X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-099-23077"

m
m
Line 11: Line 11:
 
| County: [[Mahoning_County,_Ohio|Mahoning]]
 
| County: [[Mahoning_County,_Ohio|Mahoning]]
 
|-
 
|-
| Municipality: [[Boardman_Township,_Mahoning_County,_Ohio|Boardman Township]]
+
| Municipality: [[Boardman Township,_Mahoning_County,_Ohio|Boardman Township]]
 
|-
 
|-
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]

Revision as of 19:50, 14 August 2019

Well Details

Well ID: 34-099-23077
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Boardman Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: FURGIUELE UNIT
License Status: Producing
License Date: 2008-04-17
Spud Date: 2008-05-05
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2008-05-09
Well Total Depth: 5780 ft
Configuration: Vertical
Latitude: 41.039789685
Longitude: -80.64388774

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-04-17 Proposed Formations:CLINTON/MEDINA, Issued Date:4/17/2008, Expired Date:4/17/2009 6:00:00 AM, Drilling unit acres:45.12, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2008-05-09
Completion Report Received 2008-06-12
Construction Permit Expires 2009-04-17
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2008-09-16 5494 5544 43

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 2918 Bbl 100000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2008 EVERFLOW EASTERN PTNS L P 1410 0 365
2009 EVERFLOW EASTERN PTNS L P 21892 70 365
2010 EVERFLOW EASTERN PTNS L P 11584 32 181
2011 EVERFLOW EASTERN PTNS L P 5094 0 197
2012 EVERFLOW EASTERN PTNS L P 13235 84 336
2013 EVERFLOW EASTERN PTNS L P 9238 33 365
2014 EVERFLOW EASTERN PTNS L P 6045 12 200
2015 EVERFLOW EASTERN PTNS L P 120 0 365
2016 EVERFLOW EASTERN PTNS L P 158 0 365
2017 EVERFLOW EASTERN PTNS L P 6255 0 365
2018 EVERFLOW EASTERN PTNS L P 6422 32 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2008 EVERFLOW EASTERN PTNS L P Brine 212 365
2009 EVERFLOW EASTERN PTNS L P Brine 90 365
2010 EVERFLOW EASTERN PTNS L P Brine 17 181
2011 EVERFLOW EASTERN PTNS L P Brine 0 197
2012 EVERFLOW EASTERN PTNS L P Brine 0 336
2013 EVERFLOW EASTERN PTNS L P Brine 0 365
2014 EVERFLOW EASTERN PTNS L P Brine 35 200
2015 EVERFLOW EASTERN PTNS L P Brine 0 365
2016 EVERFLOW EASTERN PTNS L P Brine 0 365
2017 EVERFLOW EASTERN PTNS L P Brine 0 365
2018 EVERFLOW EASTERN PTNS L P Brine 35 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0047583652 2008-07-23 Preliminary Restoration No Violations I performed a preliminary restoration status check. I GPSd the well. The tank battery has not been built yet. The top soil is still in a pile. The pits are closed and the debris is gone. This well has not passed preliminary restoration.
0667891087 2010-06-09 Production Wells No Violations I performed a random field inspection. I GPSd both the tank battery and the wellhead. I continued to walk around both the wellhead and the tank battery. This inspection satisfies 1501:9-9-05. There were no violations at this time.
0698820248 2009-08-18 Production Wells No Violations On 8/16/09 in the late afternoon I received a call from LT. Jim McCreary from the Boardman Fire Dept. pertaining to a line blow out on 8/16/09. On 8/17/09 I inspected the site and talked with George Strawn, Everflow Eastern. He stated that the logic(Computer to run the well) on the wellhead had failed. The well cycles every 45 minutes. The production line built up pressure. Then separator pop off failed. The 2 inch line off of the separator parted and blew gas. No brine spill or fire. Gas only. The Boardman fire department was on the scene. George Strawn was called out. The repair of the tank battery started Monday, 8/17/09. A different separator and pop off were installed. This complaint is resolved.
0793856295 2008-06-10 Preliminary Restoration No Violations I witnessed the partial drilling pits solidification and the closing of the pits. The drilling equipment and the debris are gone. The top soil pile is still on the location. I found no violations at this time.
1055303890 2008-05-07 Drill / Deepen / Reopen No Violations I performed a rig inspection. The location and the pit liners were in good shape. The drilling depth was 1980 and broke down. Rotary table drive bearings broke. I found no violations at this time.
1186103483 2008-05-13 Preliminary Restoration No Violations I performed a preliminary restoration status check. The pit liners were in good shape and the fluid level was down in pits 3 foot. I found no violations at this time. This well has not passed preliminary restoration.
1210164188 2008-05-06 Drill / Deepen / Reopen No Violations I performed a rig inspection. The ID sign was posted and the pit liners were in good shape. The location was in good shape. There were no violations at this time.;
1221481125 2008-09-11 Preliminary Restoration No Violations I performed a preliminary restoration status check. I GPSd both the wellhead and the tank battery. The drilling equipment and the debris are gone. The pits are closed. There is vegetation growth. The ID sign is posted. There is no fence yet around the tank battery or the wellhead. This well has not passed preliminary restoration.
1843300947 2008-05-06 Drill / Deepen / Reopen No Violations I witnessed the cementing of the 8 5/8 casing. I found no violations at this time.
1947033373 2008-05-08 Drill / Deepen / Reopen No Violations I performed a rig inspection. The drilling pits and the location were in good shape. The drilling depth was 4214. I found no violations at this time.
1951059769 2012-02-06 UrbanProduction Wells No Violations I conducted a status check on this site and found that the well head was fenced with screened chain link, and it is equipped with a plunger lift system. The tank battery consists of one 50 barrel stock tank equipped with flash arrestor and charcoal filter, one 50 barrel poly brine storage tank, and one separator. The thief hatch was closed and there was a bull plug installed in the draw valve. The tank battery was fenced with screened chain link, and the dike was free of vegetation and debris. Proper identification was posted, and I found no leaks or spills at the well head or the tank battery. I took new GPS coordinates of the well head and tank battery. No violations at this time.
2098043679 2008-10-15 Preliminary Restoration No Violations I performed a preliminary restoration status check. I GPSd both the wellhead and the tank battery. The drilling rig and the debris are gone. The drilling pits were solidified and closed. Good vegetation is growing. The fences are around the tank battery and the wellhead with ID signs on both. This well has PASSSED PRELIMINARY RESTORATION.

For data sources see[9]

References