X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-099-23195"

m
m
Line 11: Line 11:
 
| County: [[Mahoning_County,_Ohio|Mahoning]]
 
| County: [[Mahoning_County,_Ohio|Mahoning]]
 
|-
 
|-
| Municipality: [[Poland_Township,_Mahoning_County,_Ohio|Poland Township]]
+
| Municipality: [[Poland Township,_Mahoning_County,_Ohio|Poland Township]]
 
|-
 
|-
 
| Operator Name: [[HILCORP ENERGY COMPANY]]
 
| Operator Name: [[HILCORP ENERGY COMPANY]]

Revision as of 20:03, 14 August 2019

Well Details

Well ID: 34-099-23195
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Poland Township
Operator Name: HILCORP ENERGY COMPANY
Well Pad ID: US-OH-000621
Farm/Lease Name: POLAND-CLL1
License Status: Not Drilled
License Date: 2013-07-02
Spud Date:
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Horizontal
Latitude: 41.012729863
Longitude: -80.54353370

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-07-02 Proposed Formations:POINT PLEASANT, Issued Date:7/2/2013, Expired Date:7/2/2015 12:00:00 PM, Drilling unit acres:2474.17, Proposed Well Type:OG, Proposed Well Class:EDPW
Construction Permit Expires 2014-07-02
Record Last Modified 2018-11-01

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
1534793698 2017-10-05 Production Wells No Violations Northeast Regional Emergency Response Manager Terry Whitehair and myself performed a follow up complaint notice (5652 ) and a status check on the above location. The well is in production. It is a constant flow system. It equipped with a GPU unit. ID signs are posted at the well head. All safety areas are marked and emergency shut downs are marked. No noted violations at this time. There is one central oil/water collection system with twelve 500 barrels tanks. There is also One compressor and various fluid knock out systems on this pad. At this point the gas enters into a midstream pipeline system. No noted violations at this time

For data sources see[3]

References