Line 11: | Line 11: | ||
| County: [[Perry_County,_Ohio|Perry]] | | County: [[Perry_County,_Ohio|Perry]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Pleasant Township,_Perry_County,_Ohio|Pleasant Township]] |
|- | |- | ||
| Operator Name: [[STONEBRIDGE OPERATING CO LLC]] | | Operator Name: [[STONEBRIDGE OPERATING CO LLC]] |
Well ID: 34-127-25648 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.678403385,"lon":-82.13689994,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Perry | |
Municipality: Pleasant Township | |
Operator Name: STONEBRIDGE OPERATING CO LLC | |
Well Pad ID: | |
Farm/Lease Name: ESSELSTEIN | |
License Status: Producing | |
License Date: 1982-05-10 | |
Spud Date: 1982-06-11 | |
Spud Drilling Contractor: BEVERLY DRLG | |
Final Drill Date: 1982-06-15 | |
Well Total Depth: 3782 ft | |
Configuration: Vertical | |
Latitude: 39.678403385 | |
Longitude: -82.13689994 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1982-05-10 | 631 BT ENERGY CORP GeoDate 5/10/82 |
Oil and Gas | 1982-05-10 | Issued Date 5/10/82 Expired Date 11/1/82 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03782 Proposed Drill Depth 03782 |
Original Spud | 1982-06-11 | |
Completed | 1982-06-15 | |
Reached Total Depth | 1982-06-15 | |
Construction Permit Expires | 1982-11-01 | |
Completion Report Received | 1982-11-10 | |
Change of Owner | 2007-10-12 | Operator changed from 631, BT ENERGY CORP to 2070, STONEBRIDGE OPERATING CO |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3556 | 3578 | 0 |
2006-09-11 | 3564 | 3578 | 1 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 800 Bbl | 60000 | FRAC: 800 BBL H2O, 60M SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL7091 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0377448404 | 2014-02-21 | Production Wells | No Violations | I inspected this well to see if it has been put back into production. The well is still not back in production. I met with Keith and he told me that at there meeting this morning John Schneider said that they would be putting the well back in production as soon as they got there bond back. They are going to set a new meter and hook up the well. |
1236436443 | 2012-09-04 | Production Wells | No Violations | FOLLOW UP TO NOV # 1346777428 I met with Mr. Esselstein concerning no production of the gas well on his property, A chart graph had been installed on 7/25/2012. The graph did not show any activity. The production shown on RBDMS is below minimum production standards for 2011,2010,2009. This well consists of one 100 barrel tank, one gas separator, a sale meter and well head. I spoke with Keith Kregor, pumper for Stone bridge Oil, he has stated the well was down due to the fact it feeds into a sales line with two other wells, one of these wells had a hole in the 4 line, it has been repaired and Keith expects to have the Esselstein well back in production in one week. |
1346848452 | 2012-09-05 | Production Wells | No Violations | I spoke with Keith, pumper for stonbridge oil. Keith told me the well is one of three wells that feed into a SE Ohio gas line. One of the other wells had a hole in the line so that shut down the production, Keith expects the well to be up and producing gas in one week. |
1693162348 | 2016-01-05 | Production Wells | No Violations | I returned to this well to do a follow-up inspection on it. The violations have been resolved and the well is now capable of production. There are no violations at this time. |
2071134374 | 2013-09-10 | Production Wells | No Violations | The well was put back in production but the production tailed off. They brought a rig in and pulled tubing to swab well. The tubing was left out of the well. The pressure was checked about a week ago and is up to 20lbs. The company is either going to treat the well or plug it. |