X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-099-23123"

m
m
Line 11: Line 11:
 
| County: [[Mahoning_County,_Ohio|Mahoning]]
 
| County: [[Mahoning_County,_Ohio|Mahoning]]
 
|-
 
|-
| Municipality: [[Poland_Township,_Mahoning_County,_Ohio|Poland Township]]
+
| Municipality: [[Poland Township,_Mahoning_County,_Ohio|Poland Township]]
 
|-
 
|-
 
| Operator Name: [[BOCOR HOLDINGS, LLC]]
 
| Operator Name: [[BOCOR HOLDINGS, LLC]]

Revision as of 19:55, 14 August 2019

Well Details

Well ID: 34-099-23123
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Poland Township
Operator Name: BOCOR HOLDINGS, LLC
Well Pad ID:
Farm/Lease Name: LOWELLVILLE ROD & GUN UNIT
License Status: Producing
License Date: 2010-04-05
Spud Date: 2010-05-06
Spud Drilling Contractor: G & H DRLG
Final Drill Date: 2010-05-11
Well Total Depth: 5949 ft
Configuration: Vertical
Latitude: 41.025272720
Longitude: -80.54636314

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-04-05 Proposed Formations:CLINTON/MEDINA, Issued Date:4/5/2010, Expired Date:4/5/2011 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-05-11
Completion Report Received 2010-07-23
Construction Permit Expires 2011-04-05
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-09-20 5742 5813 47
2010-09-20 5869 5873 9

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 80600 Gal 60000 FRAC TREATMENT ALSO INCLUDED THE MEDINA SANDSTONE

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
0 0 0
2010 BOCOR HOLDINGS, LLC 804 0 191
2011 BOCOR HOLDINGS, LLC 3807 0 365
2012 BOCOR HOLDINGS, LLC 1814 0 366
2013 BOCOR HOLDINGS, LLC 2170 0 365
2014 BOCOR HOLDINGS, LLC 2739 0 365
2015 BOCOR HOLDINGS, LLC 2145 0 367
2016 BOCOR HOLDINGS, LLC 1955 0 365
2017 BOCOR HOLDINGS, LLC 1408 0 365
2018 BOCOR HOLDINGS, LLC 1457 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 BOCOR HOLDINGS, LLC Brine 350 191
2011 BOCOR HOLDINGS, LLC Brine 210 365
2012 BOCOR HOLDINGS, LLC Brine 85 366
2013 BOCOR HOLDINGS, LLC Brine 175 365
2014 BOCOR HOLDINGS, LLC Brine 155 365
2015 BOCOR HOLDINGS, LLC Brine 250 367
2016 BOCOR HOLDINGS, LLC Brine 80 365
2017 BOCOR HOLDINGS, LLC Brine 175 365
2018 BOCOR HOLDINGS, LLC Brine 105 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0047094108 2010-05-13 Preliminary Restoration No Violations The drilling rig is gone. The fluid level inside both pits were 3 feet down from ground level. This well has not passed preliminary restoration.
0372052001 2010-05-25 Preliminary Restoration No Violations I met with Todd Suckow, Kevin Hutchinson from BOCOR and Eric White the consultant on the drilling location. The well will be fracd on 5/28/10.
1046244371 2010-06-02 Preliminary Restoration No Violations The drilling pits have been solidified and closed. This well has not passed preliminary restoration.
1106245407 2010-06-30 Preliminary Restoration No Violations The top soil has been spread out around the drilling location. The ID sign was posted. The fence was not installed yet around the tank battery and the wellhead.
1273163790 2010-05-06 Drill / Deepen / Reopen No Violations I performed a rig inspection on G & H rig #91. The rig was drilling on fluid to 500. The kelly hose had a hole blown in it. Tripping out of the hole. The drilling pits took 2 days to jack hammer. A pad was installed between the liner and the rock. No visual leaks in the pit liners. There were no violations at this time.
1273495326 2010-05-07 Drill / Deepen / Reopen No Violations I witnessed the cementing of the 8 5/8 casing. There were no violations at this time.
1388244202 2010-05-10 Drill / Deepen / Reopen No Violations I performed a rig inspection on G & H rig #91. The drilling depth was 5671. Drilling on air/soap. The rig and location were in compliance with 1501:9-9-03. There were no violations at this time.
1670332037 2010-05-24 Preliminary Restoration No Violations The workover rig is on the well. The circulating pit is empty. The blow pit is down 2 feet. The drilling rig is gone. The debris has been removed. This well has not passed preliminary restoration.
1916820781 2010-08-16 UrbanPreliminary Restoration No Violations The fences have been installed around the tank battery and the wellhead. The ID sign was posted. This well PASSES PRELIMINARY RESTORATION.
2021444679 2010-05-07 Drill / Deepen / Reopen No Violations I performed a rig inspection on G & H drilling rig #91. The ID sign was posted. The drilling pits were in compliance. There were no violations at this time.
2124435586 2010-05-11 Drill / Deepen / Reopen No Violations I performed a rig inspection on G & H rig #91. The drilling depth was 5817. The rig made a bit trip. Reaming the hole down to 5817. Drilling on air/soap. The rig and location were in compliance with 1501:9-9-03. There were no violations at this time.

For data sources see[9]

References