed 2004-12-12 RBDMS Rec
Reached Total Depth 2004-12-12 RBDMS Rec
Completion Report Received 2005-01-14 RBDMS Rec
Correction to Well 2005-02-04 CORRECTION TO TARGET INFORMATION: SOURCE OF LOCATION: AS DRILLED SURVEY; TARGET FOOTAGE: 1750' SL & 10,040'EL OF TWP. (IN GREAT LOT 20); COORDINATES: X= 2,483,171 Y= 514,891. ELEV.= 1178'.
Construction Permit Expires 2005-06-01 RBDMS Rec
Record Last Modified 2017-02-15 RBDMS Rec

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2005-03-03 5343 5420 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 7 2905 Bbl 100000 1000 GALLONS HCL ACID

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2004 EVERFLOW EASTERN PTNS L P 0 0 0
2005 EVERFLOW EASTERN PTNS L P 17367 57 365
2006 EVERFLOW EASTERN PTNS L P 15358 62 365
2007 EVERFLOW EASTERN PTNS L P 10177 0 365
2008 EVERFLOW EASTERN PTNS L P 10037 0 365
2009 EVERFLOW EASTERN PTNS L P 7572 55 365
2010 EVERFLOW EASTERN PTNS L P 6057 0 181
2011 EVERFLOW EASTERN PTNS L P 3786 0 197
2012 EVERFLOW EASTERN PTNS L P 2397 0 156
2013 EVERFLOW EASTERN PTNS L P 6564 0 365
2014 EVERFLOW EASTERN PTNS L P 5669 0 170
2015 EVERFLOW EASTERN PTNS L P 1067 0 365
2016 EVERFLOW EASTERN PTNS L P 191 0 365
2017 EVERFLOW EASTERN PTNS L P 5276 0 365
2018 EVERFLOW EASTERN PTNS L P 5306 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2004 EVERFLOW EASTERN PTNS L P Brine
2005 EVERFLOW EASTERN PTNS L P Brine 60 365
2006 EVERFLOW EASTERN PTNS L P Brine 10 365
2007 EVERFLOW EASTERN PTNS L P Brine 0 365
2008 EVERFLOW EASTERN PTNS L P Brine 0 365
2009 EVERFLOW EASTERN PTNS L P Brine 21 365
2010 EVERFLOW EASTERN PTNS L P Brine 0 181
2011 EVERFLOW EASTERN PTNS L P Brine 0 197
2012 EVERFLOW EASTERN PTNS L P Brine 0 156
2013 EVERFLOW EASTERN PTNS L P Brine 0 365
2014 EVERFLOW EASTERN PTNS L P Brine 0 170
2015 EVERFLOW EASTERN PTNS L P Brine 0 365
2016 EVERFLOW EASTERN PTNS L P Brine 0 365
2017 EVERFLOW EASTERN PTNS L P Brine 0 365
2018 EVERFLOW EASTERN PTNS L P Brine 6 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0379463038 2005-01-19 Preliminary Restoration No Violations The drilling pits are now closed. Partial compliance.
0587904196 2004-12-06 Drill / Deepen / Reopen No Violations Arrived on site for a B.O.P. Test. Pressured up to 400 psi. The pressure dropped to 200 psi in less than fifteen minutes. Pressured up again to 450 psi and shut the BOP in. The pressure dropped to 400 psi then held for fifteen minutes at 400 psi.
0608820853 2004-12-07 Drill / Deepen / Reopen No Violations Mrs. Chris Foley called the Uniontown Office complaining of light and noise from a drilling rig next to her property. The light and noise was keeping her daughter from sleeping at night. Arrived on site and found that the noise level in the house was minimal. The daughters bedroom faces the rig. It was explained to Mrs. Foley that the tower lights had to be on as a warning to aircraft. The noise from the rig would be going on for approximately seven to ten days. (Mrs. Foley thought it would be three months) Mrs. Foley plans to place a comforter on the window to help cut down on the noise and light. If this fails she will send her daughter to her grandparents for a few days. Mrs. Foleys house is approximately 350 from the drilling rig. Went to the rig to see if anything could be done to lessen the noise and light problems. All the engine exhausts were pointing up into the air.
1102597295 2004-12-06 Drill / Deepen / Reopen No Violations Arrived on site for the surface job and found, the rig has three more sticks to drill. Drilling pits lined. Returned later for the surface job. No problems encountered.
1378848173 2007-04-11 Preliminary Restoration No Violations GPSd the wellhead and tank battery. The drilling pits were filled in. Vegetation was growing on the location. No erosion was visible. White fence around wellhead. No drilling equipment on location. This well and tank battery has passed the preliminary restoration.
1627951648 2013-01-16 Production Wells No Violations On 1/16/2013, I performed a status check on the above well site. The tank battery is equipped with one 100 barrel tank and one horizontal separator. The well has 1.5 tubing and is a plunger lift. Identification signs are posted. No violation were noted. The tanks are located under the cell tower. GPS 41.06627/-80.75189
1727485342 2005-04-26 Preliminary Restoration No Violations Partial compliance. The site has been graded but not seeded.

For data sources see[9]

References