If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Tuscarawas_County,_Ohio|Tuscarawas]] | | County: [[Tuscarawas_County,_Ohio|Tuscarawas]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Salem Township,_Tuscarawas_County,_Ohio|Salem Township]] |
|- | |- | ||
| Operator Name: [[POORBOY EXPLORATION LLC]] | | Operator Name: [[POORBOY EXPLORATION LLC]] |
Well ID: 34-157-22677 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.291892184,"lon":-81.52644106,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Salem Township | |
Operator Name: POORBOY EXPLORATION LLC | |
Well Pad ID: | |
Farm/Lease Name: BENDER E ROBINSON & E | |
License Status: Producing | |
License Date: 1976-09-29 | |
Spud Date: 1977-01-27 | |
Spud Drilling Contractor: | |
Final Drill Date: 1977-02-06 | |
Well Total Depth: 4931 ft | |
Configuration: Vertical | |
Latitude: 40.291892184 | |
Longitude: -81.52644106 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1976-09-29 | 157 LANDPROVEST INC GeoDate 9/29/76 |
Original Spud | 1977-01-27 | |
Completed | 1977-02-06 | |
Reached Total Depth | 1977-02-06 | |
CO | 1993-07-19 | 2172 NATLAND ENERGY CORP GeoDate 9/29/76 |
CO | 1996-01-12 | 5352 ARTEX OIL COMPANY GeoDate 9/29/76 |
Change of Owner | 2015-06-09 | Operator changed from 5352, ARTEX OIL COMPANY to 9156, POORBOY EXPLORATION INC |
Record Last Modified | 2019-06-04 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4782 | 4790 | 18 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2100 Bbl | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | SPARTA ENERGY CORP | 2596 | 0 | 0 |
1985 | SPARTA ENERGY CORP | 3056 | 0 | 330 |
1988 | LANDPROVEST INC | 534 | 0 | 184 |
1989 | LANDPROVEST INC | 2556 | 18 | 366 |
1991 | LANDPROVEST INC | 855 | 0 | 365 |
1992 | LANDPROVEST INC | 1341 | 0 | 366 |
1993 | LANDPROVEST INC | 1173 | 0 | 182 |
1994 | NATLAND ENERGY CORP | 1862 | 0 | 365 |
1995 | ARTEX OIL COMPANY | 1324 | 0 | 365 |
1996 | ARTEX OIL COMPANY | 1593 | 52 | 365 |
1997 | ARTEX OIL COMPANY | 1813 | 0 | 365 |
1998 | ARTEX OIL COMPANY | 1674 | 0 | 0 |
1999 | ARTEX OIL COMPANY | 1522 | 0 | 0 |
2000 | ARTEX OIL COMPANY | 1828 | 0 | 365 |
2001 | ARTEX OIL COMPANY | 1172 | 0 | 365 |
2002 | ARTEX OIL COMPANY | 1394 | 0 | 365 |
2003 | ARTEX OIL COMPANY | 1543 | 0 | 365 |
2004 | ARTEX OIL COMPANY | 1323 | 30 | 365 |
2005 | ARTEX OIL COMPANY | 1297 | 10 | 365 |
2006 | ARTEX OIL COMPANY | 943 | 0 | 365 |
2007 | ARTEX OIL COMPANY | 615 | 0 | 365 |
2008 | ARTEX OIL COMPANY | 922 | 0 | 365 |
2009 | ARTEX OIL COMPANY | 1123 | 0 | 365 |
2010 | ARTEX OIL COMPANY | 1249 | 19 | 365 |
2011 | ARTEX OIL COMPANY | 1060 | 0 | 365 |
2012 | ARTEX OIL COMPANY | 959 | 0 | 366 |
2013 | ARTEX OIL COMPANY | 813 | 0 | 365 |
2014 | ARTEX OIL COMPANY | 592 | 0 | 365 |
2015 | ARTEX OIL COMPANY | 352 | 0 | 365 |
2016 | POORBOY EXPLORATION LLC | 1328 | 0 | 300 |
2017 | POORBOY EXPLORATION LLC | 473 | 0 | 360 |
2018 | POORBOY EXPLORATION LLC | 377 | 0 | 360 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | SPARTA ENERGY CORP | Brine | 0 | 0 |
1985 | SPARTA ENERGY CORP | Brine | 35 | 330 |
1988 | LANDPROVEST INC | Brine | 25 | 184 |
1989 | LANDPROVEST INC | Brine | 0 | 366 |
1991 | LANDPROVEST INC | Brine | 35 | 365 |
1992 | LANDPROVEST INC | Brine | 0 | 366 |
1993 | LANDPROVEST INC | Brine | 0 | 182 |
1994 | NATLAND ENERGY CORP | Brine | 0 | 365 |
1995 | ARTEX OIL COMPANY | Brine | 0 | 365 |
1996 | ARTEX OIL COMPANY | Brine | 0 | 365 |
1997 | ARTEX OIL COMPANY | Brine | 0 | 365 |
1998 | ARTEX OIL COMPANY | Brine | ||
1999 | ARTEX OIL COMPANY | Brine | ||
2000 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2001 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2002 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2003 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2004 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2005 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2006 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2007 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2008 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2009 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2010 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2011 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2012 | ARTEX OIL COMPANY | Brine | 0 | 366 |
2013 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2014 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2015 | ARTEX OIL COMPANY | Brine | 0 | 365 |
2016 | POORBOY EXPLORATION LLC | Brine | 0 | 300 |
2017 | POORBOY EXPLORATION LLC | Brine | 0 | 360 |
2018 | POORBOY EXPLORATION LLC | Brine | 0 | 360 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1459396343 | 2019-03-18 | Production Wells | No Violations | Upon my arrival on location, I witnessed the well was equipped with 8.625 inch diameter casing, 4.5 inch diameter casing, 1.5 inch diameter tubing, and a plunger lift system. The valve on the tubing was closed and the valve on the casing was open. The production equipment included a steel 100 barrel tank, a steel 50 barrel tank, a horizonal GPU, and a chart recorder with a 2 by .750 inch orifice plate within an earthen dike. The production equipment was being shared with the Robinson-Bender 3 (2675). The production report was up to date and proper identification was present. |
1556546637 | 2019-04-28 | Production Wells | No Violations | |
1863905162 | 2019-04-29 | Production Wells | No Violations | Upon my arrival on location, I witnessed well owner working on cutting tree off his meter station. He plans to replace the meter and several fittings on the meter station. He will put the well back into production today. |
For data sources see[9]